Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Management Information Systems [MOIS470]
Scheduling CTC-470.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Creating the Project Plan
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
SWE Introduction to Software Engineering
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
XII- COST CONTROL, MONITORING & ACCOUNTING
Gantt Chart Engineering Design Development. Turner College and Career High School.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Cost Control Measures for Food Service Operations
Chapter 10 Project Monitoring and Control
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
Project Monitoring and Control by Hateem Ghafoor, PMP.
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Time Planning and Con trol Time-Scaled Network. Processes of Time Planning and Control activities 1.Visualize and define the activities. Job Logic 2.Sequence.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Geog 469 GIS Workshop Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Advanced Project Management Project Time Management Ghazala Amin.
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Copyright © 2003 Primavera Systems, Inc Primavera User Conference Schedule Bingo presented by Mike Stone w/Professional Project Management Services.
1 8. I MPLEMENTING THE P LAN Objective: To understand the principles of successfully implementing a plan, by communicating the plan to key site personnel,
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
PROJECT PLANNING AND SCHEDULLING
Project Management.
Project management Topic 2 Planning.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
1 PROJECT MONITORING & CONTROL. 2 Project Monitoring and Control Why do we monitor? What do we monitor? When to we monitor? How do we monitor?
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
TOPIC-8B- PROJECT COST CONTROL
Time Planning and Control Time-Scaled Network
Procuring Professional Services
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
TOPIC-8A- PROJECT TIME CONTROL
Project Planning and Scheduling
Activity Planning.
ENGINEERING MANAGEMENT (GE 404)
Time Planning and Control Time-Scaled Network
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
ARCH 435 PROJECT MANAGEMENT
Project Planning By Phaik San Liew.
ENGINEERING MANAGEMENT (GE 404)
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Project Time Con trol

Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved are in line with the planned results.  The main feature of control is action to correct performance deviations and to insure that expected results are forthcoming.  Controlling involves making sure that the results achieved are in line with the planned results.  The main feature of control is action to correct performance deviations and to insure that expected results are forthcoming.

 Process of Project Time Control 1. Establish an operational schedule. 2. Measure and report progress (Establish a progress monitoring and information feedback procedure). 3. Compare actual achievement with planned. 4. Check and analyze time progress and determine effect on completion date and milestones. 5. Plan corrective action  Bring work back to schedule.  Modify schedule. 6. Implement corrective action. 7. Update operational schedule. 1. Establish an operational schedule. 2. Measure and report progress (Establish a progress monitoring and information feedback procedure). 3. Compare actual achievement with planned. 4. Check and analyze time progress and determine effect on completion date and milestones. 5. Plan corrective action  Bring work back to schedule.  Modify schedule. 6. Implement corrective action. 7. Update operational schedule.

1.Establish Operational Schedule For project control purposes a hierarchy of schedules may be needed, depending on who will use it.  Key Dates Schedule  For owners and top-level management in terms of MILESTONES or KEY DATES.  Key Dates Schedule  For owners and top-level management in terms of MILESTONES or KEY DATES.  Detailed Schedule  For engineers, work supervisors, material suppliers and subcontractors.  A schedule of that particular engineer/supervisor work responsibility.  Provide him with a day-to-day forecast of field operations.  Critical activities and free float values should be noted.  Covers limited time spans (2 weeks or 30 days).  Tabular listings and computer-printed bar charts are common forms.  Detailed Schedule  For engineers, work supervisors, material suppliers and subcontractors.  A schedule of that particular engineer/supervisor work responsibility.  Provide him with a day-to-day forecast of field operations.  Critical activities and free float values should be noted.  Covers limited time spans (2 weeks or 30 days).  Tabular listings and computer-printed bar charts are common forms.

2.Measure and Report Progress Methods  Estimated number of working days req. to complete the activity.  Estimated % completion of the activity.  Quantities of work units put in place.Methods  Estimated number of working days req. to complete the activity.  Estimated % completion of the activity.  Quantities of work units put in place. Equations  Working days to complete = d (1 - P/100)  Working days to complete = d (1 – (W/T)) Where d= total activity duration in working days P = estimated percentage of completion W= number of work units put into place. T= total number of work units associated with the activity. Based on the assumption of straight-line variation between time and work accomplishmentEquations  Working days to complete = d (1 - P/100)  Working days to complete = d (1 – (W/T)) Where d= total activity duration in working days P = estimated percentage of completion W= number of work units put into place. T= total number of work units associated with the activity. Based on the assumption of straight-line variation between time and work accomplishment

2.Measure and Report Progress  How often?  Balance between management benefits and costs and efforts.  To serve other reports benefits such as cost control.  According to project characteristics and peculiarities.  Balance between management benefits and costs and efforts.  To serve other reports benefits such as cost control.  According to project characteristics and peculiarities.  Weekly Progress reports  A common procedure in many industries.  Listing those activities that started, finished, or were in progress during the week and indicating their stages of completion.  Must include procurement, material delivery information, …..  Chose a cutoff date, to be selected to serve both time management and labor cost accounting.  A common procedure in many industries.  Listing those activities that started, finished, or were in progress during the week and indicating their stages of completion.  Must include procurement, material delivery information, …..  Chose a cutoff date, to be selected to serve both time management and labor cost accounting.

