For Draft List of Standard Errors 2008.11.17. Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
On Cavity Tilt + Gradient Change (Beam Dynamics) K. Kubo K. Kubo.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
Alignment and Beam Stability
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
@ Fermilab May 15-17, 2006, FNAL KIRTI RANJAN – DOE Review1 ILC Simulation for RDR Kirti Ranjan Fermilab.
ILC Feedback System Studies Nikolay Solyak Fermilab 1IWLC2010, Geneva, Oct.18-22, 2010 N.Solyak.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Alignment (Survey) Tolerances in Main Linac from Beam Dynamics Simulations Kiyoshi Kubo.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
Dynamic Tuning Selected Highlights Freddy Poirier (DESY) ILC accelerator physics group meeting 28 th January 2008.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Simulations (LET beam dynamics ) Group report Kiyoshi Kubo.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Placet based DFS simulations in the ILC Main Linac. Some preliminary results of error scans open for discussion Javier Resta Lopez JAI, Oxford University.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
BDS Alignment, Tuning, Feedback update and Integrated Simulation Plans Glen White.
1 DFS Studies on the Main Linac with Rnd-walk-like motion LET Beam Dynamics Workshop 12 th December 2007 Freddy Poirier.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Emittance preservation in the main linacs of ILC and CLIC Andrea Latina (CERN) Kiyoshi Kubo (KEK) LCWS University of Texas at Arlington - Oct
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
April Recent work on Low Emittance Transport, Main Linac Paul Lebrun CD/FNAL.
Emittance preservation in the RTML of ILC and CLIC Andrea Latina (CERN) Nikolay Solyak (FNAL) LCWS University of Texas at Arlington - Oct
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Main Linac Issues for RDR 1/20/2006 Area group H. Hayano From Linac Area discussion posted on the web:
Wakefield effect in ATF2 Kiyoshi Kubo
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
ILC Main Linac Beam Dynamics Review K. Kubo.
Integrated ATF2 Dynamic Tuning Simulations Glen White, LAL/SLAC ATF2 Software Workshop June 2008 Simulation overview. Tuning for 37nm IP vertical beam.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
From Beam Dynamics K. Kubo
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
ILC BDS Alignment, Tuning and Feedback Studies
Correlated Misalignments Studies for LCLS-II SC Linac
Orbit Control For Diamond Light Source
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ILC Z-pole Calibration Runs Main Linac performance
Summary of Beam Dynamics Working Group
DFS Simulations on ILC bunch compressor
ATF2 IP Tuning Task Simulation Updates
Accelerator Physics Technical System Group Review
Presentation transcript:

For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)

Items and persons to do Check BDS Quad-BPM mechanical alignemnt tolerance: K. Kubo  Done Calculate tolerance of magnet vibrations (pulse to pulse, random change): J. Lopez Check magnet strength stability requirement in ML (quad and corrector): K.Kubo  Done, from old study. May need to do for the new lattice. (?) Review transverse orbit jitter due to cavity tilt: D. Schulte Check fixed magnet strength error (now 1E-4 is used) in BDS: K. Kubo will ask G. White For BPM: (No assignment to items with “?”, will take time) –Give a template of BPM error parameters: D. Schulte –Study on scale error tolerance (now 2%, which is too tight ?): ? –Give numbers to both single bunch and multi-bunch.:? –Need beam offset wrt BPM after corrections. (required range) : ? –Tolerable number of failed BMP: ? Estimate required accuracy of beam energy in ML.: Daniel try to find a person. (May take time.) Survey Line Error will be discussed on Wedesday. Look if we forgot anything important.

ErrorCold SectionsRTML WarmBDS Warm Quad Offset300 μm150 μm200 μm Quad roll300 μrad RF Cavity Offset300 μm--- RF Cavity Pitch200 μrad--- BPM Offset (initial)300 μm200 μm30 μm* Max. 100 μm* Cryomoduloe Offset200 μm--- Cryomodule Pitch20 μrad--- Bend offset μm200 μm Bend Roll μrad “Standard” Local Alignment Error in RTML and ML (RMS, if not specified otherwise.) *Spec of Quad- BPM max. misalignment is 100 um in ATF2. So RMS 30 um and max. 100 um looks fine. (?)

Cold SectionsRTML WarmBDS Warm Quad, Sext.100 nm30 nm ? Mechanical fast movement (vibration) Tolerance will be determined by orbit change at IP. Also should be looked: RTML: emittance dilution in the turn-around (note that it is before the feed-forward) ML: Orbit change at linac end (assuming post linac orbit feedback or not ?) BDS: ??? Need to calculate again. Javier will.

