LINAC STABILISATION (INCLUDING FF) MECHANICAL STABILISATION AND NANO POSITIONING WITH ANGSTROM RESOLUTION The research leading to these results has received.

Slides:



Advertisements
Similar presentations
FINAL FOCUS: COMBINATION OF PRE ISOLATOR AND ACTIVE STABILISATION K. Artoos, C. Collette, R. Leuxe, C.Eymin, P. Fernandez, S. Janssens * The research leading.
Advertisements

STABILISATION WG MEETING th FEBRUARY 2013 CTC SUMMARY The research leading to these results has received funding from the European Commission under.
CLIC stabilisation contribution A.Jeremie, B.Caron, A.Badel, R.LeBreton, J.Lottin, G.Balik, J.P.Baud, L.Brunetti, G.Deleglise, S.Vilalte.
Seismic sensors in PACMAN
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
Vibration Stabilization Experimental Results CLIC Main Beam and Final Focus Magnet Stabilization A.Jeremie LAPP: A.Jeremie, S.Vilalte, J.Allibe, G.Balik,
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
STABILIZATION FOR LHC INNER TRIPLETS S. Janssens, K. Artoos, M. Guinchard NOT for Distribution.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
STABILISATION WP STATUS CTC DECEMBER 2012 The research leading to these results has received funding from the European Commission under the FP7 Research.
STABILIZATION STATUS AND PLANS The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
Introduction to seismic sensors (subject 3.2) Peter Novotny PACMAN meeting, CERN, 7 October 2014.
STUDY OF THE HYBRID CONTROLLER ELECTRONICS FOR THE NANO-STABILISATION OF MECHANICAL VIBRATIONS OF CLIC QUADRUPOLES P. Fernández Carmona, K. Artoos, C.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
1 Nanopositioning of the main linac quadrupole as means of laboratory pre-alignment David Tshilumba, Kurt Artoos, Stef Janssens D. Tshilumba, CERN, 03.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
R&D ON STABILIZATION MBQ: FROM CDR TO TECHNICAL IMPLEMENTATION PHASE K. Artoos, C. Collette **, P. Fernandez Carmona, M. Guinchard, C. Hauviller, S. Janssens.
MECHANICAL STABILIZATION AND POSITIONING OF CLIC (MAIN BEAM) QUADRUPOLES WITH SUB- NANOMETRE RESOLUTION K. Artoos, C. Collette **, M. Esposito, P. Fernandez.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Hard or Soft ? C. Collette, K. Artoos, S. Janssens, P. Fernandez-Carmona, A. Kuzmin, M. Guinchard, A. Slaathaug, C. Hauviller The research leading to these.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
Main beam Quad Stabilisation: Expected performance demonstration by end 2010 CLIC-ACE K.Artoos Contribution to slides by: C. Hauviller, Ch.
PROGRESS ON THE CLIC MBQ STABILIZATION R&D K. Artoos, C. Collette **, M. Esposito, P. Fernandez Carmona, M. Guinchard, S. Janssens*, R. Leuxe, R. Morón.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
RECENT EXPERIMENTAL RESULTS ON NON- MAGNETIC VIBRATION ISOLATION Christophe Collette Credits to: David Tshilumba, Stef Janssens,
STABILISATION AND PRECISION POINTING QUADRUPOLE MAGNETS IN THE COMPACT LINEAR COLLIDER S. Janssens, P. Fernandez Carmona, K. Artoos, C. Collette, M. Guinchard.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
NANO-POSITIONING POSSIBILITIES FOR FUTURE ACCELERATOR MAGNETS K. Artoos, 28 November 2014 K. Artoos, C. Collette, M. Esposito, P. Fernandez Carmona, M.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
Beam Physics Issues of Main Beam Stabilisation A.Jeremie (LAPP) C.Hauviller (CERN)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
08:30 Development of nanometer electron beam size monitor
Nano stabilisation studies for CLIC
Vibration issues at Linear Colliders:
CLIC magnets precise positioning
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Topics on Vibration Issues
Sub-nanometer displacement measurements in seismic sensors.
CLIC MBQ: from CDR to technical implementation phase CLIC Main beam quadrupole Mechanical stabilization S. Janssens*, K. Artoos, C. Collette**, P. Fernandez.
Need for Alignment Position of off-momentum proton w.r.t. beam
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
A.Jeremie Some drawings from different CLIC’08 presentations
Presentation transcript:

