MEM 612 Project Management Chapter 1 The World of Project Management.

Slides:



Advertisements
Similar presentations
Chapter Fourteen Setting Priorities for Businesses and Brands – The Exit, Milk, and Consolidate Options Copyright © 2007 John Wiley & Sons, Inc. All rights.
Advertisements

PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Systems Analysis and Design
Chapter 1 The World of Project Management
MANAGEMENT SCIENCE The Art of Modeling with Spreadsheets STEPHEN G. POWELL KENNETH R. BAKER Compatible with Analytic Solver Platform FOURTH EDITION CHAPTER.
Chapter 81 Creating a Production Process Chapter 8 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published by John.
The Manager, the Organization, and the Team
MEM 612 Project Management
Evaluating and Terminating the Project
Chapter 6 – Analyzing Information for Business Decision Making
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
Information Technology Project Management
Organizational Behavior, 9/E Schermerhorn, Hunt, and Osborn
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 2 – Strategic Management and Project Selection.
“Copyright © 2001 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
The World of Project Management
Defining Project Management Today Text by Stanley E. Portny, Samuel J Mantel, Jack R. Meredith, Scott M. Shaffer, Margaret M. Sutton with Brian Kramer.
Chapter 31 The Value of Implementing Quality Chapter 3 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published.
Portfolio Theory Chapter 7
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved.
Chapter 12 – Information Systems, First Edition John Wiley & Sons, Inc
Chapter 7 The Project Schedule and Budget Copyright 2012 John Wiley & Sons, Inc. 7-1.
1 Multinational Financial Management Alan Shapiro 10 th Edition John Wiley & Sons, Inc. PowerPoints by Joseph F. Greco, Ph.D. California State University,
Chapter 111 Information Technology For Management 6 th Edition Turban, Leidner, McLean, Wetherbe Lecture Slides by L. Beaubien, Providence College John.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
EUT443 – Engineering Management Chapter 1 The World of Project Management.
CURRENT LIABILITIES AND CONTINGENCIES
“Copyright © 2001 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
In Chapter 1 Projects are defined as temporary endeavors undertaken to create a unique product or service. Recent interest in project management is based.
Chapter 9 New Venture Valuate in Practice: The Investor’s Perspective Copyright¸ 2003 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation.
© 2007 John Wiley & Sons Chapter 15 - Organizational Issues PPT 15-1 Organizational Issues Chapter Fifteen Copyright © 2007 John Wiley & Sons, Inc. All.
INVESTMENTS: Analysis and Management Second Canadian Edition INVESTMENTS: Analysis and Management Second Canadian Edition W. Sean Cleary Charles P. Jones.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
INVESTMENTS: Analysis and Management Second Canadian Edition INVESTMENTS: Analysis and Management Second Canadian Edition W. Sean Cleary Charles P. Jones.
The Project Management Institute Introduction / Chapter 1.
Chapter 1 Charles P. Jones, Investments: Analysis and Management, 12 th Edition, John Wiley & Sons 1- 1.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.1-1.
1 LO 7 Compute earnings per share in a complex capital structure. Dirac Enterprises Example (Solution 1) Compute basic & diluted earnings per share for.
Chapter 14 Venture Capital Copyright¸ 2003 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation Alan Dennis, Barbara.
Project Management in Practice
THE ACCOUNTING INFORMATION SYSTEM Financial Accounting, Seventh Edition 3.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 10 Supplement Roberta.
Project Management in Practice Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
EUT443 – Engineering Management Chapter 1 The World of Project Management.
I- 1 Prepared by Coby Harmon University of California, Santa Barbara Westmont College.
A- 1. A- 2 Appendix B Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
K-1. K-2 Appendix K Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
Chapter 2 Appendix 2A Chapter 2 Appendix 2A Fair Value Measurements Prepared by: Dragan Stojanovic, CA Rotman School of Management, University of Toronto.
6 - 1 Chapter 6: Analysis Using Spreadsheets PowerPoint Slides Prepared By: Alan Olinsky Bryant University Management Science: The Art of Modeling with.
H-1 Prepared by Coby Harmon University of California, Santa Barbara Westmont College.
7-1 Chapter 7 Charles P. Jones, Investments: Analysis and Management, Tenth Edition, John Wiley & Sons Prepared by G.D. Koppenhaver, Iowa State University.
“Copyright © 2001 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Chapter 4 PowerPoint Spreadsheet Analysis.
Chapter 4 Using Financial Statements to Analyze Value Creation
The World of Project Management
Project Management in Practice
The World of Project Management
“Copyright © 2001 John Wiley & Sons, Inc. All rights reserved
1-1 Chapter 1 Charles P. Jones, Investments: Analysis and Management, Tenth Edition, John Wiley & Sons Prepared by G.D. Koppenhaver, Iowa State University.
Understanding Investments
Appendix Sample Innovation Plan
liquidation of a partnership.
Transportation and Transshipment Models
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Project Management in Practice Second Edition
MACROECONOMICS AND THE GLOBAL BUSINESS ENVIRONMENT
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Project Management: A Managerial Approach 4/e
Presentation transcript:

