Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated.

Slides:



Advertisements
Similar presentations
Update on Data / MC Comparisons for Low Hadronic Energy CC-like Events Reminder of problem Fiducial studies with more MC statistics Effect of offset in.
Advertisements

Cygnus Paper Analysis & A 4 Properties Aous Abdo Michigan State University Milagro Collaboration Meeting LANL. December 18-19, 2006.
Antonis Leisos KM3NeT Collaboration Meeting the calibration principle using atmospheric showers the calibration principle using atmospheric showers Monte.
June 1, 2005Milagro Collaboration Meeting TPed Shifting and the Crab Curtis Lansdell University of Maryland.
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Alignment study 19/May/2010 (S. Haino). Summary on Alignment review Inner layers are expected to be kept “almost” aligned when AMS arrives at ISS Small.
Calibration of NT200+ with the external Laser Antipin Konstantin MEPhI (Moscow) Zeuthen,
Study of GEM-TPC Performance in Magnetic Fields Dean Karlen, Paul Poffenberger, Gabe Rosenbaum University of Victoria and TRIUMF, Canada 2005 ALCPG Workshop.
TeVPA, July , SLAC 1 Cosmic rays at the knee and above with IceTop and IceCube Serap Tilav for The IceCube Collaboration South Pole 4 Feb 2009.
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION.
Page 1 Calculating the Beam Position at the Ecal for DESY Run (Independent of Tracking) Hakan Yilmaz.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Characterization of Orbiting Wide-angle Light-collectors (OWL) By: Rasha Usama Abbasi.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
IceTop Tank Calibration Abstract This report outlines the preliminary method developed to calibrate IceTop tanks using through going single muon signals.
Sean Grullon with Gary Hill Maximum likelihood reconstruction of events using waveforms.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Status of GRB Scaler Analysis David Williams Taylor Aune.
W  eν The W->eν analysis is a phi uniformity calibration, and only yields relative calibration constants. This means that all of the α’s in a given eta.
Preliminary comparison of ATLAS Combined test-beam data with G4: pions in calorimetric system Andrea Dotti, Per Johansson Physics Validation of LHC Simulation.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
15 Dec 2010 CERN Sept 2010 beam test: Sensor response study Chris Walmsley and Sam Leveridge (presented by Paul Dauncey) 1Paul Dauncey.
Andreas Horneffer for the LOPES Collaboration Detecting Radio Pulses from Air Showers with LOPES.
28 th ICRC Tsukuba Conor Masterson, H.E.S.S. Observations of Galactic Sources with H.E.S.S. Conor Masterson, MPI-K, for the H.E.S.S. Collaboration.
Moriond 2001Jordan GoodmanMilagro Collaboration The Milagro Gamma Ray Observatory The Physics of Milagro Milagrito –Mrk 501 –GRB a Milagro –Description.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
1 MTD Calibration for Cosmic Ray Triggered Data in RUN 10 at STAR Lijuan Ruan (BNL), Liang Li (UT Austin) 04/01/ Workshop on STAR MTD Production.
EAS Reconstruction with Cerenkov Photons Shower Simulation Reconstruction Algorithm Toy MC Study Two Detector Configuration Summary M.Z. Wang and C.C.
Point Source Search with 2007 & 2008 data Claudio Bogazzi AWG videconference 03 / 09 / 2010.
Analysis chain for MAGIC Telescope data Daniel Mazin and Nadia Tonello Max-Planck-Institut für Physik München D.Mazin, N.Tonello MPI for Physics, Munich.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
BigCal Reconstruction and Elastic Event Selection for GEp-III Andrew Puckett, MIT on behalf of the GEp-III Collaboration.
1 Endcap C SCT Efficiency Calculation Update Nicholas Austin University of Liverpool Operations Meeting June 2007.
A. Smith UMD, April 20-21, 2007 Milagro collaboration meeting The Hidden Potential of the “Gamma’’ Data. The Milagro Gamma-Hadron separation is bases on.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
A Clustering Algorithm for LumiCal Halina Abramowicz, Ronen Ingbir, Sergey Kananov, Aharon Levy, Iftach Sadeh Tel Aviv University DESY Collaboration High.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
Bartol Flux Calculation presented by Giles Barr, Oxford ICRR-Kashiwa December 2004.
FADC Time Study EJ, HD 10/09. Purpose: to test Hai Dong’s firmware implementation of Indiana U. timing algorithm NOT meant to be a definitive study of.
A First Look At VERITAS Data Stephen Fegan Vladimir Vassiliev UCLA.
Reconstructing energy from HERD beam test data Zheng QUAN IHEP 3 rd HERD work shop Xi’an, 20 Jan
Peterson xBSM Optics, Beam Size Calibration1 xBSM Beam Size Calibration Dan Peterson CesrTA general meeting introduction to the optics.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
Status Update on the Monte Carlo Simulation Vlasios Vasileiou April 20-21, 2007 Milagro Collaboration Meeting.
Penny Kasper Fermilab Heavy Quarkonium Workshop 21 June Upsilon production DØ Penny Kasper Fermilab (DØ collaboration) 29 June 2006 Heavy Quarkonium.
Detecting Air Showers on the Ground
Development of a pad interpolation algorithm using charge-sharing.
Event by Event Energy Estimation Algorithm and Determination of Spectra (Update) Branden T. Allen, MILAGRO Colaboration Meeting, May 2006.
Milagro at Tibet Gus Sinnis LANL/P-23. Challenge and Opportunity Milagro will run for ~2 more years (or less) No viable candidate to replace Milagro on.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
January 21, 2005Peter Rovegno and David Williams, Milagro Collaboration Meeting 1 Background Rejection using Angle Fit Quality Source analysis has an implicit.
Timing Constants for Outriggers using the Milagro Laser Matthew E. Wilson November 16, 2003.
Gus Sinnis RICAP, Rome June 2007 The Milagro Observatory: Recent Results & Future Plans Gus Sinnis Los Alamos National Laboratory for the Milagro Collaboration.
Brenda Dingus Jan 2005 New Laser Calibration Status  New Laser vs Old Laser  Safety  Pond Data  Outrigger Data  How to Combine?
LNF 12/12/06 1 F.Ambrosino-T. Capussela-F.Perfetto Update on        Dalitz plot slope Where we started from A big surprise Systematic checks.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
Comparison of algorithms for hit reconstruction in the DTs: Test of calibration procedures for t trig and drift velocity on Test Beam data Test of calibration.
OD Tuning: SK-IV Roger Wendell TMC Meeting
Michele Faucci Giannelli
Daniel Mazin and Nadia Tonello Max-Planck-Institut für Physik München
Tracking results from Au+Au test Beam
techniques and studies
Muon momentum scale calibration with J/y peak
Fits for Pinhole and FresnelZonePlate
Presentation transcript:

