Chapter 3 Clarifying Contract Change Orders Construction Claims Management CEM - 591 Dr. Abdul Aziz A. Bubshait.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Organization of Primary Entities
Construction Contracting
ABC Change Orders College of Environmental Design
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
THE PARTIES TO CONSTRUCTION-RELATED PRIME CONTRACTS Construction-related prime contracts involve owners, architect/engineers, construction managers, and.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Chapter18 Contract Construction 1CE 417, King Saud University.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Marcy Mealy Procurement Specialist CDBG Program
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Time for a new standard - AS General Conditions of Contract
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Project Management Session 7
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
XII- COST CONTROL, MONITORING & ACCOUNTING
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
Accounting Specialist Basic Functions : To provide essential data by computing and distributing collections to their respective allocations. Knowing the.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Construction Contracts and Project Delivery Methods
Compensation events and claims Presented by Prof. Khem Dallakoti.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
Labor Standards Pam Truitt  September 10, Key Regulations & Statutes  Davis-Bacon Act  Copeland Act (Anti-kickback Act)  Contract Work Hours.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Agency Construction Management :CM NOT AT-RISK
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Measurement and Payment
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Introduction to Procurement for Public Housing Authorities Alternatives to Procurement: Force Account Labor Unit 9.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT DELIVERY METHODS
(Additional materials)
Introduction to Tech Communication & Project Management Arthur C.M. Chen , Rm
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
PROJECT DELIVERY METHODS
ARCH 435 PROJECT MANAGEMENT
Directed Change Constructive Change
Construction Management Services April 16, 2018
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

Chapter 3 Clarifying Contract Change Orders Construction Claims Management CEM Dr. Abdul Aziz A. Bubshait

CEM / 32 Outline  Who ’ s Who : Architect and Engineer  Change order compensation  Change order finalized  Notice requirements  Cost monitoring  Design/Build change orders  Phased construction  Design/Matrix change orders  Named subcontracts  Questionable work

CEM / 32 Who’s Who : Architect and Engineer  The two major professions within the design disciplines are the architect and the engineer.  Architecture is, in essence, the pursuit of the art and science of habitat for man in his environment, where as engineering focus on the study of the single technical area such as structural. geotechnical, mechanical etc.

CEM / 32 Architect and Engineer contd..  Architectural services usually extend beyond the design and the production of plans and drawings. Upon approval of plans and specifications, the architect incorporates his design into package of articles termed as contract document.  The architect assists in the selection of a bidder and in essence, becomes the agent of the owner, this is called agency of representation.

CEM / 32 Architect and Engineer contd..  The major distinction between architects and engineers runs along generalist and specialist lines.  Both these design professionals must have a thorough understanding of their liability in errors and omissions that lead to construction claims.

CEM / 32 Change order compensation  There are two scenarios to be visualized during the construction of a project –Work being completed without interruption –Work all over again with additional scope, rescheduling, payment disruptions etc.

CEM / 32 Change order compensation contd..  In the second scenario all extra cost items are classified into three categories. Direct cost ( labor, materials etc – The hard Costs) Indirect cost ( home office, lost profit – the Soft costs Consequential cost ( interference, disruptions, rescheduling) These are part of contract elements that sum up the maximum possible compensation allowed by contract change order.

CEM / 32 Change order compensation contd..  There are typically ten reasons for change orders called as adds and deducts. Design errors Changes in market conditions Changes in owner ’ s requirements Uncovering of undisclosed existing conditions Uncovering of unknown existing conditions Suggestions to initiate better, faster and economical construction

CEM / 32 Change order compensation contd.. Change in designer preference Discrepancies in contract documents Change in external requirements Final coordination with N.I.C ( Not in contract equipment)

CEM / 32 Change order compensation contd..  Most change orders apply to one of the three distinct categories:  Owner-acknowledged change orders –This is the most common category of change order that will be incorporated in the owner ’ s budget and will present the least conflict.  Constructive changes –This occurs when the owner or his or her authorized representative acts in such a way that causes a contractor to perform additional work.

CEM / 32 Change order compensation contd..  There are seven categories of constructive changes –Changes in method of performance –Misinterpretations of specifications –Defective specifications –Over inspection –Rejection of “ or equal ” submissions –Defective specifications –Defective owner-furnished property or equipment

CEM / 32 Change order compensation contd..  Consequential changes –This is similar to constructive change. It differs in that it is additional work that becomes necessary or additional costs incurred as a direct result of some usually more obvious change. It is the result of a domino relationship of cause and effect.  Concessions made by the contractor in these change- order categories must be based on the reality and should follow certain basic rules of concession.

CEM / 32 Change order Finalized  Accurate documentation is absolutely necessary for the changed work, whether or not the change order has been finalized at that point.  First consideration is to maintain a comparison of actual costs versus estimated costs.  Whether the work is proceeding on a time and material basis or a change has not been finalized for any other reason, precise documentation is the rule that must not be compromised.

CEM / 32 Change order Finalized contd..  Whether or not the change has been finalized, it is important to realize that the documentation of the indirect and consequential costs become even more important to proving a construction claim.  To accomplish these objectives ( documentations), a good cost accounting system and good schedule documentation management must be in place.