MEM 612 Project Management Chapter 1 The World of Project Management

MEM 612 Project Management WHAT IS A PROJECT?

MEM 612 Project Management Why the emphasis on project management? Many tasks do not fit neatly into business- as-usual. Need to assign responsibility and authority for achievement of organizational goals.

MEM 612 Project Management Characteristics of Projects Unique Specific Deliverable Specific Due Date

MEM 612 Project Management Other Common Characteristics of Projects Multidisciplinary Complex Conflict Part of Programs

MEM 612 Project Management PMI Definition “A temporary endeavor undertaken to create a unique product or service” Project Management Institute, 2000

MEM 612 Project Management PROJECT MANAGEMENT VS. GENERAL MANAGEMENT

MEM 612 Project Management Skill Requirements for Effective Project Management Conflict Resolution Creativity and Flexibility Ability to Adjust to Change Good Planning Negotiation –win-win versus win-lose

MEM 612 Project Management WHAT IS MANAGED? THE THREE GOALS OF A PROJECT

MEM 612 Project Management Figure 1-1: Performance, Cost, and Time Project Targets

MEM 612 Project Management THE LIFE CYCLES OF PROJECTS

MEM 612 Project Management Figure 1-2 The Project Life Cycle

MEM 612 Project Management Figure 1-3 An Alternate Project Life Cycle

MEM 612 Project Management SELECTING PROJECTS

MEM 612 Project Management Nonnumeric Selection Methods The Sacred Cow The Operating/Competitive Necessity Comparative Benefits

MEM 612 Project Management Figure 1-4 The Q-Sort Method

MEM 612 Project Management Numeric Selection Methods Financial Assessment Methods –payback period –discounted cash flow Scoring Methods –unweighted 0-1 factor method –weighted factor scoring method

MEM 612 Project Management Payback Period

MEM 612 Project Management Discounted Cash Flow where I 0 = the initial investment F t = the net cash flow in period t k = the required rate of return or hurdle rate

MEM 612 Project Management The Weighted Scoring Model where S i = the total score of the i th project s ij = the score of the i th project on the j th criterion w j = the weight or importance of the j th criterion

MEM 612 Project Management Confronting Uncertainty – The Management of Risk

MEM 612 Project Management What uncertainties are encountered in project management? Time required to complete a project Availability of key resources Cost of resources Timing of solutions to technological problems Actions taken by competitors

MEM 612 Project Management Can uncertainty surrounding projects ever be eliminated? No, but it can be managed

MEM 612 Project Management Risk Analysis Estimate probabilities or distributions associated with key parameters Develop analytic or simulation model Analyze distribution of outcomes generated by model

MEM 612 Project Management Risk Analysis with Crystal Ball Assumption Cells Distribution Gallery Forecast Cells

MEM 612 Project Management THE PROJECT PORTFOLIO PROCESS

MEM 612 Project Management The Project Portfolio Process Step 1: Establish a Project Council Step 2: Identify Project Categories and Criteria Step 3: Collect Project Data Step 4: Assess Resource Availability Step 5: Reduce the Project and Criteria Set Step 6: Prioritize the Projects within Categories Step 7: Select the Projects to be Funded and Held in Reserve Step 8: Implement the Process

MEM 612 Project Management The Aggregate Project Plan

MEM 612 Project Management Figure 1-12 An Example Aggregate Project Plan

MEM 612 Project Management Copyright Copyright  John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information herein.