OSC Meeting April 27, 2006 1 Transmission Cost Allocation Overview.

Slides:



Advertisements
Similar presentations
10/22/20101 Westar Formula Rate and your bill. 10/22/20102 What we will be going over Transferring the results from the Westar Formula Rate to the SPP.
Advertisements

FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
The Midwest ISO from a Transmission Owner Perspective.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Distributed Generation (DG)
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
Queue Reform at the Midwest ISO NARUC February, 2008.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
SPP.org 11. SPP Delivery Point Addition (DPA) Process Effective May 1, 2010.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Topics to Cover Interconnection Process Overview
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Charles Hosken, General Manager Imperial Irrigation District
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Entergy Arkansas, Inc. Transition Plan Technical Conference #2 July 15, 2010.
Bulk Power Transmission System
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
ESI/SPP Seams Agreement Implementation Update Transmission Planning Summit August 11, 2010.
1.
Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
FERC Order 1000 Transmission Planning and Cost Allocation Key Points of Seminole Electric Cooperative, Inc.’s Proposal FRCC Regional Stakeholder Meeting.
Generator Interconnection Studies & Agreements Charles Hendrix.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
1 A Conversation about MISO Paul Spicer November 8, 2007.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
Open Access Transmission Tariff Amendment No. 9 Greg Broeking, Chief Financial Officer March 7, 2012.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Regional Transmission Organizations
Pseudo-tie business procedure
T.O. Highway/Byway Recommendations
Westar Formula Rate and your bill
Mountain West Transmission Group Panel Discussion
Supplemental Project Planning Process Under Order 890 Within PJM
Pseudo-tie business procedure
Offshore Wind Transmission:
Presentation transcript:

OSC Meeting April 27, Transmission Cost Allocation Overview

OSC Meeting April 27, Cost Allocation Summary Rolled-in to Region- wide Rate Rolled-in to “Zonal” Rate Participant Funded Other CAISOXXXX ISO NEXXX PJMXX SPPXXX EntergyXXX OTHERSXXXX

OSC Meeting April 27, CAISO Cost Allocation Rolled-in to Region-wide Rate –New High Voltage Facilities 200KV or greater –Capital Additions to existing High Voltage Facilities –Can be either reliability or economic upgrades –Included in CAISO Tariff High Voltage Access Charge

OSC Meeting April 27, CAISO Cost Allocation Rolled-in to Zonal Rate –New Low Voltage Facilities Below 200KV –Capital Additions to existing Low Voltage Facilities –Can be either reliability or economic upgrades –Included in Utility specific Tariff as a Low Voltage Access Charge

OSC Meeting April 27, CAISO Cost Allocation Participant Funded –Independent Transmission Project Proposal –Not determined as part of CAISO Planning Process –Project Sponsor Market Participant or Group of Market Participants Participating Transmission Owner –Project Sponsor pays full cost of upgrade

OSC Meeting April 27, CAISO Cost Allocation Generation Interconnection Upgrades –Reliability Network Upgrades Transmission facilities beyond the point of interconnection required to safely and reliably connect generator to the grid –Delivery Network Upgrades Transmission facilities other than reliability upgrades required to relieve operational constraints on the grid Economic upgrades are not required but may impact economic delivery of the generator

OSC Meeting April 27, CAISO Cost Allocation Generation Interconnection Upgrades –Funded by the Interconnection Customer or Transmission Owner has option to fund –Interconnection Customer entitled to repayment ($ for $) over 5 year period from Commercial Operation Date or make other reimbursement arrangements –Interconnection Customer can receive Firm Transmission Rights in lieu of cash

OSC Meeting April 27, ISO NE Cost Allocation Rolled-in to Region-wide Rate –Regional Benefit Upgrades 115 KV and above Meet all non-voltage level criteria for Pool Transmission facility classification Included in Regional System Plan as either a Reliability Transmission Upgrade or a Market Efficiency Upgrade

OSC Meeting April 27, ISO NE Cost Allocation Rolled-in to Region-wide Rate –Reliability Transmission Upgrade Not required by a generation interconnection Needed for continued reliability –Market Efficiency Upgrade Not required by a generation interconnection Designed to reduce the bulk power system costs to load system-wide

OSC Meeting April 27, ISO NE Cost Allocation Rolled-in to Zonal Rate –Local Benefit Upgrades Below 115 KV Do not meet all non-voltage level criteria for Pool Transmission facility classification –Costs included in the local (zonal) service rates under the Tariff

OSC Meeting April 27, ISO NE Cost Allocation Participant Funded –Localized Costs above the minimum requirements deemed necessary by the ISO NE for a Regional Benefit Upgrade –Elective Transmission Upgrades Merchant Transmission will have its own OATT to recover costs –Generation Interconnection Upgrades Direct Assignment Facilities Interconnection related Network Upgrades

OSC Meeting April 27, ISO NE Cost Allocation Participant Funded –Elective Transmission Upgrades and Generation Interconnection Upgrades Eligible to receive Qualified Upgrade Awards Revenues associated to additional Financial Transmission Rights made possible by the Upgrades

OSC Meeting April 27, PJM Cost Allocation Rolled-in to Zonal Rate –Required Transmission Enhancements Based on Regional Transmission Planning Protocol - Schedule 6 of the PJM Operating Agreement Based on Coordinated System Plan pursuant to the PJM-MISO Joint operating Agreement Addresses both Reliability and Economic Upgrades

