Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.

Slides:



Advertisements
Similar presentations
Small Purchases and Pricing December FAR Part 13 Simplified Acquisition Procedures Describes Policies and Procedures for acquisitions that do not.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
DME PANEL CONTRACTS John Fisher Program Manager – Procurement.
Session 8 Implementing PPPs
Presented by: Kathryn Hodges, NH
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Identifying and Selecting Projects
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Marcy Mealy Procurement Specialist CDBG Program
The Threshold Has Changed: Now What Should I do? Presented by Jan Giffin, CPPO, CPPB, VCO Procurement Management Account Executive, DGS/DPS.
Circular A-110 Everything You Didn’t Want to Know.
PUBLIC PROCUREMENT PROCESS
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Contract Financing Theresa A. Stevens March 12, 2007 Part 2 Non-Commercial Item Purchase Financing FAR Subpart 32.1 PIP Level II Presentation.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
ZHRC/HTI Financial Management Training
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
INTRODUCTION TO PUBLIC PROCUREMENT
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Required Sources of Supplies and Service
1 Department of Education Race to the Top Assessment Program Procurement Strategy Discussion Dr. Allan V. Burman President Jefferson Solutions
MASTERING THE RFQ PROCESS Genanne Wilson, DJJStu Potlock, DMS Gina Gibson, STOBill Zimmerman, DOHVonnie Allen, AWI Department of Management Services Division.
1 ROLES, RESPONSIBILITIES, AND TIMELINES FOR CONTRACTING ADMINISTRATIVE GUIDELINE NUMBER 3 Harpers Ferry Center Office of Acquisition Management August.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
Describing Agency Needs
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
To teach specification preparation  the importance of well-prepared specifications in procurement  the different types of specifications  basic writing.
HOW TO DO BUSINESS WITH THE STATE OF SOUTH CAROLINA John R. Stevens, CPPB State Procurement Officer Procurement Services Division S.C. Budget & Control.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
GWAC Ordering Procedures Overview
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
COMPETITION REQUIREMENTS
Chapter 15 Public Supply Management McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights.
United Nations Procurement Division
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Based on Kotler Business Markets and Business Buyer Behavior Principles of Marketing.
1 Developing the Specification/ Statement of Work Susan Georgis Master Agreements & Contracts Ben Martin Procurement Engineering.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Public Procurement Reforms
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
Overview of Chapter 287, F.S., 60A-1, F.A.C., and Other Materials Related to Florida Purchasing Summer, 2008.
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Volusia County Purchasing & Contracts Division 2012 National Procurement Institute Achievement of Excellence in Procurement.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
Contracting with CMS and other Federal Agencies CMS Industry Day October 30, 2015 Anita Allen, Small Business Specialist and Claude Cable, SBA Procurement.
BEST PROCUREMENT PRACTICES AND REDRESSING THE MAJOR CONSTRAINT OF PROCUREMENT FOR EFFECTIVE RESEARCH WORK IMRAN CONTEH PROCUREMENT OFFICER, SLARI.
KENYA NATIONAL BUREAU OF STATISTICS
Guidelines for Simplified Acquisitions Keisha Eldridge March 7, 2007 Level I PIP Presentation.
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Chapter 23 Purchasing Section 23.1 The Role of the Buyer Section 23.2 The Purchasing Function Section 23.1 The Role of the Buyer Section 23.2 The Purchasing.
12.1 Plan Procurement: Introduction
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
FAR Part 2 - Definitions of Words and Terms
Harpers Ferry Center Office of Acquisition Management August 2010
Lockheed Martin Canada’s SMB Mentoring Program
“How We Do Business”.
DEFINING REQUIREMENTS (REV. 05/22/2008)
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Presented By Melissa Lee Assistant Purchasing Agent Tarrant County
A Pricing Perspective on Contract Cost/Price Analyst
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
Presentation transcript:

Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1

Procurement Goals Equity Integrity Efficiency 2

Procurement Goals Economy Transparency Delegation of authority Law of agency 3

Procurement Goals Non-discrimination Accountability Promotion of industry Social-economic objectives 4

Procurement Stages Gather information Identify the need Specifications and standards Review and authorize Source document prep and sourcing 5

