Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R.

Slides:



Advertisements
Similar presentations
© Wiley 2010 Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Advertisements

© Wiley 2007 Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 3 rd Edition © Wiley 2005 PowerPoint Presentation by.
Chapter 3 – Project Management
Chapter 16 – Project Management
WBS: Lowest level OBS: Lowest level
Chapter 17 Project Management McGraw-Hill/Irwin
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
CHAPTER 17 Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
MEM 612 Project Management Chapter 5 Scheduling the Project.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
MGMT 483 Week 8 Scheduling.
Project Management: A Managerial Approach 4/e
Chapter 9 Project Management.
1 Operations Management Lesson 5 Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Chapter 16 – Project Management
Operations and Supply Chain Management, 8th Edition
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Chapter 16 – Project Management
Information Technology Project Management
Lecture 4 Project Management Chapter 17.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management © Wiley 2007.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1-1 Information Technology Project Management by Jack T. Marchewka Power Point Slides by Richard Erickson, Northern Illinois University Copyright 2003.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
© Wiley 2010 Chapter 16 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 6 th Edition Chapter.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Project Management in Practice
MEM 612 Project Management Chapter 5 Scheduling the Project.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
A- 1. A- 2 Appendix B Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
K-1. K-2 Appendix K Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
2010© Wiley Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4 th Edition © Wiley PowerPoint Presentation by R.B.
Beni Asllani University of Tennessee at Chattanooga
Chapter 16 – Project Management
Project Management (專案管理)
Information Technology Project Management
Project Management: A Managerial Approach
Chapter 16 – Project Management
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Presentation transcript:

Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R

Reid & Sanders, Operations Management © Wiley 2002 Page 2 Learning Objectives Describe the project life cycle Describe the critical path method (CPM) Describe the program evaluation & review technique (PERT) Distinguish Activity-on-Arrow (AOA) & Activity-on- Node Diagrams Estimate the completion time of a project Identify critical activities that cannot be delayed without delaying the project Calculate the amount of available slack for non- critical activities

Reid & Sanders, Operations Management © Wiley 2002 Page 3 Definitions Project: –An endeavor with specific objectives & multiple activities with defined precedence relationships, to be completed within a limited duration Activities: –Specific tasks that must be completed & require resources Precedence relationships: –A natural order between activities, where some tasks must be complete before others can begin

Reid & Sanders, Operations Management © Wiley 2002 Page 4 Project Life Cycle Conception Feasibility analysis or study Planning Execution Termination

Reid & Sanders, Operations Management © Wiley 2002 Page 5 Network Planning Techniques Critical Path Method (CPM): –Developed to coordinate maintenance projects in the chemical industry –A complex undertaking, but individual tasks are routine (tasks’ duration = deterministic) Program Evaluation & Review Technique (PERT): –Developed to manage the Polaris missile project –Many tasks pushed the boundaries of science & engineering (tasks’ duration = probabilistic)

Reid & Sanders, Operations Management © Wiley 2002 Page 6 Both CPM & PERT Graphically display the precedence relationships & sequence of activities Estimate the project’s duration Identify critical activities that cannot be delayed without delaying the project Estimate the amount of slack associated with non-critical activities

Reid & Sanders, Operations Management © Wiley 2002 Page 7 Notation Activity-on-Arrow (AOA): –Each arrow represents an activity & its precedence relationship(s) –May require the use of “dummy” arrows if the activity has more than one successor task –Nodes used only as end-points for arrows Activity-on-Node (AON): –Uses nodes to represent the activity –Uses arrows to represent precedence relationships

Reid & Sanders, Operations Management © Wiley 2002 Page 8 AOA & AON Comparison

Reid & Sanders, Operations Management © Wiley 2002 Page 9 Example

Reid & Sanders, Operations Management © Wiley 2002 Page 10 AOA Diagram

Reid & Sanders, Operations Management © Wiley 2002 Page 11 AON Diagram

Reid & Sanders, Operations Management © Wiley 2002 Page 12 Add Activity Durations

Reid & Sanders, Operations Management © Wiley 2002 Page 13 Identify Unique Paths

Reid & Sanders, Operations Management © Wiley 2002 Page 14 Calculate Path Durations The longest path (ABDEGIJK) limits the project’s duration (project cannot finish in less time than its longest path) ABDEGIJK is the project’s critical path

Reid & Sanders, Operations Management © Wiley 2002 Page 15 Calculating the Slack of Non-Critical Activities All activities on the critical path have zero slack Slack defines how long non-critical activities can be delayed without delaying the project Slack = the activity’s late finish minus its early finish (or its late start minus its early start)

Reid & Sanders, Operations Management © Wiley 2002 Page 16 Calculate Activities’ Early Starts & Finishes

Reid & Sanders, Operations Management © Wiley 2002 Page 17 Calculate the Activities’ Late Starts & Finishes

Reid & Sanders, Operations Management © Wiley 2002 Page 18 Calculate Slack

Reid & Sanders, Operations Management © Wiley 2002 Page 19 Revisit Example Using Probabilistic Time Estimates

Reid & Sanders, Operations Management © Wiley 2002 Page 20 Use Beta Distribution to Estimate Expected Task Durations

Reid & Sanders, Operations Management © Wiley 2002 Page 21 Expected Task Durations

Reid & Sanders, Operations Management © Wiley 2002 Page 22 Build AOA Network & Identify Paths

Reid & Sanders, Operations Management © Wiley 2002 Page 23 Estimate Path Durations ABDEGIJK is the expected critical path & the project has an expected duration of weeks

Reid & Sanders, Operations Management © Wiley 2002 Page 24 The End Copyright © 2002 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United State Copyright Act without the express written permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies fo