Proposed LBT Instrument Facility Enclosure OSU MODS.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Lightweight Forming System and Roofs for Concrete Floors.
Jim McElwain College Architect SETTING UP A LABORATORY.
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Building Envelope. Energy Conservation House design and orientation Lifestyle changes Energy efficiency.
Make the most of your energy Head Office – Case Study.
Skyscraper Construction
Equipment and Facilities. 154 Plan Review The local health department must assess your facility and equipment before: –Beginning construction of a food.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
ASHRAE Club Project VAV Fumehood Retrofit - Engineering III Building Engineering III Building 40,000 gsf Completed 2002 Designed and constructed in two.
NSS Requirements Review: Labs and Workshops Michelle Everett Lab Coordinator Scientific Activities Division November 12,
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
R-I-T Project Improvement Project Matthew Bonaventura Jimmy Ichihana Eric MacCormack Cody Rath Colin Roy.
Weather Cloud Formation May 19, Adiabatic Temperature Changes When air is allowed to expand, it cools, and when its is compressed, it warms. Do.
Design & Layout of Foodservice Facilities
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Asbestos Exposure Presentation Presented by: Todd & Cue Ltd © 2006, 2012 Zywave, Inc. All rights reserved.
Model for Sharing Facilities Bill Miller-U of M Lab Manager.
LIEE Training at PG&E Presentation to the LIOB January 26, 2010 San José, CA.
Town of Pulaski and Pulaski County Preliminary Building Concept for Virginia’s Nanotechnology Park October 3, 2008.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Update on the SEEM Simulation Program Larry Palmiter and Ben Larson August 4, 2008 Ecotope Inc. Presented at Regional Technical Forum Portland, Oregon,
Status of SNOLAB Development Fraser Duncan SNOLAB Workshop 4 Oct 2008.
Baseline Change Request BCR Title: EBD New 6 Ton Bridge Crane Installation BCR #: N/A Presenter’s Name: Robert Law CCB Presentation Date:
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
HEAT LOAD ESTIMATING USING THE RULE OF THUMB METHOD © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
1 Choice of the cleanroom Laser specifications  class 10,000 b) Softwall cleanroom Entire room = cleanroomLaser size = cleanroom Entire room = cleanroom.
Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.
Relative Humidity. Humidity  the measure of the amount of water in the air  high humidity =lots of moisture in the air.
Main Idea Interior designers make interior spaces functional, safe and beautiful for almost any type of building. Such as offices, homes, shopping malls,
A Prefabricated Framing and Enclosure System. The Problem.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
CTC facilities App Lab Exhibition Space 3Sixty and control room CETLE Room Meeting room Interior office.
Template for DUSEL Meeting with Potential Experiments.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Land Breezes and Sea Breezes Sea Breeze. Sea Breeze: During the day, the land warms up faster than the water. The warm air over the land rises, while.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Interest Free Energy Efficiency Loan Program Proposal for Improvements August 15, 2016.
2016 Maintenance Innovation Challenge
CLIC Handling Engineering Update
CLIC Civil Engineering Update
Integrating a Data Center into an Engineering Laboratory Building
CONVERSION OF AN INDUSTRIAL HALL INTO AN OFFICE BUILDING. CASE STUDY
Resale Property Resale Property
(Refer to Chapter 2 of the textbook)
LARP Vertical Test Facility
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Radiation-safe area for electronics, or laser or
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
INDUSTRIAL / COMMERCIAL Facility For Lease
Electrical Safety Standards
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
Poswillow Suite, Children's Dental Unit

Program Proposal to ITGC

Presentation transcript:

Proposed LBT Instrument Facility Enclosure OSU MODS

Proposed First Floor LBT Instrument Facility Minimizes handling, lifting, and moving Safe access to auxiliary bay crane Space for large, high ceiling cleanroom Utilities nearby Proximity to existing electronics lab Space for wet and dry bench lab

Consider possibility of second floor use above facility Architectural & structural consul t and approval Cost of installation of additional heating, cooling, and air handling capacity Size, class, and cost of cleanroon Requirements for mobile crane within enclosure Feasibility of using level 3L for machine shop Cost estimates for interior insulation, finishing, and furnishings Actions Required to Evaluate