Cold SectionsRTML WarmBDS Warm Quad3E-51E-5 Bend Strength---1E-5 Corrector3E-51E-3 Sext.--- 1E-5 Oct.--- 1E-5 “Standard” Magnet Strength Stability Requirement Magnet to magnet independent, random Tolerance will be determined by orbit change at IP. Also should be looked: RTML: emittance dilution in the turn-around (note that it is before the feed-forward) ML: Orbit change at linac end (assuming post linac orbit feedback or not ?). From RDR, jitter < 0.5 sigma. Numbers fir the cold section should be checked: Kiyoshi will check. Old study is found, ILC-Asia Note, ILC-Aisa : 6E-5  0.5 sigma_y jitter I (K.K.) divided by 2, since there are other jitter sources.

AmplitudePhase BC Correlated0.5%0.24 deg. Uncorrelated1.6%0.48 deg. ML Correlated0.07%0.35 deg Uncorrelated1.05%5.6 deg Crab e+e- Relative0.015 deg “Standard” RF dynamic errors Correlated :same for all klystrons Uncorrelated : klystron to klystron independent, random What determines the tolerance? BC: Timing at IP ML: Energy jitter at the end. Crab: Horizontal offset at IP from RDR Transverse orbit jitter due to cavity tilt should reviewed. Daniel will.

Cold SectionsRTML WarmBDS Quad0.25% 1 E-4 Bend Strength %1E-4 Corrector??? Sext.--- 1E-4 Oct.--- 1E-4 “Standard” Magnet Strength fixed Error It is not clear what determines these tolerances. 1E-4 is too small? Need to revised. Ask Glen.

Cold SectionsRTML WarmBDS BPM Resolution depend on dynamic error 1 μm +?*range 1 μm +?*range 0.1 μm +?*range BPM Scale error2%2% ? Beam size monitor resolution1 μm (working assumption for now) Luminosity monitor (single pulse) ---1% “Standard” error of beam monitors For BPM, Daniel will give a template (from CLIC) 2% scale error is too tight (Manfred) Give numbers to both single bunch and multibunch. Need beam offset wrt BPM after corrections. Tolerable number of failed BMP?

Beam energy error in Main Linac What determines the energy error? A)Calculate energy from cavity voltages?  RF cavity voltage error B)Measure energy using dipole correctors and BPM?  Strength error of corrector magnet and BPM scale error What is affected by the energy error? Response to correctors can be calibrated. –Ratio, corrector strength / beam energy is relevant ? Required accuracy should be estimated. Daniel will try to find a person to do.

ErrorStep length = L1Step length = L2 Random angle / step Random offset / step Systematic angle (common for all steps) Systematic offset (common for all steps) Initial angle Offset of Primary References “Standard” Survey Line Error Will be discussed on Wednesday. May be too early to fill numbers now ???

Anything else to be listed? Following slides show comments and references.

What is “standard” errors and for what? Standard error should be: Tolerable, from beam dynamics Reasonable, from engineering Let us (beam dynamics group) make draft list first. –Tolerance, if we estimated. –Assumed (commonly used) errors in simulations. –Assign a people to each of to do item. “Publish” the list and ask feasibility and make it official.

Quad, Sext, Oct x/y transverse alignment200 um Quad, Sext, Oct x/y roll alignment300 urad Initial BPM-magnet field center alignment30 um dB/B for Quad, Sext, Octs1e-4 Mover resolution (x & y)50 nm BPM resolutions (Quads)1 um BPM resolutions (Sexts, Octs)100 nm Power supply resolution14 - bit FCMS (Final CryoModule System): Assembly alignment200 um / 300urad FCMS: Relative internal magnet alignment10um / 100 urad FCMS: BPM-magnet initial alignment (i.e. BPM-FCMS Sext field centers) 30 um FCMS: Oct – Sext co-wound field center relative offsets and rotations 10um / 100urad Corrector magnet field stability (x & y)0.1 % Luminosity (pairs measurement or x/y IP sigma measurements) 1% Reference for BDS Error set in BDS simulatio, By Glen White, LET WS at SLAC, 2007

Nominal Misalignment tolerances ToleranceVertical (y) plane BPM Offset w.r.t. Cryomodule300 μm Quad offset w.r.t. Cryomodule300 μm Quad Rotation w.r.t. Cryomodule 300 μrad Cavity Offset w.r.t. Cryomodule300 μm Cryostat Offset w.r.t. Survey Line200 μm Cavity Pitch w.r.t. Cryomodule 300 μrad Cryostat Pitch w.r.t. Survey Line20 μrad BPM Resolution1.0 μm Reference for Main Linac: e.g. by R.Ranjan, report in GDE meeting Vancouver, 2006

Reference for RTML by J. Smith, report in LET Workshop at SLAC, 2007

Refence for RF error: RDR

Reference for BDS: RDR