August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
1 Market Trials Open Market Participant Call Weekly Kick Off Sept 27, 2010.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RATF Report to WMS Report of RATF meeting held March 3, 2014.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Responsive Reserve Service Deliverability Review September 15,
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Multi-Interval Real-Time Market (MIRTM) Update to SAWG – WebEx ERCOT Staff Market Design & Analysis September 21, 2016.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Principal Load Profiling and Modeling
RTDF Overview of Data Analysis & Status of “Consesus Items”
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Presentation transcript:

August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations

2 Outline of Presentation July 13 & July 18 : Results of SCED Re-Run: LSL=0, LDL recalculated for different “floor” scenarios August 8, 2011: Non-Spin Deployment Summary of August 8 Non-Spin Deployment Discussion of Adjusting Non-Spin Deployment and Recall Discussion of Adjusting RUC Approach August 17, 2011Reliability Deployments Task Force Meeting

3 July 13 & July 18 : Results of SCED Re-Run: LSL=0, LDL recalculated for different “floor” scenarios August 17, 2011 July 13: FIP=4.41July 18: FIP=4.445 System Before Non- Spin Deployment System - After Non-Spin Deployment System Before Non- Spin Deployment System - After Non-Spin Deployment Sum(HDL)-GTBD =459 MW (New) = -7 MW (Original) Sum(HDL)-GTBD =505 MW (New) =505 MW (Original) Sum(HDL)-GTBD =335 MW (New) =280 MW (Original) Sum(HDL)-GTBD =1149 MW (New) =1149 MW(Original) Original LSL OFFNS LSL=0 LDL recalc Original LSL OFFNS LSL=0, LDL recalc Original – No change $ $76.79$76.80$267.75$63.35$64.61 Original – Only online HASL/HDL changed, NO floor $92.88$76.79$76.80$62.54$63.35$64.61 Low Floor$81.28$83.61$186.15$85.08$80.92$93.52 Med Floor-1 $500 $475.57$80.92$ Med Floor-2 $1000 $968.96$80.92$ High Floor $3000 $ $80.93$ Reliability Deployments Task Force Meeting

4 August 8, 2011: Non-Spin Deployment August 17, 2011 All Non-Spin deployed at 14:56 in the amount of MW Continued All Non-Spin deployment at 17:02 in the amount of MW All Non-Spin recalled at of the total MW of Non-Spin Responsibility, 1103 MW Non-Spin ALREADY available to SCED from Online QSGR. Between 14:52 and 15:56 - PRC went below Between 17:00 and 18:00 PRC went below Between 14:25 and 17:30 the Avail_CAP_30MIN went below 1000 MW (negative for some 5 minute intervals) and  HDL-GTBD went below 200 after 16:10 (29.11 Load Forecast for HE 15 = MW Load Forecast for HE 16 = MW Load Forecast for HE 17 = MW Load Forecast for HE 18 = MW Reliability Deployments Task Force Meeting

5 August 8, 2011: Non-Spin Deployment August 17, 2011 Telem Non-Spin Telem Non-Spin Telem System_Lambda=$60.13 Load increase from 14:55 to 15:25 = MW LSL injection from OFFNS resources from 14:55 to 15:25 = 0 (“OFFNS” QSGR) (“OFFNS” Non-QSGR) = 101 MW Reliability Deployments Task Force Meeting

6 August 8, 2011: Non-Spin Deployment (continued) August 17, Responsibility “ON” Non-QSGR “OFFNS” Non-QSGR101131, HSL=277 “ON” QSGR (TelemMW=294.92, HSL=1104.8) “OFFNS” QSGR00 “OFF” Non-QSGR that came online by 15: (80 MW were ONRUC) “OFF” QSGR that came online by 15:25 00 Note 1: All are telemetry values at 14:55 (before Non-Spin Deployment) Note 2: The total HSL from “OFF” Generation Resources that came online = 206 MW Reliability Deployments Task Force Meeting

7 August 8, 2011: Non-Spin Deployment (continued) August 17, 2011Reliability Deployments Task Force Meeting

8 August 8, 2011: Non-Spin Deployment (continued) August 17, 2011 OFFNS Non-QSGR resources carrying Non-Spin: Aggregated EOC from LSL to HSL Reliability Deployments Task Force Meeting

9 August 8, 2011: Non-Spin Deployment (continued) August 17, 2011 Online Non-QSGR resources carrying Non-Spin: Aggregated EOC from HASL to HASL+Non-Spin Reliability Deployments Task Force Meeting

10 Summary of August 8 Non-Spin Deployment August 17, 2011 Price is $ just before Non-Spin Deployment Note all QSGR are online. Price reduction 30 minutes after Non-Spin deployed is due to additional EOC available to SCED at low price. Reliability Deployments Task Force Meeting

