Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A 0.01666 Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.

Slides:



Advertisements
Similar presentations
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Advertisements

BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
Don Blackburn Vice Chair
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
Bob Green Garland Power and Light
FREQUENCY CONTROL DURING BLACK START OPERATIONS
Unlocking value from existing utility assets NARUC Meeting – February 2012
PRESENTATION FREQUENCY CONTROL
Generator Governor Frequency Response Alert
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
POWER GENERATION TECHNOLOGIES
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Frequency Control Turbine Governor Droop NERC Requirement
EE 369 POWER SYSTEM ANALYSIS
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
ECE 576 – Power System Dynamics and Stability
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Frequency Response Standard. ERCOT Governor Droop.
Update to RMS January 14, MarkeTrak – Release 3 Release 3 was successfully migrated the weekend of December 13 th Stabilization period – Dec 13.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Negative Wholesale Power Prices: Why They Occur and What to Do about Them A Study of the German Power Market Maria Woodman, Student Economics Department,
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
Unit-Specific Bid Limits based on Modified Generic Cost.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
FREQUENCY-POWER CHARACTERISTICS OF SYNCHRONOUS GENERATOR
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
GENERAL BACKGROUND AND SPEED GOVERNORS
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Final Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG March 26th, 2014.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
Responsive Reserve Service Deliverability Review September 15,
Math Review 4 th Grade. Dates There are 52 weeks in one year. There are 365 days in one year. January, March, May, July, August, October, and December.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Droop Calculator and Unit Performance Evaluation SAR-003-TRE-001 March 31, 2009 Sydney Niemeyer.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Using the Trapezoidal Model to Derate NW Hydro Capacity Resource Adequacy Technical Committee July 25, 2007 Portland, Oregon.
ECE 576 – Power System Dynamics and Stability
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Verifiable Cost Working Group (VCWG) Update
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Compliance Report to ERCOT TAC February 2007
Experiences with Wind Plants and Stability Studies in Isolated Systems
ECEN 667 Power System Stability
ECEN 667 Power System Stability
Presentation transcript:

Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A 0.01666 Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared to a 0.036 Hz Deadband with a “Step” Straight Line Proportional 5% Droop Curve from the Deadband Sydney Niemeyer, NRG February 9, 2010

Governor Settings Prior to November 2008 2008 Had Ten Months of Operation with no Governor setting changes. ERCOT Operating Guides called for a maximum +/-0.036 Hz deadband on Governors. 5% Droop Setting with no clarification as to implementation. With or without a step function at the deadband. To meet the 5% droop performance, Governors were encouraged to “step” into the 5% droop curve at the deadband.

Governor Settings After November 3, 2008 Deadbands were decreased to +/-0.0166 Hz (1 rpm on a 3600 rpm turbine). The Droop curve implemented was a straight line proportional curve from the deadband eliminating any “step” function. Initially only 4 Unit’s Governors were changed. Total Capacity of 2486 MW or approximately 82.8 MW/0.1 Hz of Primary Frequency Response. The coordinated Boiler Control System implemented the same Droop curve and deadband as the turbine Governor. Additional Units changed their Governor settings throughout 2009 and 2010, mostly after July 2009.

Status as of February 1, 2010 Units with Governors presently set with an intentional deadband less than or equal to +/-0.01666 Hz and droop curve with no step function. 11,607 MW Total Capacity Identified by PDCWG members. 1690 MW Lignite 4139 MW Coal 3620 MW Combustion Turbine Combined Cycle 1519 MW Combustion Turbine Simple Cycle 399 MW Steam Turbine – natural gas fired 240 MW Hydro

MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations During The First 10 Months of 2008 This compares the difference a single 600 MW unit would have experienced as a result of Primary Frequency Response if on-line the first 10 months of 2008 and had margin to move. Minute

MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations in 2008 This compares the difference a single 600 MW unit would have experienced as a result of Primary Frequency Response if on-line all of 2008 and had margin to move. Minute

MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations in 2009 The MW response of the 0.036 db unit decreased 216330.0 MW in 2009 from 2008. This is a 32.645% decrease in movement. The MW response of the 0.0166 db unit decreased 201124.4 MW in 2009 from 2008. This is a 22.518% decrease in movement. However, the 692039.8 MW Response of the 0.0166 db unit is only 29465.8 MW more than the 2008 MW Response of the 0.036 db unit (662574.0 MW). A 4.45% increase with the benefit of the improved frequency profile. Minute

ERCOT Frequency Profile 2008 and 2009 2009 Frequency Profile more “Normal” than 2008. Note: 2008 had two months of operation at the lower governor deadband settings (Nov & Dec).

ERCOT Frequency Profile Had Additional Improvement in December 2009 and January 2010

MW-Minute Primary Frequency Response of a 600 MW Unit To All Frequency Deviations During January 2010

Conclusions Clearly the MW-Minute Movement of a Unit with a lower deadband setting is more than that of a larger deadband. The MW-Minute movement of the lower deadband has a gradual injection of Primary Frequency Response compared to the “step” implementation of the larger deadband. Better Unit stability Better Frequency stability As more Units implement the lower deadband and non-”step” droop curve, the frequency profile improves and the total MW-Minute movement of the grid decreases.