CITY OF POUGHKEEPSIE LED STREET LIGHTING May 5, 2014.

Slides:



Advertisements
Similar presentations
STEPS TO SUCCESS WITH FCIP Ryan Freed Kansas Energy Office.
Advertisements

Palm Harbor Golf Course Golf Cart Purchase October 29 th, 2013 Presented by Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director.
Case Study 250,000 square foot suburban office building
TUHSD June 14, 2011 Making Sustainability Work Jonathan Schwartz Manager, Asset Optimization Kris Waters, CMIR Investment Recovery Manager.
ST PAUL’S WALNUT CREEK. ANATOMY OF A SOLAR SYSTEM ST PAUL’S CHURCH WALNUT CREEK.
Levior Energy LLC Can You Afford To Be Green? Michael Repper, CMA, CPA.
Capital Budgeting LECTURE 29. Ignores the time value of money. Ignores cash flows after the payback period. Payback Period.
Clean Energy Project Analysis Course Financial and Risk Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo Credit:
Unit 4: Utilizing Financial Documents
INVESTMENT ANALYSIS PRACTICE PROBLEM. A fertilizer dealer is considering the purchase of a new piece of equipment the will allow him to vary the application.
Agenda Introduction Focus of Study Approach Model Data Gathering Preliminary Findings.
ENERGY CONSERVATION TEAM (Facility Audits and Recommissioning )
Energy Efficient Houston Jennifer Ronk, PG, CEM, PMP.
M&E Fire & Security Leasing for Schools Peter Hurley Before you leap into buying speak to us about finance…
Mayflower Hill House Energy Audit May 8, 2015 Compiled by: George Voigt ’17, Danqing Zhao ’17, Kel Mitchel ’16, Emma Reif ’16, Savannah Judge ’15, Evan.
BOND SALE PLANNING WOODLAND PUBLIC SCHOOLS May 14, 2012 Prepared by: Mark Prussing Senior Managing Consultant Public Financial Management, Inc nd.
SWAAAE Tim Holmes Kenwood Energy January 30, 2012.
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.
Economic Evaluation of PV systems in Jordan
LED Street Lighting Project
SOLAR PV PROJECT REDDING AIRPORT Rod Dinger, A.A.E Support Services Director/Airport Manager Barry DeWalt Assistant City Attorney City of Redding.
City Land Based Customized Incentive Proposal City Centrum Economic Development Office City of Cape Coral, Florida March 21, 2011.
PACE FINANCING UPGRADE YOUR BUILDING AND IMPROVE YOUR BOTTOM LINE.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Project Planning Activities Project Schedule Risks Management and Project Feasibility Financial Calculations Tangible.
+ Parkview Personal Care Home Micheline Gaudet. + Welcome Home.
TowerWise.ca Energy Savings Purchase Agreement TEEAC Presentation.
SPARTA | Fall 2014 LED Retrofit Capabilities at MSU (Revisited)
Parking Lots 10 & 11. Child Care Parking Lot #12.
Department of Finance 1 Refunding Certificates of Participation, Series 2015A October 26, 2015 Finance Committee/City Council.
Air Conditioner Efficiency. Air Conditioner Problem Suppose an older home in San Antonio is equipped with a central air-conditioning unit with SEER rating.
FIN 335 TIME VALUE OF MONEY CHAPTERS 4, 5, 6, 7, 8, 9 EXAM REVIEW SPRING 2012.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
ELECTRI-CITY: Energy Management for the Modern U.S. City.
CALCULATING PAYBACK PERIOD. Formula Payback Period = Initial Investment Net annual savings + Income.
Soaring Above the Standards ‘The Atrium’ Scott Sinclair, P.Eng President (604)
LED Traffic Signals Review of Existing Deemed Measures Regional Technical Forum August 4 th, 2009.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Concho River Improvements February 18, River Improvements Project Consideration of approving matters related to Concho River improvements: Review.
T own-Wide Energy Performance Contracting to Finance Infrastructure Improvements 1.
Unit 4: Utilizing Financial Documents
Energy Services Company Models: Opportunities for Transit
Local Government Street Light Update
INNOVATIVE FINANCIAL INSTRUMENTS TO SUPPORT ENERGY EFFICIENCY:
Calculating Payback Period
The New York Power Authority
WATER REVENUE REFUNDING BONDS SERIES 2017A
Newark Public Schools: PRESENTATION TO THE CAPITAL PROJECTS CONTROL BOARD – EQUIPMENT LEASE FINANCING June 29th, 2017.
About the Author. Creating an Apartment Feasibility Model For Park Cities By Terry Asante.
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Phase 3 Solar Feasibility Study Findings and Recommendations
ALTERNATIVES TO THE NET PRESENT VALUE RULE
Financing Land Development Projects
Photovoltaic Systems Engineering Session 26
City-wide LED Street Light Conversion Program
Economics of Energy Efficient Lighting Outdoor
Environmental Upgrade Agreements
Unit 5.1 Utilizing Financial Documents
Energy Services Company Models: Opportunities for Transit
PACE FINANCING   PACE FOR MULTIFAMILY HOUSING.
ELECTRIC REVENUE REFUNDING BONDS SERIES 2016A
City of Lebanon, Missouri Electric Department
Unit 4: Utilizing Financial Documents
Example Exercise 2 Cash Payback Method Cash Payback Method
Ch. 8 Utilizing Financial Documents
Rose Bowl Refunding Bonds Series 2018 A&B
Photovoltaic Systems Engineering Session 22
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