11 August 8: Results of SCED Re-Run for different “floor” scenarios August 17, 2011 August 8: FIP=$3.965/MMBtu System Before Non-Spin Deployment System - After Non-Spin Deployment Sum(HDL)-GTBD =843 MW (New) = MW (Original) Sum(HDL)-GTBD = MW (New) = MW (Original) Original LSLOFFNS LSL=0 LDL recalc Original – No change$725.83$60.13$60.14 Original – Only online HASL/HDL changed, NO floor $136.40$60.13$60.43 Low Floor$136.27$72.09 Med Floor-1 $500 $113.24$ Med Floor-2 $1000 $113.24$ High Floor $3000 $113.24$ Reliability Deployments Task Force Meeting

12 Current Non-Spin Deployment based on “HDL-GTBD” 1)If  HDL – GTBD >>> deploy HALF of Non-Spin. (Partial deployment of Non-Spin) 2)If  HDL – GTBD >>> deploy ALL Non-Spin. (Full deployment of Non-Spin) Avail_Cap30Min =  HASL – GTBD – 30MinLoadRamp 30MinLoadRamp=( NextHourLoadForecast – CurrentHourLoadForecast)/2 August 17, 2011Reliability Deployments Task Force Meeting

13 Illustrative Example of Revision to Deployment Based on “HDL-GTBD” (Section 3.4 of RT Desk Operating Procedure ) 1)If  HDL – GTBD <= 400 AND Avail_Cap30Min < 1000 MW; Then deploy all of On-Line Non-Spin [Starts earlier with On-Line only] 2)If  HDL – GTBD <= 200 AND Avail_Cap30Min < 1000 MW; Then deploy HALF of Off-Line Non-Spin. (Partial deployment of Off-Line Non- Spin) 3)If  HDL – GTBD <= 200 AND Avail_Cap30Min < 500 MW; Then deploy ALL Non-Spin. (Full deployment of Non-Spin) Avail_Cap30Min =  HASL – GTBD – 30MinLoadRamp 30MinLoadRamp=( NextHourLoadForecast – CurrentHourLoadForecast)/2 August 17, 2011Reliability Deployments Task Force Meeting

14 Additionally Current Non-Spin Deployment based on “PRC” 1)If Physical Responsive Capability (PRC) < 2500 MW – deploy enough to recover PRC to 2500 (Partial deployment of Non-Spin) 2)If Physical Responsive Capability (PRC) < 2300 MW – deploy ALL Non- Spin. (Full deployment of Non-Spin) Physical Responsive Capability =  Min (Max ((HSL – TelemMW), 0.0), 0.2*HSL) for online units + RRS from Load Resources August 17, 2011Reliability Deployments Task Force Meeting

15 Illustrative Example on Revision to Deployment Based on “PRC” (Section 5.2 of RT Desk Operating Procedure) 1)If Physical Responsive Capability (PRC) < 2700 MW; Then deploy all On-Line Non-Spin (Partial deployment of Non-Spin) 1)If Physical Responsive Capability (PRC) < 2500 MW; Then deploy enough Off-Line Non-Spin to recover PRC to 2500 (Partial deployment of Non-Spin) 3)If Physical Responsive Capability (PRC) < 2300 MW; Then deploy ALL Non-Spin. (Full deployment of Non-Spin) Physical Responsive Capability =  Min (Max ((HSL – TelemMW), 0.0), 0.2*HSL) for online units + RRS from Load Resources August 17, 2011Reliability Deployments Task Force Meeting

16 Current Recall Procedure (No suggested changes at this time) If (HDL-GEN) ≥ 500 MW, Avail_CAP_30Min ≥ 1000, AND PRC is ≥ 3000 MW; Then recall half of Non-Spin. If (HDL-GEN) ≥ 1000 MW, Avail_CAP_30Min ≥ 1000, AND PRC is ≥ 3000 MW Then recall all Non-Spin. August 17, 2011Reliability Deployments Task Force Meeting

17 Possible Revisions to Non-Spin Deployment and Recall Procedure August 17, 2011 Several possible revisions to the Non-Spin deployment and recall procedures have been discussed. For some revisions, in addition to procedure changes that need to be approved by TAC, there would need to be changes to the ERCOT systems in order to have deployments and recalls that discriminate between On-Line Non-Spin and Off-Line Non-Spin Resources. At least several months would be needed to implement the needed display changes and software changes. Reliability Deployments Task Force Meeting

18 Adjustments to the RUC Process August 17, 2011 RUC is used to ensure ERCOT System reliability and to ensure that enough Resources Capacity, in addition to Ancillary Service capacity, is committed in the right locations to reliably serve the forecasted Load on the ERCOT system. Bias already subtracted from the Load Forecast. (Average 1259 MW across peak hours in August) Any adjustment would need to be studied and take into consideration the way the Quick Starts are represented in COP. Protocol changes are likely required. Reliability Deployments Task Force Meeting

19 Last Slide August 17, 2011Reliability Deployments Task Force Meeting QUESTIONS