Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

1 Session 20 Just-in-Time Systems Toyota’s JIT system –JIT elements –Kanban cards –Kanban system rules –Two card and kanban system rules –Toyota MPS policy.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Chapter 14 JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
Just-In-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Beni Asllani University of Tennessee at Chattanooga
ERP: Mfg Plan’g and Control(MPC) 에 근거하여 SNU MAI LAB Just In Time.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
Operations Management
JIT and Lean Operations
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Chapter 7, Lean Thinking and Lean Systems
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 15 Lean Operations.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Just-In-Time Chapter 3.
1 1. Some Thoughts on Production Management 2. What is Just-In-Time ? 3. How does EOQ Impact JIT ? 4. Motivation For EOQ 5. Impacts of Reducing Inventory.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
1 Session 19 Just-In-Time Manufacturing JIT Impact on the MPC System JIT Continuous Improvement –JIT Building Blocks –Elements of JIT Kanban Systems –Single.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Just-In-Time & Lean Systems
LEAN system.
Introduction to Accounting Information Systems
JIT and Lean Operations
Chapter 13 Lean Systems This presentation covers the material in Chapter 13 - Lean Systems.
McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Just in Time Chapter 9 Vollmann, Berry, Whybark, Jacobs.
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 14 Operations Management: Managing Vital Operations.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
Lean Production.
9-1 © 2006 The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Value Chain Management Development of a set of functional-level strategies.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Operations Fall 2015 Bruce Duggan Providence University College.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
10-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Cross-Cutting Capabilities: Lean Operations,
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
JIT and Lean Operations Characteristics of Lean Systems: Just-in-Time  Pull method of materials flow  Consistently high quality  Small lot sizes  Uniform.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Manufacturing Planning and Control
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Just-In-Time and Lean Production
Inputs and Outputs to APP
Presentation transcript:

Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter 9

9-2 Just-in-Time Just-in-time (JIT) approaches to manufacturing planning and control change both manufacturing practices and MPC execution. JIT reduces the complexity of detailed material planning, the need for shop-floor tracking, work-in-process inventories, and the transactions associated with shop-floor and purchasing systems.

9-3 Agenda Just-in-Time (JIT) and MPCJIT ExampleJIT ApplicationsNon-repetitive JITJoint-Firm JITJIT SoftwareManagerial ImplicationsPrinciples

9-4 Just-in-Time in Manufacturing Planning & Control Resource planning Sales and operations planning Demand management Master production scheduling Detailed material planning Material and capacity plans Shop-floor systems Supplier systems Detailed capacity planning JIT impacts most MPC systems

9-5 JIT Elements Elimination of discrete batches Reduction of work- in-process inventory Level loaded capacity schedules Mixed model master production schedules (all items are made all of the time) Visual control systems Direct ties to vendors

9-6 JIT Action Programs Reduced setup times and lot sizes “No defects” goal Improved quality through process improvement Total productive maintenance (TPM) Poka-yoke–foolproof operations Continuous improvement Worker involvement Cellular manufacturing

9-7 Streamlined execution on shop floor and purchasing Reduced number of planned parts and fewer levels in BOM Level capacity loading Higher velocity of manufacturing eliminates the need for complex production activity control JIT and MPC

9-8 JIT Benefits Reduced throughput time Shorter material movement distances Fewer material movements Reduced transactions Simplified MPC Reduced changeover times Greater market responsiveness Inventory reductions Labor cost reductions More satisfied/cohesive workers Better team work Space reductions Quality cost reductions Quality improvements

9-9 The Hidden Factory The hidden factory processes transactions Logistical transactions Balancing transactions Quality transactions Change transactions Hidden Factory

9-10 JIT Building Blocks Product design Process design Manufacturing planning and control Human/ organizational elements JIT

9-11 JIT Example Multiple models with unique parts and widely varying forecasts 200,000 basic 2,500 clad 25,000 basic 100,000 clad

9-12 Leveling the Production Plan a level output of each model Production of each model during each day (or suitable short interval) Full-mix production reduces inventory build- up Convert annual forecasts to daily requirements Differences between requirements and current lot sizes drives setup time reduction

9-13 Pull System Introduction A pull system authorizes a work center to produce only when there is a downstream need Work centers don’t produce just to keep workers busy Production in response to a signal Verbal request, empty container, kanban cards, etc.