CEM / 32 Notice Requirements  Not all change order proposals are claims until they are refused by the owner, it is wise to make every effort to meet dispute resolution clause that may exist in the contract document.  Notification can be a double edged sword. If you strictly follow attorney ’ s advice on structuring the letter of notification it will appear as if you are ready to haul the owner into court tomorrow.

CEM / 32 Notice Requirements contd..  In this case the relationship may go adversarial, and away from an important level of trust.  On the other hand if contractor fears offending the owner, then the contractor can maintain good relations. The balance, then, lies in the ability to formulate effective communication.

CEM / 32 Cost Monitoring  The contractor must monitor project field service costs during the project.  Field costs are the function of Size and classification of labor forces Field office overheads Material and supplies Support services from home office Vehicle lease and fuel charges Corporate, general and administrative costs Consultant or contract services Job profit

CEM / 32 Cost Monitoring contd..  By tabulating the monthly accumulation of the budget and actual field service costs on a time versus cost chart, a plot similar to S-Curve is obtained  This plot is used to make visual comparison of the status of the contract, change in trend toward either a saving or a cost overrun.  To maintain this plot, regular inputs are required from the subcontractors and for which prime contractor should make arrangements.

CEM / 32 Design/Build Change Orders  Design build has become prominent in the last decade wherein the owner contracts with the designer/builder.  In this the designer and builder are the same entity and the advantage from a production stand point, is its speed of project completion, as this method uses phased construction as its production basis.

CEM / 32 Design/Build Change Orders contd..  Adding pre commencement activity and events timing control to the project production gives the owner the ability to jump start the project called fast track design/build.  In fast track design/build the perspective bidders cannot be given a detailed set of plans, as design is not yet complete. So builders, bid by square footage costs or by cost plus contracts.  This often leads to missed or ambiguous tasks that in turn generate change orders.

CEM / 32 Phased Construction  In a phased construction, components of the project are started prior to the main project commencement.  The big advantage to owner is that the production of essential components can begin before the total design of the project is completed, thereby incurring less interest cost.  In this type, the construction can begin with certain activities completed and ready for initial draw progress payments from the bank ’ s construction loan funds.

CEM / 32 Phased Construction contd..  The project is completed sooner, the owner has income from the capital project sooner, and the construction loan is paid off sooner.  The economic advantage of the phased construction is the cost control over the selected paths of critical activities running in series and parallel to the schedule.

CEM / 32 Phased Construction contd..  Responsibilities for completion of: Project design and specification depend on architect or design professional Modular components, long lead item procurement, and construction activities on the builder Production schedule development and tracking on the owner.  Mutual cooperation between the design professional, owner, and the builder is essential throughout the project in phased construction.

CEM / 32 Phased Construction contd..  One of the main difference between the phased construction and standard one is the handling of component construction.  In phased construction, preconstruction input by the builder and the owner team begins while the architect is still in the design phase, to prevent design changes later in the schedule.  For a phased construction schedule to be viable, the plans and specifications need to be 30 to 45% completed before the project schedule is developed and executed.

CEM / 32 Design Matrix Change Orders  In Design Matrix Networking specialized production designs are grouped in phases and activities, then utilized in number of project-oriented configurations.  This is the most sophisticated high end residential construction design system.  This is a highly responsive and event oriented operations system, producing a design network that will interface through the divisional factors. Thereby reducing time to manage multiple production schedules.

CEM / 32 Design Matrix Change Orders contd..  Design matrix networking requires manufacturers and builders with good communication skills and a commitment towards quality.  Missing or inadequate specifications are the root causes of change orders in this area.

CEM / 32 Design Matrix Change Orders contd..  Prospecting for the potential design matrix change orders include Tasks to be performed Time in events Exact specs of materials and equipment Long-Lead times Job logic sequence Optimistic and pessimistic completion time.

CEM / 32 Named Subcontracts  Named subcontracts, or owner-selected subcontractors, describe a special procedure for subcontract selection in which the subcontractors are directly handed to the prime contractor by the owner.  This arrangement serves the owner by providing the maximum advantage in competitive bidding.

CEM / 32 Named Subcontracts contd..  Owners use this approach generally for two reasons To reduce or eliminate the practice of “ chiseling ” the subcontractors by the prime contractor. The second reason is an attempt by the owner to exert some control over who will be performing what work, as well as the contractual provisions that will govern them.

CEM / 32 Named Subcontracts contd..  In this case there is serious difficulty for the owner, as all this owner activity removes the prime contractor ’ s responsibility for the respective subcontractor selection to a very great extent.  The simplest kind of problem that can develop is when the lowest bidder suddenly becomes unavailable, and generally it will be straight forward for the prime contractor to secure a change order that will be replaced by the next lowest bidder.

CEM / 32 Questionable Work  This is a document designed to notify the owner by the prime contractor, that by all appearances, the work in question is not apparently included in any of the owners subcontract scopes.  In this scenario the prime contractor runs into undefined work by a specific contractor and if this occurs the prime should submit a letter to the owner regarding responsibility determination for the questionable work.

CEM / 32 Chapter 4 Project Schedule Claims