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated muon layer hits in angle fit. Tasks Performed: Determined calibrations constants from laser data Tpeds & electronic slewing

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated muon layer hits in angle fit. Tasks Performed: Determined calibrations constants from laser data Tpeds & electronic slewing Determined parameterizations of the effects of shower-front shape (curvature) and shower thickness (sampling) on the timing distributions of event hits.

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated muon layer hits in angle fit. Tasks Performed: Determined calibrations constants from laser data Tpeds & electronic slewing Determined parameterizations of the effects of shower-front shape (curvature) and shower thickness (sampling) on the timing distributions of event hits. Re-optimized angle fitting method (cuts, etc.)

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated muon layer hits in angle fit. Tasks Performed: Determined calibrations constants from laser data Tpeds & electronic slewing Determined parameterizations of the effects of shower-front shape (curvature) and shower thickness (sampling) on the timing distributions of event hits. Re-optimized angle fitting method (cuts, etc.) Modified standard offline code to implement these changes

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated muon layer hits in angle fit. Tasks Performed: Determined calibrations constants from laser data Tpeds & electronic slewing Determined parameterizations of the effects of shower-front shape (curvature) and shower thickness (sampling) on the timing distributions of event hits. Re-optimized angle fitting method (cuts, etc.) Modified standard offline code to implement these changes Checked for improvements in angle fitting using MC gammas and real data.

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 2 Calibrations: Need tped, slewing and TOT to PE Andy S. made first attempt at PE cals. Laser calibration set used: Set collected in July & August 2003 by Matt Wilson, Xianwu Xu, and Scott DeLay (THANKS to ALL!) Two functional sets: Tpeds set Matt ran a single (same) fiber to each outrigger Outrigger 116 as reference (periodically fired to check systematics) Fixed high light level of HiTOT > 500, couple thousand shots Slewing set used installed fiber network and new optical switch fired full patch at a time (varied from 1 to 10 tanks per patch) light levels from < 1 PE to ~ 1000 PE, ~ 1000 shots per light level

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 3 Calibrations (cont): Slewing determination Computed median/peaks of leading edges versus tot

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 3 Calibrations (cont): Slewing determination Computed median/peaks of leading edges versus tot Fit to same functional form as pond pmts, except added parameter of max. TOT value above which slewing is flat

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 3 low edge high edge Calibrations (cont): Slewing determination Computed median/peaks of leading edges versus tot Fit to same functional form as pond pmts, except added parameter of max. TOT value above which slewing is flat Determined that timing resolution for low leading edge is better than high leading edge:

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 4 Calibrations (cont): Slewing & Tped determination Applied the slewing corrections before fitting Tpeds Example slewing curves and Tped distributions: Good slewing curve: large TOT range!

