2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

PHENIX Planning Meeting February 23, Upcoming Access Days Wed Feb 29 We will request 4-6 hr access Work needed in IR? Do not separate VTX/FVTX this.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
6/7/20121 PHENIX WEEKLY PLANNING 6/7/2012 Don Lynch.
2/16/20121 PHENIX WEEKLY PLANNING 2/16/2012 Don Lynch.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
3/15/20121 PHENIX WEEKLY PLANNING 3/15/2012 Don Lynch.
8/30/20121 PHENIX WEEKLY PLANNING 8/30/2012 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/2/20121 PHENIX WEEKLY PLANNING 8/2/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
3/29/20121 PHENIX WEEKLY PLANNING 3/29/2012 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
4/5/20121 PHENIX WEEKLY PLANNING 4/5/2012 Don Lynch.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
7/26/20121 PHENIX WEEKLY PLANNING 7/26/2012 Don Lynch.
9/13/20121 PHENIX WEEKLY PLANNING 9/13/2012 Don Lynch.
5/3/20121 PHENIX WEEKLY PLANNING 5/3/2012 Don Lynch.
7/19/20121 PHENIX WEEKLY PLANNING 7/19/2012 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
1 3/24/2011 PHENIX WEEKLY PLANNING 3/24/2011 Don Lynch.
3/8/20121 PHENIX WEEKLY PLANNING 3/8/2012 Don Lynch.
823/20121 PHENIX WEEKLY PLANNING 8/23/2012 Don Lynch.
6/14/20121 PHENIX WEEKLY PLANNING 6/14/2012 Don Lynch.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/1/20121 PHENIX WEEKLY PLANNING 3/1/2012 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
4/19/20121 PHENIX WEEKLY PLANNING 4/19/2012 Don Lynch.
6/28/20121 PHENIX WEEKLY PLANNING 6/28/2012 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
7/12/20121 PHENIX WEEKLY PLANNING 7/12/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
1 3/31/2011 PHENIX WEEKLY PLANNING 3/31/2011 Don Lynch.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
1 6/23/2011 PHENIX WEEKLY PLANNING 6/30/2011 Don Lynch.
8/11/20111 PHENIX WEEKLY PLANNING 8/11/2011 Don Lynch.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
Presentation transcript:

2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch

2/9/20122 This Week New detector commissioning Cosmic Ray Tests Run 12 beam commissioning maintenance Day – Today 8 hr restricted access to IR and tunnels Move VTX/FVTX to run position DC repairs Other? MPC North rack assembly Planning and preparation for 2012 shutdown

2/9/20123 Next Week Run run run maintenance Day – Wed 8 hr access (may be cancelled?) No planned tasks yet? MPC North rack assembly Planning and preparation for 2012 shutdown sPHENIX design and analyses

2/9/20124 Window Washer Safety Pins: Remote insertion/retraction

2/9/ ton crane repair

2/9/20126 Looking Ahead to the 2012 Shutdown Major Projects: Remove VTX/FVTX Repair upgrade, tst, reinstall VTX/FVTX Remove/Repair/Upgrade MuTr Station 1 South Station 2 South (north side) upgrade Station 3 North and South (upper half) re-capacitation and air manifold upgrades RPC stations 1 and 3, north and south maintenance Other detector maintenance as required Infrastructure maintenance as required TBD prototype tasks

2/9/20127 Looking Ahead to the 2012 Shutdown (Continued) Rough Schedule: Prep for shutdown2/1-6/15/2011 Define tasks and goals Analysis and design of fixtures, tools and procedures Fabricate/procure tools and fixtures Tests, mockups, prototypes Receive, fabricate, modify, finish installables Review and approval of parts, tools, fixtures and proceures Assembly and QA tests Run 12 Ends6/15/2012 Shutdown Standard Tasks6/15-7/13/2012 Open wall, disassemble wall, Remove MuID Collars, Move EC to AH, etc. Disassemble VTX/FVTX services 7/2-7/20/2012 Remove VTX/FVTX and transport to Chemistry Lab 7/20/2012 Remove MMS & MMN vertical East lampshades7/23-7/27/2012 MuTr South Station 1 work Install access (Sta. 1work platforms) 7/23-7/27/2012 Disconnect Cables, hoses etc, ID/label all 7/30-8/3/2012 Remove FEE plates and chambers 8/6-8/10/2012 Station 2 Terminators and manifold upgrade through 8/13/-8/31/2012 access opened by station 1 removal

2/9/20128 MuTr South Station 1 work (Cont’d) Clean/install new MuTr Sta. 1 chamber parts and upgrades 8/13/-8/31/2012 (concurrent At RPC Factory) Re-install chambers and FEE plates 9/4-9/7/2012 Re-cable, re-hose and test 9/10-9/28/2012 Repair upgrade, test, reinstall VTX/FVTX7/23-9/17/2012 Station 3 North and South (upper half)7/23-9/30/2012 re-capacitation and air manifold upgrades Summer Sunday (RHIC)8/5/12 Substation breaker upgrade/test (CAD)TBD AH utility power distribution upgradeTBD RPC stations 1 and 3, north and south maintenanceAs required Other detector maintenance as requiredAs required Infrastructure maintenance as requiredAs required TBD prototype tasksAs required pre-run commissioning and prep for run 1310/1-11/30/2012 Prep for EC roll in11/5-11/9/2012 Roll in EC11/12/2012 Prep IR for run11/12-10/17/2010 Pink/Blue/White sheets10/17-11/30/201 Start run 1312/3/2012 Looking Ahead to the 2012 Shutdown (Continued)

2/9/20129 SPHENIX

2/9/ sPHENIX Upgrades PHENIX engineering and design are providing support for overall structural and spacial design and modeling, cost estimation and prototype design/fabrication Outer Hadronic Calorimeter Inner Hadronic Calorimeter EMCalorimeter Superconducting Solenoid VTX3.0

2/9/ Inner and outer Hadronic Calorimeters 320 segments each, steel and scintillator 1 meter total thickness, 6+ meters long ElectroMagnetic Calorimeter 314 segments, Tungsten and scintillator m th 3.5 m long Superconducting solenoid 2 Tesla Magnet and cryostat.95 m inner radius,.39 m th VTX 3.0 vertex detector (upgraded from present VTX)

2/9/ Electromagnetic calorimeter segments sing “accordian” shaped scintillators and tungsten plates to optimize detector sampling

2/9/ Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall, over door between control room and elect. ass ’ y room, southeast corner of IR and laser room. Flooding in AH/ Driveway heaving Electronics test/assembly room- to-parking lot door (does not open/close/lock properly – needs to be replaced) Septic odor on the east side of trailers Infrastructure Issues

2/9/ Safety, Security, Etc. 1.Due to the special access today, the PHENIX Engineers and Technician review of 2011 shutdown projects is moved from today to next Tuesday 2/14/12 at 10:00 AM. 2.From Ray Karol: The Top 10 Safety Violations in 2011 according to OSHA: 1.Fall protection (7139 violations) 2.Scaffolding (7069 violations) 3.Hazard communication (6538 violations) 4.Respiratory protection (3944 violations) 5.Lockout/tagout (3,639 violations) 6.Electrical, wiring methods (3584 violations) 7.Powered industrial trucks (3432 violations) 8.Ladders (3244 violations) 9.Electrical, general requirements (2863 violations) 10.Machine guarding (2728 violations)

2/9/201215

2/9/ Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: