Path to Mission Concept Review

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

2 - 1 WCRP Denver 2011 Measurement of Decadal Scale Climate Change from Space Marty Mlynczak, Bruce Wielicki, and David Young NASA Langley Research Center.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
National Aeronautics and Space Administration 1 GRC All-Hands Meeting 1 May 2006.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
JPL’s Approach for Helping Flight Project Managers Meet Today’s Management Challenges Charles J. Leising Space Telescope Science Institute Technical Colloquium.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
ICESat dH/dt Thinning Thickening ICESat key findings.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
LSU 10/09/2007System Design1 Project Management Unit #2.
Engineering Systems of.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Effective Methods for Software and Systems Integration
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Space Engineering 2 © Dr. X Wu, 2012
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
Command and Data Handling (C&DH)
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
CLARREO Mission Studies Overview David F. Young First CLARREO Mission Study Team Meeting Newport News, VA April 30 - May 2.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
NASA Earth Science Technology Update Presented to Doppler Wind Lidar Working Group April 28, 2015 George J. Komar Associate Director/Program Manager Earth.
1 Global Tropospheric Winds Sounder (GTWS) Reference Designs Ken Miller, Mitretek Systems January 24, Jan-02.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Preparing for a Wind Lidar Venture Class Mission Discussion at Lidar Working Group Meeting Bar Harbor, ME August 24 – 26, 2010 Dr. Wayman Baker 1.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
NASA Applied Sciences Program Update John A. Haynes Program Manager, Weather National Aeronautics and Space Administration Applied Sciences Program Earth.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
New Products from NASA’s Software Architecture Review Board
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Welcome David Young Project Scientist CLARREO Mission Formulation Team NASA Langley.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Decadal Survey Tier 1 Missions Road to Mission Concept review Mary DiJoseph ESM Program Deputy Technical.
SAS-05-SpecTRM-TeamX- Meshkat 1 Infusing SpecTRM in the TeamX environment Leila Meshkat¹, Kathryn Weiss², Michael Luna¹, Nancy Leveson² 1: Jet Propulsion.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California CLARREO GPS RO/AJM-JPL.
Orbital Analysis for Inter-Calibration Dave Mac Donnell Brooke Anderson Bruce Wielicki Don Garber NASA Langley Research Center Solar Workshop January 30,
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
CLARREO Pathfinder - Overview
Camera PDR/CD1 Planning 19 September 2008
TEMPO Instrument Update
I&T&C Organization Chart
Identify the Risk of Not Doing BA
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
TEMPO Instrument Update
Systems Engineering Management
EagleSat 2 – Mission and Development Overview
Preliminary Project Execution Plan
GLAST Large Area Telescope:
Project Management Unit #2
Presentation transcript:

Path to Mission Concept Review Michael J. Gazarik Deputy Director for Programs System Engineering Directorate NASA Langley Research Center October 23, 2008 Robert Reisse CLARREO Study Project Manger Contributors Michelle Garn, Paul Speth, Steve Hall

Outline Science and Engineering Interaction: Key to Mission Success Purpose of a Mission Concept Review (MCR) Required Products for a Successful MCR Schedule of Activities leading to MCR Integrated System Engineering Team What we need from the Science Community

CLARREO & DESDynI CLARREO & DESDynI are the next Decadal Survey missions to be addressed by the ESD Both missions are directed science missions with individual budget lines. They are managed out of the Earth Systematic Missions (ESM) Program Office located at GSFC The CLARREO mission is led by LaRC, with GSFC support Draft level 1 requirements & initial international partnership discussions, Fall 2008 Initial mission concepts, Spring 2009, Full technology readiness assessment, MCR October 2009 The DESDynI is led by JPL, with a significant GSFC contribution Mission configuration down select, Spring 2009 From Steve Volz, Associate Director, Flight Programs, NASA Earth Science Division

CALIPSO

NASA Mission LifeCycle Pre-Phase A: Concept Studies MCR: Mission Concept Review Phase A: Concept & Technology Development SRR: System Requirements Review Phase B: Preliminary Design PDR: Preliminary Design Review Technology Readiness Level should be at least 6 Phase C: Final Design CDR: Critical Design Review Phase D: Assembly, Integration & Test Phase E: Operations Phase F: Closeout

Mission Concept Review (MCR) Related to Key Decision Point (KDP A) – used by NASA to decide if mission should move into Phase A (Formulation) Our opportunity to advocate to Agency management and independent review board that mission is well formulated and defined – with rationale for key decisions

