Chapter 11 Managing Capacity and Demand

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

McGraw-Hill © 2000 The McGraw-Hill Companies 1 S M S M McGraw-Hill © 2000 The McGraw-Hill Companies Chapter 14 MANAGING DEMAND AND CAPACITY.
Managing Capacity.
4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Managing Demand and Capacity
Chapter 13 Capacity and Aggregate Planning. Aggregate Production Planning (APP) Matches market demand to company resources Matches market demand to company.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
IES 371 Engineering Management Chapter 14: Aggregate Planning
Operations Management Aggregate Planning Chapter 13
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
6 | 1 Copyright © Cengage Learning. All rights reserved. Independent Demand Inventory Materials Management OPS 370.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Pricing and Revenue Management in a Supply Chain
Managing Capacity and Demand Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Sales and Capacity Planning
MANAGING DEMAND AND CAPACITY Donna J. Hill, Ph.D. Fall 2000.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management.
Managing Capacity and Demand McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Managing Capacity and Demand
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
ISM 270 Service Engineering and Management Lecture 7: Forecasting and Managing Service Capacity.
Managing Capacity and Demand Chapter - 12
Yield/revenue management and a dynamic price model
Yield Management Chapter 9.
OPSM 405 Service Management
Airline Revenue Management
Transfer Pricing Chapter 15 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 10. Resource Allocation
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Pricing and Revenue Management in a Supply Chain
Strategic Positioning
MKT 346: Marketing of Services Dr. Houston Chapter 9: Balancing Demand Against Productive Capacity.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
ISM 270 Service Engineering and Management Lecture 7: Forecasting and Managing Service Capacity.
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
1 Chapter 14 Managing Capacity and Demand 1 Chapter 14 MANAGING CAPACITY AND DEMAND McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights.
Managing Demand and Capacity
Service and Relationship Marketing Module:3 Chapter 9- Managing Capacity and Demand.
DO NOT COPY Chapter 10 Capacity Management in service operations.
“MANAGING DEMAND & CAPACITY AND WAITING LINE STRATEGIES”
Balancing Demand and Capacity
Managing Supply and Demand. Strategies for Matching Supply and Demand for Services DEMAND STRATEGIES Partitioning demand Developing complementary services.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Managing Capacity and Demand. Airlines miss out on revenue if the seats are not filled. The railways lose money if trains have empty seats. Similarly,
Chapter 9: Balancing Demand and Productive Capacity.
MANAGING DEMAND AND CAPACITY. Capacity is usually constant whereas demand usually fluctuates. Fluctuations could be due to various reasons, predictable.
Copyright ©2016 Cengage Learning. All Rights Reserved
Managing Service operation. Strategies for Matching Capacity and Demand for Services MANAGING DEMAND Partitioning demand Developing complementary services.
1-1 Human Resource Management Gaining a Competitive Advantage Chapter 2 Strategic Human Resource Management McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin ©2003. The McGraw-Hill Companies. All Rights Reserved Chapter 14 Managing Demand and Capacity The Underlying Issue: Lack of Inventory.
MANAGING DEMAND AND CAPACITY Chapter 15. Objectives Explain the underlying issue for capacity-constrained services: lack of inventory capability Present.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
CH 12 Managing Capacity and Demand
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Sales and Operations Planning
Chapter 11 Managing Capacity and Demand
Managing Capacity and Demand
Beni Asllani University of Tennessee at Chattanooga
Sales and Operations Planning
Chapter 9: Balancing Demand and Productive Capacity.
Chapter 9: Balancing Demand and Productive Capacity.
Balancing Demand and Capacity
Aggregate Production Planning (APP)
Presentation transcript:

Chapter 11 Managing Capacity and Demand McGraw-Hill/Irwin Service Management: Operations, Strategy, and Information Technology, 6e Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved.

Learning Objectives Describe the strategies for matching capacity and demand for services. Recommend an overbooking strategy. Use Linear Programming to prepare a weekly workshift schedule. Prepare a work schedule for part-time employees. Explain what yield management is and how it is applied. 11-2

Level Capacity and Chase Demand Strategic Dimension Level Capacity Chase Demand Customer Waiting Generally Low Moderate Employee Utilization High Labor-skill Level Low Labor Turnover Training Required per Employee Working Conditions Pleasant Hectic Supervision Required Forecasting Long-run Short-run 11-3

Strategies for Matching Capacity and Demand for Services MANAGING DEMAND MANAGING CAPACITY Partitioning demand Increasing customer participation Developing complementary services Sharing capacity Establishing price incentives Scheduling work shifts Cross- training employees Developing reservation systems Creating adjustable capacity Promoting off-peak demand Using part-time employees Yield management 11-4

Customer-induced Variability Arrival: customer arrivals are independent decisions not evenly spaced. Capability: level of knowledge and skills vary resulting in some hand-holding. Request: uneven service times result from unique demands. Effort: level of commitment to coproduction or self-service varies. Subjective Preference: personal preferences introduce unpredictability. 11-5