WEEKLY PROGRESS REPORT Project: Highway bridgeWeek ending: Wednesday, July 21 (working day 27) Job. No: Prepared by: K.M. ActivityActivity Number Date Started Date Completed Percent Complete Working days to complete A110-July B C D150July E160July 16July Measure and Report Progress

 Field Progress Narrative  To accompany weekly progress reporting.  Discussion of projected project features.  General statement about time status.  Critical or low float activities in difficulty.  Potential trouble spots.  Exceptionally well project areas.  To accompany weekly progress reporting.  Discussion of projected project features.  General statement about time status.  Critical or low float activities in difficulty.  Potential trouble spots.  Exceptionally well project areas. 2.Measure and Report Progress

3.Compare and Analysis of Project Progress Concerned primarily with determining the effect of the latest information on the project completion date and any milestone goals.  1 st - A quick and simple check for critical activities status.  2 nd - Check the possibility of a new critical path. Concerned primarily with determining the effect of the latest information on the project completion date and any milestone goals.  1 st - A quick and simple check for critical activities status.  2 nd - Check the possibility of a new critical path. SIGNS OF DANGER:  Activities fall behind LS schedule.  Resource availability delays.  Realizing that time duration of future activities have been materially underestimated.  Change logic becomes necessary. SIGNS OF DANGER:  Activities fall behind LS schedule.  Resource availability delays.  Realizing that time duration of future activities have been materially underestimated.  Change logic becomes necessary.

4.Corrective Actions  When there are small delays that are within network time contingency, no action is usually required. Time Reduction Technique  Otherwise use Time Reduction Technique to bring project back on schedule.  Make periodic job progress meetings to enhance time management efficiency.  Weekly, biweekly, monthly.  Project managers, field supervisors, major subcontractors, material suppliers, and owner representative.  When there are small delays that are within network time contingency, no action is usually required. Time Reduction Technique  Otherwise use Time Reduction Technique to bring project back on schedule.  Make periodic job progress meetings to enhance time management efficiency.  Weekly, biweekly, monthly.  Project managers, field supervisors, major subcontractors, material suppliers, and owner representative.

5.Network Updating (Rescheduling)  Making necessary network corrections and re-computing activity times and float times.  Concerned with determining the effect of schedule deviations and plan changes on the portions of the project yet to be constructed.  Making necessary network corrections and re-computing activity times and float times.  Concerned with determining the effect of schedule deviations and plan changes on the portions of the project yet to be constructed. INFORMATION NEEDED:  New activities to be added.  Existing activities to be deleted.  Changes in the resource availability and delivery dates.  Changes in the job logic.  New estimate of the time required to finish unfinished activities.  Changes in the scope of work.  ………………………………. INFORMATION NEEDED:  New activities to be added.  Existing activities to be deleted.  Changes in the resource availability and delivery dates.  Changes in the job logic.  New estimate of the time required to finish unfinished activities.  Changes in the scope of work.  ……………………………….

The initial AON diagram for a small engineering project is shown below with its planned activity times in days. At the end of the 15 th day, the field progress report gives you the following information:  Activity “A” was completed on schedule.  Activity “B” started as planned but four days were lost due to waiting for the required resources.  Activity “C” was completed one day earlier.  The remaining duration of Activity “D” is 2 days.  The duration of activity “H” will be reduced to 12 days instead of 17 days.  The activity “F” cannot start until the morning of day 22.  Activity “Z” is expected to take two days more.  Due to owner requirement the volume of work of activity “X” will be increased by 50%. Required: Construct the updated AON diagram, calculate the early and late start times of each activity, and indicate the critical path. The initial AON diagram for a small engineering project is shown below with its planned activity times in days. At the end of the 15 th day, the field progress report gives you the following information:  Activity “A” was completed on schedule.  Activity “B” started as planned but four days were lost due to waiting for the required resources.  Activity “C” was completed one day earlier.  The remaining duration of Activity “D” is 2 days.  The duration of activity “H” will be reduced to 12 days instead of 17 days.  The activity “F” cannot start until the morning of day 22.  Activity “Z” is expected to take two days more.  Due to owner requirement the volume of work of activity “X” will be increased by 50%. Required: Construct the updated AON diagram, calculate the early and late start times of each activity, and indicate the critical path.  Example