LINAC STABILISATION (INCLUDING FF) MECHANICAL STABILISATION AND NANO POSITIONING WITH ANGSTROM RESOLUTION The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures project EuCARD K. Artoos, C. Collette (ULB), M. Esposito, C. Eymin, P. Fernandez Carmona, S. Janssens, R. Leuxe, H. Mainaud Durand, M. Modena A. Jeremie, J. Allibe, L. Brunetti, J.-P. Baud, G. Balik, G. Deleglise, S. Vilalte, B. Caron, C. Hernandez

Outline 2  Ground motion and CLIC Requirements  Obtained results  Short view on ultimate performance limitations

Ground motion 3 ~40 nm 1 nm 20 km

4 Vertical MBQ1.5 nm at 1 Hz Vertical Final Focus 0.2 nm at 4 Hz Lateral MBQ, FF 5 nm at 1 Hz 5 nm at 4 Hz Integrated r.m.s. displacement BUT Final requirement is Integrated Luminosity Luminosity, beam size and alignment Possible mitigation techniques: Alignment B.P.M. + dipole correctors B.P.M. + Nano positioning Seismometers + Dipole correctors Mechanical stabilization with seismometers Requirements Mechanical stability: f

Nano positioning 5 « Nano-positioning» feasibility study Modify position quadrupole in between pulses (~ 5 ms) Range ± 5 μ m, increments 10 to 50 nm, precision ± 0.25 nm Lateral and vertical In addition/ alternative dipole correctors Use to increase time to next realignment with cams

Other requirements stabilisation support 6 Accelerator environment High radiation Stray magnetic field Stiffness-Robustness Applied forces (water cooling, vacuum, power leads, cabling, interconnects, ventilation, acoustic pressure) -Compatibility alignment -Transportability/Installation Available space Integration in two beam module 620 mm beam height Integration in cantilever tube FF

Concept for MBQ 7 Inclined stiff piezo actuator pairs with flexural hinges (vertical + lateral motion) (four linked bars system) X-y flexural guide to block roll + longitudinal d.o.f.+ increased lateral stiffness. (Seismometers)/ inertial reference masses for sensors Alignment Eucard deliverable

8 Type 1 Collocated pair X-y proto Seismometer FB max. gain +FF (FBFFV1mod): 7 % luminosity loss (no stabilisation 68 % loss) Concept demonstration actuator support with staged test benches EUCARD deliverable

X-y prototype: Demonstration Nano positioning Resolution, precision, accuracy 9 Capacitive sensor 3 beam interferometer Optical incremental encoder Actuators equipped with strain gauges

X-y positioning: Study precision, accuracy and resolution 10 The precision required (0.25 nm): demonstrated with optical rulers in a temperature stable environment, in air for simultaneous x and y motion. Still increase speed

11 Final focus concept Direct disturbances: Acoustic noise, cooling … RIGID GRIDER Active Isolation KICKER QD0 (FF magnet) Final Focus (FF) Position at I.P. Beam (e - ) Beam (e + ) Detector FFM magnetic axis Desired beam position (FF) Post collision BPM Pre-isolator

12 Concept demonstration Balik et al, “Active control of a subnanometer isolator“, JIMMSS. (accepted) Spec : 0,2 nm 4 Hz Result : 0,6 nm 4 Hz Indication of sensor limit

13 Concept demonstration B. Caron et al, 2012, , Contr. Eng. Pract., 20 (3). ; G. Balik et al, 2012, N.I.M. A., GM B10GM B Reduction of luminosity losses down to 2% for different GM models Demonstration feasability for CLIC MBQ and FF, «can we do better ?»