OSC Meeting April 27, PJM Cost Allocation Rolled-in to Zonal Rate –Reliability Upgrades - facilities required to maintain system within reliability criteria –Economic Upgrades - facilities required to alleviate transmission congestion which can not be appropriately hedged

OSC Meeting April 27, PJM Cost Allocation Rolled-in to Zonal Rate –Construction, Ownership and Cost responsibility of Upgrades is designated by PJM to one or more Transmission Owners –Cost responsibility is assigned to specific customers or groups of customers within the PJM zone(s) that receives the benefits of the Upgrades

OSC Meeting April 27, PJM Cost Allocation Participant Funded –Interconnection Customers pay 100% Attachment Facilities - facilities necessary to connect customer to grid Local Upgrades - facilities required to maintain reliable local operations caused by the interconnection Network Upgrades - transmission facilities required "But For" this interconnection to maintain reliable operations

OSC Meeting April 27, PJM Cost Allocation Participant Funded –Merchant Transmission Requested by Participant but not required in the Regional Transmission Plan Funded 100% by Participant –Interconnection Customers and Merchant Participants are eligible to receive the revenue rights derived from the incremental Available Transmission Capability provided from the Upgrades

OSC Meeting April 27, SPP Cost Allocation Rolled-in to Region-wide Rate and Zonal Rate –Base Plan Upgrades required for reliability Included in the SPP Transmission Expansion Plan Network upgrades associated with new or revised Designated Resources if three conditions are met 1.Commitment to DR is 5 years or more 2.DR shall not exceed 125% of Customer projected peak load 3.Upgrade cost is less than Safe Harbor Cost Limit - $180K multiplied by capacity value If conditions not met then may request a waiver

OSC Meeting April 27, SPP Cost Allocation Rolled-in to Region-wide Rate and Zonal Rate –If Base Plan Upgrades are less than $100k then cost is allocated to the zonal rate where project is located –If Base Plan Upgrades are greater than $100k then cost is allocated as follows: 33% to the region-wide charge 67% to the zonal charge allocated to the zones based on MW-mile benefits

OSC Meeting April 27, SPP Cost Allocation Participant Funded –Costs in excess of the Safe Harbor Limit are directly assigned to the Transmission Customer –Economic Upgrades are elective upgrades and construction must voluntarily be paid for one or more entities

OSC Meeting April 27, SPP Cost Allocation Participant Funded –Requested Upgrades are normally associated with transmission service requests All requests during a specific timeframe are aggregated and an optimal upgrade plan is developed to accommodate all ATC requests Costs for a given upgrade are allocated to each request which has an incremental power flow impact on the upgrade on a pro-rata basis in proportion to the total of all incremental impacts by requests in the aggregate study on the upgrade

OSC Meeting April 27, SPP Cost Allocation Participant Funded –Transmission Customers and other entities that pay for Economic Upgrades, Requested Upgrades and/or pay costs above the Safe Harbor limit are entitled to receive transmission revenue credits –SPP is currently preparing a FERC filing on proposed modifications related to the pro forma Large Generator Interconnection Procedure and Interconnection Agreement This filing may change the cost allocation for network upgrades associated with generator interconnections

OSC Meeting April 27, Entergy Cost Allocation New Transmission Pricing Proposal approved conditionally by FERC on April 24, 2006 Part of the Entergy Independent Coordinator of Transmission (ICT) Proposal still pending final FERC approval SPP has been selected as the Entergy ICT

OSC Meeting April 27, Entergy Cost Allocation Rolled-in to Region-wide Rate –Reliability Transmission Upgrade Not required by a generation interconnection Needed for continued reliability –Market Efficiency Upgrade Not required by a generation interconnection Designed to reduce the bulk power system costs to load system-wide

OSC Meeting April 27, Entergy Cost Allocation Rolled-in to Region-wide Rate –Base Plan Upgrades Necessary for long-term firm service commitments and maintaining reliable service for all LSEs in the Entergy region Costs recovered through the Entergy transmission revenue requirement in their Tariff

OSC Meeting April 27, Entergy Cost Allocation Rolled-in to Region-wide Rate –Base Plan Upgrade categories Long-term Firm Pt-to-Pt service commitments Network Integration Transmission Service commitments Generation commitments under the Network Resource Integration Service Maintain standards of safety and reliability applicable to the Entergy transmission system Meet service commitments that have degrade due to circumstances beyond Entergy's control

OSC Meeting April 27, Entergy Cost Allocation Participant Funded –Supplemental Upgrades are subject to "higher of" pricing rules If revenues exceed costs then costs will be included in revenue requirement If revenues are less than costs then service is charged on an incremental basis

OSC Meeting April 27, Entergy Cost Allocation Participant Funded –Supplemental Upgrade categories New generator interconnection costs under the Energy Resource Interconnection Service (ERIS) Generators requesting new Network Resource Integration Service (NRIS) Generators requesting designation as a Network Resource under Network Integration Transmission Service (NITS) New or expanded Firm Pt-to-Pt transmission service Investments requested to reduce transmission congestion Investments requested to increase transfer capability

OSC Meeting April 27, Entergy Cost Allocation Participant Funded –Supplemental Upgrade Rights Schedule firm Pt-to-Pt over the duration of the reservation without paying congestion Deliver from Designated Resources to load without paying congestion Request Pt-to-Pt or designate a generator as a NITS resource up to the ERIS requested Allow a generator to be designated as a Network Resource to any network customer after it passes the deliverability test for NITS

OSC Meeting April 27, Next Steps ? Research other cost allocation solutions –MISO –Transcos –Vertically Integrated Utilities –Others Review and discussion at next OSC