Roadmap to Mission Concept Review (MCR) Science Imperatives (Goals), Objectives, Questions Objective: Establish a climate benchmark for testing/validation of climate models Detailed Science Questions Level 1 Requirements From the objectives develop level 1 requirements. CLARREO shall measure xx with an accuracy of xx and spatial resolution of xx, etc MCR deliverable: Level 1 Requirements Document Mission Requirements & Operational Concept Develop mission requirements and a concept of operation for the mission from level 1 requirements. MCR deliverable: Preliminary Mission Requirements Document MCR deliverable: Preliminary Mission Operations Concept Document Iterate Mission Design Robust Baseline Mission Design. Include descope options, cost, & schedule MCR deliverable: Mission Concept Report, Schedule, Cost Analysis No Technology Maturity, Risk Assessment & Mitigation Assess technology maturity and develop a risk assessment & mitigation approach. MCR deliverable: Technology Maturity, Risk Assessment & Mitigation Document Initial concept complete? Yes Mission Concept Review (MCR) – Must pass this review to move from the Pre-Phase A phase (i.e., Concept Studies) into Phase A (i.e., Concept and Technology Development)

MCR Deliverables Level 1 Requirements Systems Drivers, strawman needed to start mission analysis Preliminary Mission Requirements Document Preliminary Mission Operations Concept Document System Driven & Programmatic, mission analysis needed to develop these Technology Maturity, Risk Assessment & Mitigation Mission Acquisition Approach Formulation Authorization Document (FAD) required to enter phase A Cost Analysis Internal and External to Project Work Breakdown Structure Schedule Full Project Lifecycle Schedule Detailed Phase A Schedule Other documents required Architecture & System Concept Report Mission Concept Report Institutional Capabilities V&V draft for risk reduction Draft Project Plan Systems Engineering Management Plan MCR Presentation Package Draft Configuration Management Plan

CLARREO Mission WBS WBS 1.0 WBS 2.0 WBS 3.0 WBS 4.0 WBS 5.0 WBS 6.0 Project Management WBS 2.0 Systems Engineering WBS 3.0 Safety & Mission Assurance WBS 4.0 Science WBS 5.0 Payload WBS 6.0 Spacecraft WBS 7.0 Mission Operations WBS 8.0 Launch Systems WBS 9.0 Ground Systems WBS 10.0 Systems Integration and Test WBS 11.0 Education & Public Outreach WBS 1.1 Project Mgmt WBS 2.1 Requiret’s Devel. & Mgmt. WBS 3.1 Safety & Mission Assurance Mgmt WBS 4.1 Science Mgmt WBS 5.1 Payload Mgmt WBS 6.1 Spacecraft Mgmt WBS 7.1 Mission Operations Mgmt WBS 8.1 Launch Mgmt WBS 9.1 Ground Systems Mgmt WBS 10.1 Payload to Spacecraft Integration WBS 4.2 Science Team WBS 1.2 Business Mgmt WBS 5.2 Payload System Engineering WBS 6.2 Spacecraft WBS 7.2 Spacecraft Operations WBS 8.2 Launch Vehicle WBS 9.2 Ground Stations WBS 10.2 Spacecraft to Launch Vehicle Integration WBS 2,2 Risk Mgmt WBS 3.2 System Safety WBS 6.2.1 Spacecraft SE WBS 4.3 Measure-ment Validation WBS 1.3 Project Planning & Schedule Mgmt WBS 7.3 Instrument Operations WBS 8.2.1 SE WBS 3.3 Reliability Engineering WBS 5.3 Payload WBS 9.12.1 Spacecraft Commanding WBS 2,3 Configura-tion Mgmt WBS 6.2.2 Structural WBS 8.2.2 Interfaces WBS 7.4 Data Processing WBS 3.4 EEE Parts Engineering WBS 4.4 Climate Modeling WBS 5.3.1 Solar Spectro-meter WBS 1.4 Project Reviews WBS 6.2.3 C&DH WBS 8.3 Launch Services WBS 9.2.2 Data Relay WBS 2.4 Trade Study Mgmt WBS 3.5 Quality Assurance Engineering WBS 1.5 Facilities WBS 4.5 Science Data Support WBS 5.3.2 Far IR Spectro-meter WBS 6.2.4 Power WBS 9.3 Communications WBS 6.2.4.1 Battery WBS 1.6 Travel WBS 2.5 Interfaces WBS 9.4 Ops Centers WBS 3.6 Materials & Processes Assurance WBS 4.6 Operational Support WBS 5.3.3 GPS Instrument WBS 6.2.4.2 Solar Arrays WBS 2,6 Contamination Control WBS 3.7 Contamina-tion Control Assurance WBS 6.2.4.3 Charging & Distribution WBS 4.7 Instrument Modeling WBS 5.3.4 IR Spectro-meter WBS 6.2.5 Thermal WBS 2.7 Materials & Processes WBS 3.8 Software IV&V WBS 6.2.6 Communications WBS 6.2.9 Pyro/ Release WBS 6.2.7 Attitude Control, etc. WBS 3.9 Mission Operations Assurance WBS 6.2.7.1 Attitude Control WBS 6.2.8 Interfaces WBS 6.2.7.2 Propulsion