9-14 Daily Production and Current Lot Size Mismatches Pan ModelHandleMetalAnnual Forecast Daily Forecast Lot Size 151ABasicSheet200, , BBasicClad2, CExecutiveSheet25, , DExecutiveClad100, ,000 Lot sizes cover 10 to 90 days usage!

9-15 Product Redesign for JIT Common handle with variable grip Simplified handle design reduces inventory items and number of operations

9-16 Process Design for JIT Product redesign allows rethinking factory layout Cellular manufacturing with visible inventory management, less inventory, and shorter product flow distances

9-17 Pull System Inventory Control 2 full containers signal handle assembly to stop working Final assembly consumes stock until container is empty Empty container returned, signaling handle assembly to begin working Final assembly uses second container while first is refilled Full container is returned to final assembly for use

9-18 JIT Applications Single-card kanban system A card is attached to each container of finished parts. When the parts are moved to the next processing center, the card is returned to the supplying center to authorize more production. Each container has a kanban card, the number of cards controls the inventory levels

9-19 Non-Repetitive JIT JIT originated in high-volume repetitive manufacturing situations Many principles can be applied to low-volume settings Two key problems arise Requirement of setting up high-volume flow lines dedicated to a few products Level loading

9-20 Service-Enhanced JIT JIT objective of accepting any customer order and producing it behind any other order remains key Flexibility to handle large surges in volume or mix changes is also important Flexible systems can enhance JIT Product design, manufacturing flexibility, and worker cross-training are keys

9-21 Joint-Firm JIT When properly implemented, JIT can facilitate relationships with suppliers and improve both firm’s competitiveness. Poorly implemented, suppliers are often asked to buffer inaccurate schedules. A number of basic requirements exist A stable schedule Reduced supplier base

9-22 JIT Coupling Tightly Coupled Suppliers build to an exact sequence Parts are not held in inventory at the supplier or the manufacturer Inventory transactions are unnecessary, supplier is paid based on manufacturer production Requires flawless execution by both firms Less Tightly Coupled Supplier has more customers Customer has multiple suppliers Goods are delivered according to a schedule Some goods are held in inventory at supplier and/or manufacturer Useful when uncertainty is higher

9-23 JIT Hubs Suppliers place goods in an inventory location that is physically close to the customer Supplier and customer can eliminate their inventories Visibility of hub inventory is available to both supplier and customer Supplier needs knowledge of customer’s expected usage Supplier has flexibility in how to meet demand

9-24 JIT Software Overall Platform MRP Systems JIT Systems Common Systems (both MRP and JIT)

9-25 Information systems– changes are required to support JIT MPC–JIT can reduce inventories and the need for much of quality control, receiving, kitting, paperwork, and detailed scheduling Scorekeeping– measurement systems must change to reflect the objectives and realities of JIT Pros and Cons–JIT works well in some situations and not in others Managerial Implications

9-26 Principles Stabilizing (or leveling) the production schedule is a prerequisite to effective JIT systems. Achieving very short lead times supports better customer service and responsiveness. Reducing hidden factory costs can be as important as reducing more visible costs. Implementing the “whole person” concept reduces distinctions between white- and blue- collar workers and taps all person’s skills for improving performance.

9-27 Principles Cost accounting and performance measures need to reflect the shift in emphasis associated with JIT. To achieve JIT’s benefits in a non-repetitive application, some basic features of repetitive- based JIT must be modified. JIT is not incompatible with MRP systems. With an incremental approach, MRP firms can adopt as much or as little of JIT as they desire.

9-28 Quiz – Chapter 9 JIT replaces discrete manufacturing batches with ____________ ___________ goals. Under JIT, the objective is to reduce _________, __________, and ______________. Transactions required to track materials, verify activities, ensure quality, and manage changes are referred to as the ___________ factory. JIT is likely to utilize a push scheduling system? (True/False) A kanban system is used to manage ___________ transactions. JIT adoption may require a change in measurement and reward systems? (True/False)