Procurement Stages Review, evaluate, recommend Approval, award, issue contract Accept, certify, pay, report action, pay Post award activities 6

Solicitation Methods Small dollar/purchase card Emergency purchases Sole source/single source Request for quote (RFQ) Invitation for bids/to tender IFB/ITT 7

Solicitation Methods Request for proposals Request for expression of interest Reverse auction Invitation to negotiate (ITN) Request for supplier qualifications Notice of intent (NOI) 8

Solicitation Categories Products Professional services Technology and related systems Printing and reprographics Construction Capital and major equipment 9

Planning-Gathering Information Identifying trends Forecasting the need Devising a strategy 10

The Purchase Request Begins the cycle Identifies the need Assures funding is available 11

Review of Request For completeness For clarity Evaluate the existing supply Determine the potential to bundle Evaluate potential sources 12

Identifying The Need And Requirements Definition Surveying the market Initial cost analysis Make or buy cost analysis Leasing or renting 13

Requirements Definition What do we want to purchase? Who will be the reviewer? Why do we need the good or service? How will we structure the requirements definition? 14

Sources Of Suppliers Trade journals/associations Manufacturers registry Regional commerce directories Professional associations Internet research Sales persons Advertising Electronic posting 15

Suppliers List Should be up to date Grouped by commodity codes Include size of the company Evaluate past performance 16

Supplier Pre-qualification Must be fair and objective Stated by policy Kept updated 17

Advantages Of Pre-qualification Accelerate the selection process Prevents unnecessary solicitation cost Allows for receiving competitive and responsive solicitations 18

Disadvantages Of Pre- Qualification May exclude small or new businesses May be hard to maintain the listing as changes in products occur May limit competition 19

Determining the Sourcing Strategy Value of the acquisition Number of suppliers Amount of risk How good is the specification Time constraints 20

What Is a Specification? A specification is a purchase description It tells what the end product should look like or what it must do Provide a method of determining if the need is satisfied 21

Specifications Must Be accurate Clear Concise Unrestrictive Foster competition 22

Purpose of a Specification Identify the requirement Identify characteristics of performance or quality Enable responses to be evaluated equally Maximize competition 23

Types of Specifications Design Performance Combination Brand name or equal 24

Design Specifications Describes how the item to be procured is constructed or manufactured Often restrict competition Often expensive to prepare May limit innovation 25

Performance Specifications Also called functional specifications Describe what and how the product or service must execute the desired operation in order to achieve a specific result or outcome. 26

Performance Specifications Should allow for tolerances Determine the quality of the product/service Puts all the risk on the contractor 27

Combination A combination incorporates the features of both performance and design, also include brand names. 28

Brand Name or Approved Equal Identifies a product manufactured by a specific firm, includes make, model and specific product information, but allows for all other know brands of other manufacturers to be accepted. 29

Brand Name Are established through labeling and become industry standards Should be avoided unless the words or equal are used Should not be identified as the preferred product 30

Standardization Programs Result in fewer variety of items in large quantities being purchased Lower cost due to volume buying( item and admin cost) Reduce inventory Provide better inventory control 31

Sources of Standards Underwriters Laboratories(UL) Canadian Standard Association (CSA) American National Standards Institute(ANSI) American Society of Testing Materials(ASTM) 32

Writing Technical Specifications: Who? Purchasing/supply professional Requesting department Private consulting firm Quality control or testing agency 33

Sources of Specifications Suppliers and manufacturers Colleagues and governmental sources Professional associations Online resources Other sources 34

Specification Content Allow for maximum competition Be complete, concise and accurate Reference industry standards Not duplicate content Identify physical, functional or operation to be measured 35

What? Identify all exceptions Do not use abbreviations Use “ shall ” “ will ” or “ must ” to indicate mandatory provisions Use “ should ” or may ” for non-mandatory provisions 36

What? Use or equal with brand name State all measures Use figures and tables Illustrations, drawings, graphs if required 37

Statement of Work A statement of work is key to the service contract as the specification is to the product contract “ A good statement of work will outline the specific services the contractor is expected to perform ” 38

Statement of Work Nature and description of the project Background-history Objectives and purpose Public entity 39