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 5 Calibrations (cont): Slewing & Tped determination Applied the slewing corrections before fitting Tpeds Example slewing curves and Tped distributions: Poor slewing curve: small TOT range!

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 6 Calibrations (cont): Need outrigger array – pond timing offset. Used real data events with theta < 10 o and cores fitted on pond. Used “inner ring” of outriggers (#1 - #32) MC gammas indicate these hits should be centered at zero, so free of any shower front shape/width effects The Tx peaks of these outriggers were distributed rough Gaussian with width of ~ 1.5 ns. Summary: I have 141 out of 175 outriggers with fair to good slewing and tped cals.

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 7 Shower front shape/width timging effects parameterization curvature, sampling, weights From experiences with Cygnus experiment decided to do timing corrections and weights (i.e. Tchi widths) as two 2-D functions of counter-core distance (m) and hit pulse height. Used MC 3.2 gammas with nfit > 50. Parameterized shifts in angle fit Tchi peaks and Tchi widths vs. counter-core distance and pulse heights Divided counter-core distance into thirteen 10 m bins For each of these bins, divided pulse heights into 69 PE bins with widths: 1-10 PE – 1 PE PE – 2 PE PE – 5 PE PE – 10 PE Did this for AS layer, MUON layer and outriggers separately

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 8 Shower front shape/width timging effects parameterization (cont.) For each of the 3 x 897 histograms, I fit the peak region to a Gaussian For hits > 10 PE I used the fitted Gaussian width For hits < 10 PE I determined the FWHM and divided by 2.38 I then fit the peaks vs. pulse height and widths vs. pulse height for each of the 13 counter-distance bins. Sample plots: Please see memo! Optimized angle fit method Since changed timing widths/weights, and included many more hits in the angle fits, needed to re-optimize the following parameters: Tchi cuts for keeping hits in the angle fit they were: 2.75, 1.75, sigma changed to: 5.00, , 1.00 sigma

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 9 Optimized angle fit method (cont.) Since changed timing widths/weights, and included many more hits in the angle fits, needed to re-optimize the following parameters: PE cuts for each fit pass: they were: 2.25, 1.75, 1.25, 0.75, 0.50 PE changed to: 3.00, 2.50, 2.00, 1.50, 0.50 PE Introduced relative global hit weights between the AS layer, MUON layer and outriggers RELAX parameter – if nfit is < than this, relax pe cut one level change from 450 to 1000

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 10 Optimized angle fit method (cont.) Added cut on fraction of hits with PE > 3 and Tchi > 3 s. (F big ) Cuts out large fraction of gamma events with cores outside array example can cut 80% outside cores and only lose 5% inside cores.

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 11 Predictions from MC gammas: Example MC gamma fit: nfit for as, muon, outriggers black dots indicate used in fit

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 12 Predictions from MC gammas (cont): Delangle distributions for various triggered events Blue – new fit, Red – old fit medians: Blue: 0.56 o, Red: x.xx o

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 13 Predictions from MC gammas (cont): Delangle distributions for various triggered events Blue – new fit, Red – old fit medians: Blue: x.xx o, Red: x.xx o

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 14 Predictions from MC gammas (cont): Delangle distributions for various triggered events Blue – new fit, Red – old fit medians: Blue: x.xx o, Red: x.xx o

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 15 Predictions from MC gammas (cont): Nfit distributions Blue – new fit, Red – old fit medians: Blue: 100, Red: 46 All trigger types

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 16 Results using real events: Example fitted event: nfit for as, muon, outriggers black dots indicate used in fit Total nfit

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 17 Results using real events: Deleo distributions for various trigger events Blue – new fit, Red – old fit medians: Blue: x.xx, Red: x.xx

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 18 Results using real events: Deleo distributions for various trigger events Blue – new fit, Red – old fit medians: Blue: x.xx, Red: x.xx

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 19 Results using real events: Deleo distributions for various trigger events Blue – new fit, Red – old fit medians: Blue: x.xx, Red: x.xx

Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 20 Results using real events: Ran new fitting on crab only 95 days so far s = / o N s ~ 2.1