CITY OF POUGHKEEPSIE LED STREET LIGHTING May 5, 2014

Preliminary Project Economics 1 Total Project Summary  Proposed LED Project includes the following:  LED Street Lighting Upgrades  LED Traffic Signal Upgrades – 93 Intersections  Purchase Price of Existing Lights from Central Hudson for $327,522 – City is negotiating pricing  Security Deposit on Attachment of Lights to Central Hudson Utility Poles of $149,500

Preliminary Project Economics 2  Summary Preliminary LED Project Economics  Estimated Project Cost$5,547,811  Annual Energy Savings 2,158,160 kWh  Annual Energy Cost Savings$165,675  Annual O&M Savings$265,346  Total Cost Savings (First Year)$431,021  Annual Payment$399,232  Simple Payback Period12.2 years  Net Present Value (NPV)$2,032,647  Return on Investment (ROI)36.48%  Savings over 25 Years$5,378,471

Preliminary Project Economics 3 Cash Flow BAN Interest Rate 1.75% BOND Interest Rate 3.75% Term of 20 Years

Preliminary Project Economics with Rate Increase 4  Summary Preliminary LED Project Economics  Estimated Project Cost$5,547,811  Annual Energy Savings 2,158,160 kWh  Annual Energy Cost Savings$248,594  Annual O&M Savings$265,346  Total Cost Savings (First Year)$513,940  Annual Payment$399,232  Simple Payback Period10.3 years  Net Present Value (NPV)$3,015,315  Return on Investment (ROI)54.35%  Savings over 25 Years$8,411,244

Preliminary Project Economics with Rate Increase 5 Cash Flow BAN Interest Rate 1.75% BOND Interest Rate 3.75% Term of 20 Years

Comparison of Rate Increase 6  Description Current Rate W/ Rate Increase  Estimated Project Cost$5,547,81$5,547,811  Annual Energy Savings 2,158,160 kWh 2,158,160 kWh  Annual Energy Cost Savings$165,675$248,594  Annual O&M Savings$265,346 $265,346  Total Cost Savings (First Year) $431,021$513,940  Annual Payment$399,232 $399,232  Simple Payback Period12.2 years10.3 years  Net Present Value (NPV)$1,603,168$3,015,315  Return on Investment (ROI)28.90%54.35%  Savings over 25 Years $5,378,471$8,411,244

Comparison of Rate Increase 7

Next Steps

Project Next Steps 8  Council Approval of Project  Central Hudson License Agreement – City Needs to Finalize the Terms of the Agreement with Central Hudson  Authorize Prototype of Different Manufactures to be Installed and Finalize Fixture Selections

Project Schedule 9  May 5th, 2014  Presentation to the Common Council  May 5th, 2014  Council Resolution to Approve Project and Financing  August 15, 2014  Estimated Start of Construction  August, 2015  Measurement And Verification

Questions & Discussions Thank you. Wendel Energy Services, LLC Joseph DeFazio, PE, Vice President of Energy Services Sam Marotta, CEM, CMVP, BEAP, Project Lead