Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Engineering 221
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
ISTISNA’.
Contract CloseOut.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Setting Up The Project Project Manager Academy Section Five JOB LOOP 5.0Post Project Review 4.0Project Management 3.0Project Pricing 2.0Project Estimating.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Marcy Mealy Procurement Specialist CDBG Program
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Project Close Out CTC-470.
Estimating CTC-415. Estimate Types Concept Detailed Definitive.
Conditions of the Contract for Construction
Subcontracting. Subcontractors % of work is subbed –Significant impact on costs and schedule –Want to develop a working relationship with good.
EM15 – Contractors COST MANAGEMENT
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
Construction Contracts and Project Delivery Methods
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Mock State Aid Project County Highway Accountant’s Conference 2015.
INTD 55 business practices charging for your services.
Measurement and Payment
TYPES OF CONTRACTS.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Chapter 15 Payments. Payments typically made monthly. Retainage typically withheld (5% - 10%) Project payment: –series of periodic payments –single final.
Financial Management Back to Table of Contents. Financial Management 2 Chapter 21 Financial Management Analyzing Your Finances Managing Your Finances.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Estimating CE-147 Week 2. Estimate Types Concept Detailed Definitive.
Measurement and Payment Module #5 Prepared by Dr. Randy R. Rapp July 2005.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Financial Management Ch 4.  Every change to the athletic program may/can effect your budget ( new programs, year round care)  Include all staff input.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Financial Management Glencoe Entrepreneurship: Building a Business Analyzing Your Finances Managing Your Finances 21.1 Section 21.2 Section 21.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
COST PLUS. Reasons for Cost-Plus Can’t agree on a price Specialty work Notice of Changed Conditions.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
County Highway Accountant’s Conference 2015
CHAPTER FOURTEEN THE VOUCHER SYSTEM.
Costs and Economics of Construction
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
Completing the State Aid Payment Request
ARCH 435 PROJECT MANAGEMENT
C2 Follow the Capital Risks
Directed Change Constructive Change
Presentation transcript:

Measurement and Payment

Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed (quantities) –RPR reviews Approves (sends to owner) or disapproves (calls contractor) –Contractor gets paid

Approval of Payment Requests –RPR responsible for checking quantities and costs Quantity take off Inventory of equipment and materials on site but not used Field measure work completed or claimed Construction Cost Estimate of all completed work Audit of Invoices and costs Review of claims for extra work and completed change orders Check of retention amount Check method used for profit and overhead, material costs for estra work or change orders

Basis for Payment Amounts –Accuracy of field measurements determined by contract type –Lump sum contracts do not need accurate field measurements –Cost plus or Unit price contracts need very accurate field measurements Pg 432

Schedule of Values v. Cost loaded CPM Schedule Unit Price Contracts –Do not call for Cost Loaded CPM Schedule Conflicts with line items on unit price sheet –Do not call for schedule of Values –A breakdown of all line items is submitted w/ contractor’s bid and is binding throughout job

Lump Sum Contracts with Cost Loaded CPM –Do not ask for Schedule of Values – cost loaded CPM is equal –Request Cost loaded CPM be submitted before first pay period ends Lump Sum Contracts w/o Cost loaded CPM –Do not ask for a cost loaded CPM schedule –Do not ask for a bid breakdown –Request a schedule of values before starting work on project

Evaluation of Contractor’s Payment Requests Contractor submits request for payment at a prearranged date each month for previous month’s work –Lump sum contract – payment based on a fair estimate of work completed plus overhead and profit –Unit Price Contracts – contractor gets paid based on quantity used – RPR must have accurate field measurements +/- 25 % is okay more or less allows for renegotiations by either party

Equipment And Materials delivered but not used –Contractor brings stuff on site early May try to bill owner since stuff is on site Contractor only paid when stuff is used Includes materials used but not completed – pipe not paid for until covered and tested Unit price contracts are usually for installed in place materials – on site is not in place Can make exceptions for long lead items which arrive on site early

Force Account –Daywork or for any type of cost plus payment –In US associated with extra work and change orders –May be used to pay contractor when it is difficult to provide adequate measurements or estimate cost of certain items of work –Should be last choice when setting up items for payment