Segmenting Demand at a Health Clinic Smoothing Demand by Appointment Scheduling Day Appointments Monday 84 Tuesday 89 Wednesday 124 Thursday 129 Friday 114 11-6

Discriminatory Pricing for Camping Experience No. of Daily Type Days and weeks of camping season Days Fee 1 Saturdays and Sundays of weeks 10 to 15, plus 14 $6.00 Dominion Day and civic holidays 2 Saturdays and Sundays of weeks 3 to 9 and 15 to 19, 23 2.50 plus Victoria Day 3 Fridays of weeks 3 to 15, plus all other days of weeks 43 0.50 9 to 15 that are not in experience type 1 or 2 4 Rest of camping season 78 free EXISTING REVENUE VS PROJECTED REVENUE FROM DISCRIMINATORY PRICING Existing flat fee of $2.50 Discriminatory fee Experience Campsites Campsites Type occupied Revenue occupied (est.) Revenue 1 5.891 $14,727 5,000 $30,000 2 8,978 22,445 8,500 21,250 3 6,129 15,322 15,500 7.750 4 4,979 12,447 …. …. Total 25,977 $ 64,941 29,000 $59,000 11-7

Hotel Overbooking Loss Table Number of Reservations Overbooked No- Prob- shows ability 0 1 2 3 4 5 6 7 8 9 0 .07 0 100 200 300 400 500 600 700 800 900 1 .19 40 0 100 200 300 400 500 600 700 800 2 .22 80 40 0 100 200 300 400 500 600 700 3 .16 120 80 40 0 100 200 300 400 500 600 4 .12 160 120 80 40 0 100 200 300 400 500 5 .10 200 160 120 80 40 0 100 200 300 400 6 .07 240 200 160 120 80 40 0 100 200 300 7 .04 280 240 200 160 120 80 40 0 100 200 8 .02 320 280 240 200 160 120 80 40 0 100 9 .01 360 320 280 240 200 160 120 80 40 0 Expected loss, $ 121.60 91.40 87.80 115.00 164.60 231.00 311.40 401.60 497.40 560.00 11-8

Yield Management Using the Critical Fractile Model Where x = seats reserved for full-fare passengers d = demand for full-fare tickets p = proportion of economizing (discount) passengers Cu = lost revenue associated with reserving one too few seats at full fare (underestimating demand). The lost opportunity is the difference between the fares (F-D) assuming a passenger, willing to pay full-fare (F), purchased a seat at the discount (D) price. Co = cost of reserving one to many seats for sale at full-fare (overestimating demand). Assume the empty full-fare seat would have been sold at the discount price. However, Co takes on two values, depending on the buying behavior of the passenger who would have purchased the seat if not reserved for full-fare. if an economizing passenger if a full fare passenger (marginal gain) Expected value of Co = pD-(1-p)(F-D) = pF - (F-D) 11-9

Daily Scheduling of Telephone Operator Workshifts Topline profile Scheduler program assigns tours so that the number of operators present each half hour adds up to the number required Tour 12 2 4 6 8 10 12 2 4 6 8 10 12 12 2 4 6 8 10 12 2 4 6 8 10 12 11-10

LP Model for Weekly Workshift Schedule with Two Days-off Constraint Schedule matrix, x = day off Nurse Su M Tu W Th F Sa 1 x x … … … … ... 2 … x x … … … … 3 … ... x x … … … 4 … ... x x … … … 5 … … … … x x … 6 … … … … x x … 7 … … … … x x … 8 x … … … … … x Total 6 6 5 6 5 5 7 Required 3 6 5 6 5 5 5 Excess 3 0 0 0 0 0 2 11-11

Scheduling Part-time Bank Tellers Decreasing part-time teller demand histogram Tellers required 5 4 4 0 1 2 3 4 5 6 7 Tellers required 3 3 0 1 2 3 4 5 2 2 1 Two Full-time Tellers 1 1 5 2 Fri. Mon. Wed. Thurs Tues. Mon. Tues. Wed. Thurs. Fri. DAILY PART-TIME WORK SCHEDULE, X=workday Teller Mon. Tues. Wed. Thurs. Fri. 1 x …. x …. x 2 x …. …. x x 3,4 x …. …. …. x 5 …. …. x …. x 11-12

Ideal Characteristics for Yield Management Relatively Fixed Capacity Ability to Segment Markets Perishable Inventory Product Sold in Advance Fluctuating Demand Low Marginal Sales Cost and High Capacity Change Cost 11-13

Seasonal Allocation of Rooms by Service Class for Resort Hotel First class Standard Budget 20% 20% 20% 30% 50% 30% 50% 60% Percentage of capacity allocated to different service classes 50% 30% 30% 10% Peak Shoulder Off-peak Shoulder (30%) (20%) (40%) (10%) Summer Fall Winter Spring Percentage of capacity allocated to different seasons 11-14

Demand Control Chart for a Hotel Expected Reservation Accumulation 2 standard deviation control limits 11-15

Topics for Discussion What organizational problems can arise from the use of part-time employees? How can computer-based reservation systems increase service capacity utilization? What possible dangers are associated with developing complementary services? Will the widespread use of yield management eventually erode the concept of fixed prices? 11-16