Accelerator Science at Daresbury - the early years A close-up and personal view by Vic Suller (Louisiana State University/CAMD)

Slides:



Advertisements
Similar presentations
J. Feikes; Status of MLS European Synchrotron Light Source XVI. Commissioning of the Metrology Light Source in Berlin Adlershof J. Feikes for the BESSY&PTB-Commissioning.
Advertisements

Vic Suller A S T e C What is it? A New Structure within CLRC Formed April 2001 Critical Mass of Accelerator specialists Why? To provide strategic accelerator.
1 Diamond RAL Particle Physics Masterclass 12 March 2003 Glenn Patrick
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
ESLS 04 Daresbury Laboratory
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
ISIS Accelerator Division
Eric Prebys USPAS, Hampton, VA  Wikipedia lists about 60 light sources worldwide USPAS, Hampton, VA 2015Special Topic - Light Sources 2.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
A View from NSF The Early Years of CESR David Berley University of Maryland May 31, 2008 Two Aspects of Cornell’s Success in the International Arena of.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
AS Diagnostic Collaboration Mark Boland
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Particle Accelerators
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
Diamond and the UK new light source Chris Christou, X-band workshop, Cockcroft Institute, 1 st December 2008.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Synchrotron Radiation Sources Past, Present and Future
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
M W PooleASTeC Ten Years On Origins of ASTeC Mike Poole Former ASTeC Director.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Recent Developments at Diamond Ian Martin On behalf of the Diamond Team Particle Accelerators and Beams Group Meeting Daresbury Laboratory 10 th April.
Fourth-Generation Sources at Third-Generation Facilities John W. Lewellen Advanced Photon Source Argonne National Laboratory.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
HYBRID WARM-COLD SYNCHROTRON FOR THE MUON COLLIDER Al Garren July 28, 2011.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
EMMA, BASROC, Hadron Therapy and ADSRs Roger Barlow STFC Cockcroft Review Feb 11 th 2009.
CEPC Booster Zhang Chuang, Cui Xiaohao September 11,2015.
Hybrid Synchrotron Arc: 2 Dipoles per Half Cell J. Scott Berg Advanced Accelerator Group Meeting 28 July 2011.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ARW 2013 Opening Melbourne, Australia, 15 April 2013 Dr Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
Cockcroft Education Lectures M W Poole Introduction to Accelerators Part 1 M W Poole Past Director and Honorary Scientist ASTeC.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
Alignment of Insertion Device at Siam Photon Source
B u d k e r I N P VEPP-4M tunnel view BINP accelerator facilities J/  and  physics  - lepton precise mass measurement  - physics 5 GeV collider.
Dr Mark Boland Principal Scientist Accelerator Physics AXXS Australian X-band XFEL Source at the Australian Synchrotron On behalf of the Accelerator Science.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Introduction to Accelerators Part 1
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Career Highlights and (a few) Disappointments
Design study of CEPC Alternating Magnetic Field Booster
Automatic emittance measurement in the CERN 1.4 GeV Booster
Coupling Correction at the Australian Synchrotron
CEPC Booster Design Progress (Low field)
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
A Superconducting Proton/Electron Linac
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Electron Rings Eduard Pozdeyev.
Update on MEIC Activities at ANL
MEIC Alternative Design Part V
3.2 km FODO lattice for 10 Hz operation (DMC4)
MOPRB098 An Increased Extraction Energy Booster Complex For The Jefferson Lab Electron Ion Collider* Thomas Jefferson National Accelerator Facility Newport.
Presentation transcript:

Accelerator Science at Daresbury - the early years A close-up and personal view by Vic Suller (Louisiana State University/CAMD)

In the beginning - there was NINA Synchrotron 5 Gev Circumference 220 m FoDO lattice Straights 1m & 3.5m Combined function Tune values 5.25, 5.25 Rep rate 50 Hz Beam power 1 kW

Accelerator Physicists at Daresbury 1966 Applied Physics Division Michael Crowley Milling Godfrey Saxon Neil Marks Ian Rabinowitz Vince Hatton Robin Tait Machine Division Tony Egginton Jerry Thompson Tom Aitken Mike Poole (Sept 1966) Vic Suller (Oct 1966) Alan Jackson (Oct 1968)

Machine Division responsibilities - external beams

1968 Tom Aitken & Vic Suller – In the NINA control room They are setting up the Spill Servo – to extend the duration of the beam spill

1968 First Synchrotron Light experiment - Ian Munro + Scott Hamilton (Manchester University) Scott Hamilton and Tom Aitken inside the NINA tunnel alongside the SR beam line

1968 First Synchrotron Light experiment - Notice the pile of lead bricks enclosing the experiment - very inconvenient!

1972 Two Beams into the Dedicated Synchrotron Light Facility Mike and John West in the SRF

Mike and Alan Jackson - shared an office for 15 years Alan's big NINA project was the diamond target. Mike's desk looks remarkably tidy - the paper mountain was yet to come!

1968 Design Study for the NINA Booster To provide a future for the lab, a 20 GeV synchrotron was proposed, tunneling under the Daresbury hillside. The design study was made by the Applied Physics division. In 1969 the Government announced that in future all UK high energy physics would be done at CERN. But the NSF van de Graff was approved. The Machine division became responsible for all NINA accelerator physics.

Controlling the NINA tune - programmed quadrupoles

Mike & Neil Marks at the NINA control desk Richard Walker can also be seen assisting – which puts this photo at 1977.

SRS replaced NINA The SRS was approved in 1975, although NINA kept running until 1977

1975 Computer Controlled Magnet Measurements Mike & Richard Walker develop a computer controlled Magnet Measurement system to automatically take and record precision field maps of the SRS magnets.

Computer Controlled Magnet Measuring Facility Celebrating the last SRS magnet to be measured circa 1979.

The SRS after HBL conversion

1980 Mike at the original SRS control desk

2004 Mike at the later SRS control desk

1985 Mike and the Undulator

1985 The SRS Undulator

Undulator Spectrum in the Visible For diagnostic purposes the undulator spectrum was shifted from the normal VUV into the visible. This was done by ramping the SRS energy down from injection (600 MeV) to 450 MeV.

HELIOS Compact Source Ring energy 0.6 Gev Bending field 3.5 T Bend radius 0.57 m Beam current 300 mA

HELIOS linac - now in Louisiana The HELIOS linac has been acquired by CAMD and will be installed with the existing linac to raise the injection energy from 200 to 300 MeV.

Mike - the Sportsman Mike's Sports:- Cricket Soccer (Everton) Table Tennis Golf Bowls (?) With George Wright and the Bowling Trophy

This was taken in the DL huts in the early 70s. Mike – Table Tennis action

Mike in the Daresbury Lab Cricket Team 1970 AEA knock out winners

Mike - my close colleague for 37 years

Mike Congratulations for your many contributions to accelerator science in the UK Best Wishes for a long and active Retirement