CLARREO Systems Engineering Chart Project Systems Engineer Michelle Garn Consultant John Rogers SE Deliverables Management Rick Walker Flight Systems Integration Craig Jones Mission Design & Analysis Paul Speth Operational Concepts Steve Hall Payload Interface Management Dave Johnson Requirements Management Definition, flow down, tracking Requirement mgt tool Level 1 Requirements Doc Mission Requirements Doc Configuration Management CM tool, processes, plan Schedule Development Project full life cycle Detailed phase A plan Science Trade Study Mgt Tracking current studies Identifying gaps Technical Resource Mgt Margins mgt Technology Readiness FAD SEMP Project Plan Mission Acquisition Report WBS V&V Monitor ICD Development & Control Launch Vehicle Interface Spacecraft Bus Interface Mission Ops Interface Ground Systems Interface Software Mission Concept Development Identifying trades Initial analysis (small team) Developing Engineering Data Request Matrix Developing Engineering Trade Matrix Cost Analysis Sub-systems being staffed Orbital Mechanics Thermal Comm & Data Optical Structural Mechanical Power Avionics Electronics Software S/C Interfaces Propulsion Requirements Instrument requirements Science baseline mission focused on inter-calibration Science baseline mission focused on benchmarking Demonstration mission Ground Systems Mission Operations Developing traceability between on-going trade studies and mission parameter requirements GPS RO Solar Reflected Spectrometer Near-IR to Mid-IR Spectrometer Mid-IR to Far-IR Spectrometer 11

Defining Engineering Space: Mission Trades Number of satellites and orbit selection Benchmark and/or inter-calibration Diurnal cycle and/or orbital overlap for inter-calibration Instrument redundancy Spacecraft pointing versus nadir only Spectral range and resolution Spatial and temporal sampling requirements Footprint size GPS requirements Validation approach (i.e., aircraft, other satellites, balloons, redundant instruments) Level of international partnering Scope of mission (i.e., demonstration versus operational mission)

Mission Trade Space Considerations Mission Lifetime Benchmark, Inter-calibration Or Hybrid Spacecraft Instrument Suite and Redundancy Diurnal Sampling or Orbital Overlap Pointing requirement responsibility Spacecraft Subsystem Redundancy Number of spacecraft On-orbit operation & duty cycle Spacecraft Operations & Mission Implementation Each variation of the top-level science implementation trades will flow into concurrent subsystem designs to characterize the overall trade space. Attitude Mode Stabilization Method Component Sizing CPU Throughput Data storage Instrument interfaces TLM/CMD Frequency TLM/CMD Ground Support Modulation/ Encoding Passive vs. Active Payload Thermal Interfaces Thermal Biasing Array structure Array articulation Cell and Battery Sizing Payload location / interfaces Boom complexity Meet thermal, viewing, and stiffness requirement Fuel system config Fuel and Engine trades Tank sizing for max prop load

Define Engineering Space Parallel Engineering Path Define engineering space while science studies are underway Utilize System Analysis Tools and Integrated Design Tools to efficiently study multiple mission concepts Engineering in parallel – develop concept and key trades to get cost by March 2009 Expect Level 1 Requirements by April 2009 – narrow the trade space Conduct traditional integrated design sessions to refine mission until MCR Generate cost and technical assessment of mission concepts to support results of science trade results expected in Spring 2009 Balance the equation Add cost, risk, and feasibility to discussions of science objectives Sampling discussion: cost of additional spacecraft and launch, launch vehicle options Solar and Infrared on same spacecraft: TRL assessment, mass, launch vehicle, cost Field of View: mass and cost impact of 13Km FOV vs. 100Km FOV, Crosstrack scanning: mass, power, cost, performance of scanner Instrument Redundancy: cost of additional instruments Baseline a mission concept with respect to NASA Standards and Expectations Certified Launch Vehicles Parametric and Grassroots cost estimation Develop descope options to baseline concept Close cooperation with Earth Science Systematic Mission Program Office Leverage lessons learned from SMAP and ICESAT-II Healthy tension

Fix Prelim Results Final Results

Integrated Systems Engineering Team Complex mission Climate is complex Multiple instruments: solar, infrared, far-infrared and GPS Not a process mission Strong tie to standards and metrology Realize Expertise in Climate Community Consider Options that Reduce Mission Risk Build a diverse and deep systems engineering team that encompasses instrumentation, on-ground calibration, on-orbit calibration, and level 1 processing With consideration that some of the instruments and key subsystems will be selected through competitive process

What We Need from Science Team What Engineering Team needs from Science team Need rationale for key mission drivers: Orbit determination – which orbit and how many? Instrumentation: Solar, infrared and GPS on same spacecraft? Field of view: zonal, regional, or global; facilitate attribution; facilitate validation; facilitate cross-calibration and benchmark Inter-calibration concept, radiance benchmark concept, or both? Crosstrack: nadir view only sufficient? Spectral resolution: not as much of a driver at this stage (assuming >0.5 cm-1) Detector noise performance: identify technology drivers & cyrocooler impact Level 1 Science requirements Incorporate: “Better is the evil of good enough” philosophy Aiming for 80% solution Ability to form to a consensus Willingness to compromise Recognition that continued debate will likely delay mission Do we have a team that is interested in the mission, even at the cost of their particular interest? Will issues be discussed with rationale tied to the mission science goals? Studies with a focused approach Answer a question that drives mission parameter