Force Account –Change order is a must –Force account payments not authorized for supers. Allowances for supers is in contractors O&P. Foremen working full time on item would be covered by account –PM has authority to direct every aspect of force account work

PM and Contractor must agree on Labor –Classification and approximate N of workers, wage rates, travel allowance, subsistence, are foremen included Equipment –Types to be used including size, rating, capacity, which indicate that item can do work required, owned or leased, cost per hour for use Materials –Cost and freight charges, purchased for project or from contractor’s stock

PM prepares lists of equipment and labor classifications actually used and corresponding rates –Equipment list includes complete nomenclature of the equipment to establish rental rate from a Rental Rate Book –Labor list includes labor classification and composite hourly rate (basic wage + added costs listed in DOT standard specs)

Payments for Extra Work and Change Orders –Usually laid out in Contract –Common is cost plus with a reasonable allowance for O&P –State agencies may allow 15, 20, 24,33 % on labor and then 15% on equipment, 15% on materials 5% on primary subs (not subs subs)

–RPR must evaluate all change orders and requests for payment of extra work –RPR should consult PM or owner to determine the exact terms of the agreement that cover extra work –RPR keeps daily record of extra work performed and materials used

Mobilization Costs –Initial expenditures contractor makes before any work towards progress payment –Permits, insurance, bonds –Equipment –Tools and supplies to do work –Field Office Make it a fixed cost that is on every bid –Contractor cannot inflate

Make sure that all items allowed in the mobilization cost are listed –Can then either –Prorate mobilization based on % complete –Or Lump sum when all complete Other items to include –RPR Field Office & Utilities & Communications –Pg 448

Mobilization Lump Sum Projects –Mobilization terms must be in a separate technical section –Lump sum for mobilization Unit Price Projects –Part of Measurement and Payment section with a separate line item and an A/E determined cost

Partial Payment to Contractor Waiver of Lien Procedure –After each progress payment GC, subs, suppliers all sign waivers of liens for that payment –Owner knows subs and suppliers are paid –Limits the amount of the lien to only what has not been paid

Total Cost Pricing of Change Orders –Compares total cost to do work with bid cost to do work, owner pays difference –Allowed when Nature of claim makes it v. difficult to establish an accurate price Contractor’s bid was realistic Contractor’s costs were realistic Contractor’s actual costs were realistic Contractor was not responsible for any of the increased cost

Forward pricing of Change orders GC and Owner establish a mutually agreed lump sum payment for work Contractor cannot be forced to forward price work Contractor needs to make sure price is right – they are stuck with it

Retainage –5 – 10% of contract price –Gives owner $ to satisfy lien claims if GC does not pay –Also is the profit –Can do either a lump sum or it can be computed based on each months progress payments

–Retainage given to GC 35 days after completion of work if –all lien releases turned in –All employees paid –Approval of the performance insurance CO. –GC gets all but the amount representing the value of uncompleted or substandard work or materials.

Liquidated Damages during construction –Can have liquidated damages for missed milestones Throws other contractors behind Deduct from next progress payment

Interpreting the Contractor’s Bid Bidding Errors –Mathematical errors (unit price x quantity) Adding up bid items –Ask for values in words and numbers Words rule –GC may or may not get released from bid

Unbalanced Bids –Contractor raises prices on some items and lowers prices on others w/o changing total project cost –Should be rejected if found

Why do unbalanced bids –To discourage certain types of construction and encourage others that the Contractor is good at –Contractor thinks A/E estimate is low can make unit price high and make extra profit –Increase unit prices on first items of work to be completed => receive excessive early payments then default on the job Leaves Surety with too little $ to do job

Can build up working capital – eliminates squeeze due to 10% retention Detecting an Unbalanced Bid –Usually an unbalanced bid indicates and A/E error in estimate –Use a spreadsheet to compare bids to find wide swings in bid prices All contractor’s should be in the same price range if normal bid

Resolving an Unbalanced Bid –Easiest way is to reject all bids (owner’s perogative) –Take bids to A/E point out area where possible error exists in estimate –Get a new estimate –Rebid job