14 Performance limitations of a mechatronics system NoiseMechanics MaterialControl Temperature Electrical noise (Johnson,…) Electromagnetic noise SEU Digitalisation, quantisation Spurious noise, cross talk Elasticity, elastic limit, stress limit Damping Fatigue Ageing (Radiation, Curie-T, humidity) Dimensions, mass, stiffness Range Degrees of freedom Precision guidance Modal behaviour Freely adapted from J. Moerschell Non linearity Bandwidth, instabilities Control delay Parameter uncertainties Controller authority, collocation

15 K.Artoos, Stabilisation WG, 21th February 2013 Machine precision vs size C. Collette

16 Mass/Actuator Resolution/ Range/k/ Bandwidth A Bandwidth is limited by Remark about load compensating springs: Actuator slew rate Frequency Amplitude Range Force Load compensation reduces range + bandwidth Improves resolution *

17 K.Artoos, Stabilisation WG, 21th February 2013 Machine precision vs size C. Collette Technological limitation for larger components

18 Resolution limitations Sensors Stabilisation Limitations: 1.Thermal stability (*alignment) 2.EM stray fields 3.Sensor resolution (wavelength light) Expected maximum one order of magnitude improvement resolution in next decade (Without major technological innovation) Low freq. is where you can win the most Michelson Stabilised LASER

Nano positioning sensors 19 Heidenhain : 1nm resolution < 1000 CHF Renishaw: 1 nm resolution < 1000 CHF Smallest LSB can be used as quadrature …. 0.1 nm resolution is already possible Technological innovation: digital optical encoders

20 Conclusion Material Noise Mechanics Control Temperature Electrical noise (Johnson,…) Electromagnetic noise SEU Digitalisation Spurious noise, cross talk Elasticity, elastic limit, stress limit Damping Fatigue Ageing (Radiation, Curie-T, humidity) Dimensions, mass, stiffness Range Degrees of freedom Precision guidance Modal behaviour Non linearity Bandwidth, instabilities Control delay Parameter uncertainties Controller authority, collocation In the Eucard grant we demonstrated technical feasibility of the CLIC stability requirements In a laboratory environment one can expect to go an order better in the next decades, in an accelerator environment it is more complicated

21

22 Synergies between projects: Generic R&D J.P.DelahayeICHEP 2010 (28/07/10)

Integrated luminosity simulations 23 No stabilization68% luminosity loss Seismometer FB maximum gain (V1)13% Seismometer FB medium gain (V1mod) 6% (reduced 0.1 and 75 Hz) Seis. FB max. gain +FF (FBFFV1mod)7% Inertial ref. mass 1 Hz (V3mod)11% Inertial ref. mass 1 Hz + HP filter (V3)3% Courtesy J. Snuverink, J. Pfingstner et al. Commercial Seismometer Custom Inertial Reference mass K.Artoos, Stabilisation WG, 21th February 2013 Stef Janssens

Comparison sensors 24 SensorResolutionMain +Main - Actuator sensor0.15 nmNo separate assemblyResolution No direct measurement of magnet movement Capacitive gauge0.10 nmGauge radiation hardMounting tolerances Gain change w.  Orthogonal coupling Interferometer10 pmAccuracy at freq.> 10 HzCost Mounting tolerance Sensitive to air flow Orthogonal coupling Optical ruler0.5*-1 nmCost 1% orthogonal coupling Mounting tolerance Small temperature drift Possible absolute sensor Rad hardness sensor head not known Limited velocity displacements Seismometer (after integration)< pm at higher frequenciesFor cross calibration K.Artoos, Stabilisation WG, 21th February 2013