Seminário Regulação, Infraestrutura e o Futuro do País FGV, 31 julho 2014 Jerson Kelman COPPE-UFRJ

Slides:



Advertisements
Similar presentations
LATIN ENERGY 2005 Regulatory Process JERSON KELMAN December 8th, 2005
Advertisements

1 HSBC Utilities Day November 27, 2008 Manoel Zaroni Torres - CEO Tractebels Hydro Allocation Process.
ENERGY SECTOR IN MONTENEGRO
E: Track II Project level analyses Robert Lempert, RAND 1.
ERSE General presentation from ERSE about the current natural gas regulatory situation in Portugal 2nd Regional Coordination Committee (RCC) Meeting of.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
CREE Site Visit Oslo, September 19, 2013 Who Should Pay for Transmission? Nils-Henrik M. von der Fehr.
The Brazilian Electricity Market: Achievements and Challenges
The Brazilian Energy Market ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005 ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005.
1 Competition Policy and Regulation in Hydro-Based Electricity Markets Luiz Rangel Energy Centre, University of Auckland September 2007.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
Ranci Highways Nov.261 Highways: Cost and Regulation in Europe Università degli studi di Bergamo November 26 th -27 th, 2004 Applying a Price Cap: RAB.
Energy Resources Human Impact on the Environment.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Business of Energy - Fall Quarter. Seminar Schedule Introduction A Few Opening Questions… Presentation Today’s Schedule.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Uib.no UNIVERSITY OF BERGEN Development of Energy law Legal Challenges Professor Ernst Nordtveit Faculty of Law Insert «Academic unit» on every page: 1.
Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis.
O Papel da Universidade no Século XXI: o MIT e o Crescimento do Brasil Jerson Kelman CEO, Light S/A 11 de Agosto de 2010 São Paulo - Brasil.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
Monopoly. Monopoly Monopoly is when the market is dominated by a single seller Monopoly is when the market is dominated by a single seller –They can take.
Hydrology Days 2004 Applied Stochastic Hydrology Lessons Learned from the Brazilian Electric Energy Crisis of 2001 Jerson Kelman President of ANA (Brazilian.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
PRESENTATION BY GBOLAHAN ELIAS D.Phil (OXON.) SAN G. ELIAS & CO. (SOLICITORS AND ADVOCATES) AT THE AFRICA LEGAL NETWORK (ALN) CONFERENCE AND ANNUAL GATHERING.
“Brazil’s Moment in the sun” Energy front – a key part of its economy Jerson Kelman – CEO, Light S/A.
BG Group Managing Risks and Seizing Opportunities for Local Companies in the Oil & Gas Sector pre-UNCTAD XI Perspectives for the Gas Sector in Brazil Luiz.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
HYDROPOWER LUCÍA & ROCÍO. Introduction Nowadays, we live in a planet that has been exploited in an extreme way and its resources have been used in large.
Exploring Hydropower. Water Cycle Gravitational Energy.
STELLA, KATIE, AND CLAUDIA PERIOD 2 HYDROPOWER. What is hydropower? Energy that comes from moving water Renewable source of energy because it is based.
Balanced Portfolio for Reliable Electricity System YES Inc. Brief Assessment.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Market Response to Winter Dupont Group Energy Summit New England Power Generators Association Carol J. Holahan, Esq. October 5, 2015.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
1. Mirza Hamid Hasan 29 September  Need for Regulation  Historical regulation authority and mechanism  Creation of present regulatory agencies.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
World energy production by source in 2004: Oil 40% coal 23.3% natural gas 22.5% hydroelectric 7.0% nuclear 6.5% biomass and other 0.7%.
Illinois Wholesale Market Update December 10, 2003.
 Competition = ? the rivalry that exists between firms when trying to sell goods to the same group of customers  Do Getting started P96.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
Students understand the relation of hydropower compared to wind power. How does energy develop through the flow of current (water) moving through a generator?
4th WORLD WATER FORUM Session FT Ensuring dams are a platform for growth and development A developing country perspective Jerson Kelman General-Director.
Romanian Natural Gas Regulatory Authority (ANRGN) Dan Pantilie President ANRGN Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
1 9. BUSINESS STRATEGIES IN ELECTRICITY MARKETS Asko Vuorinen.
Gints Zeltiņš Commissioner of the Public Utilities Commission of Latvia Multi-sectoral regulator: Public Utilities Commission of Latvia.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Issues involving Contract and Spot Sales of Hydropower in Peru.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
International Trade.
GEORGIAN ELECTRICITY MARKET OPERATOR
CONSUMER ISSUE: Factoring consumer concerns into the public interest
Generating Electricity 7
Policy Instruments February 6, 2013 Sustainable Energy Policy.
Direct lines - problem in Bulgaria
CO2 Allowance Allocations in RGGI
Overview of the New Mexican Energy Model
Direct lines - problem in Bulgaria

Cired Alpha Session 6 Special Report Question 3
Direct lines - problem in Bulgaria
Prices In The Market.
The Brazilian Power Sector Reform
CSD 12 Integrated Water Resources Management UN, April 19, 2004 Jerson Kelman Planning and management of water resources at the scale of the river basin,
Direct lines - problem in Bulgaria
Prices In The Market.
Presentation transcript:

Seminário Regulação, Infraestrutura e o Futuro do País FGV, 31 julho 2014 Jerson Kelman COPPE-UFRJ

Explaining to the consumer the rise of electric energy tariff

Tariff calculation is based on the “required revenue” of the discos Non manageable costs (Parcel A): Pass through Energy Taxes Transmission system Manageable costs (Parcel B): Subject to the regulator O&M Depreciation Remuneration of the capital + – 64 distribution companies

Parcel A Pass trough Parcel B Regulated Present situation (2014)

The dispatcher ranks the generators by unit price 5 In countries that get electricity from coal or oil, power dispatch is done “locally” and is conceptually a simple matter

6 Future Today Time In countries that most of the electricity is generated by hydro plants, hydrological uncertainty is a relevant issue Future water storage depends on present storage, future water inflow and the decision about how much thermoelectricity could be substituted by hydroelectricity

Hydrological uncertainty

Reliability Energy buyers (distribution companies & free consumers): 100% of the energy consumption should be contracted through PPAs Energy sellers (generators) ∑ PPAs < calculated firm energy

Energy producer 1 Energy producer 2 Energy Producer m Disco 1 Disco 2 Disco n New power plants are built if their proponents win Government organized auctions of PPAs

Centralized dispatch In order to take advantage of hydrological diversity, energy is transported through long distances Hydropower plants in the same river basin are own by different companies Hydropower plants share the joint production proportionally to the firm energies In order to take advantage of hydrological diversity, energy is transported through long distances Hydropower plants in the same river basin are own by different companies Hydropower plants share the joint production proportionally to the firm energies

Three contemporary regulatory problems How to incentive the existing hydropower plants to be transparent, innovative and efficient? Regulatory activism X Regulatory stability How to allocate the energy theft and delinquency cost between the Discos and the honest consumers?