Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Proposal For Improvement to the Current ICAP Market Markets Committee October 12, 2004 Ken Bekman Con Edison Energy.
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Better Align Capacity Markets with Policy/Planning Objectives James Daly, VP Energy Supply Restructuring Roundtable Sept 21, 2012.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Resource Adequacy in PJM
Reliability Risks and Lessons Learned In The Wake Of The Polar Vortex OPSI Annual Meeting October 14, 2014.
Topics The Midwest ISO The Midwest Market Market Design Process
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Robert G. Ethier, Ph.D. Director, Market Monitoring May 4, 2005 ISO New England State of the Market Report 2004.
LTTR, FCM, RPM, MRTU: Do More Acronyms Mean Better RTO Markets? An Overview of Various RTO Capacity Constructs and their Impact on Load.
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
The Continuing Evolution of U.S. Electricity Markets
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Reliability Pricing Model (RPM) Overview Andrew Ott PJM Senior Vice President, Markets.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Competitive Wholesale Power Market: Capacity Market
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 Market Evolution Program Regulatory Affairs Standing Committee Meeting September 11, 2003.
EPSA REGULATORY AFFAIR CONFERENCE 2006 Washington, DC October 25, 2006 Garry Brown Vice President, External Affairs New York ISO.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Bulk Power Transmission System
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Distributed Generation/Demand Resources in ISO New England’s Wholesale Markets 2nd Annual Distributed Energy Conference - Building Resilient Communities.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Demand Response as Capacity in New York National Association of Regulatory Utility Commissioners Winter Committee Meetings Washington, DC February 17,
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
What Was Learned From the 2015 Transition and Base Residual Auction Results? October 13, 2015 OPSI Annual Meeting CP Auction results – A DR perspective.
S PIEGEL & M C D IARMID New England’s Forward Capacity Market: How Did We Get Here and Where Are We Going? Scott H. Strauss APPA Legal Seminar Cambridge,
FERC Staff’s Report on Demand Response and Advanced Metering.
Illinois Wholesale Market Update December 10, 2003.
Texas Nodal Team Cost Benefit Group Background to Standard Market Design in New England March 2, 2004 Michael Taniwha Manager, Market Administration ISO.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Electricity Wholesale Markets: Designs for a low-carbon future
The Future of Demand Response in New England
Michael I. Henderson ISO New England Inc.
Benefits of New England’s Proposed Capacity Market
New England Resource Adequacy
Long-term Capacity Market
Changes to New England’s Forward Capacity Market 120th New England Electricity Restructuring Roundtable Paul Roberti* Commissioner, RIPUC Boston,
Locational ICAP in New England
Market Design in New England
Why the Electricity Markets Do Not Work
Alternative ICAP Proposal
What Does the Recent LICAP Settlement Mean for New England?
Presentation transcript:

Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy and Analysis

Presentation Title © 2007 ISO New England Inc. 2 The Need for Capacity Markets To provide long-term financial commitment to obtain adequate resources to meet customers’ needs –To attract new investments in generation capacity and demand resources –To defer old capacity retirement Electricity markets continue to evolve –Demand side does not yet fully participate –Price cap is still needed

Capacity Markets in the U.S. ISO New England –Forward Capacity Market (FCM) PJM ISO/RTO –Reliability Pricing Model (RPM) New York ISO –Installed Capacity Market (ICAP) © 2008 ISO New England Inc. 3

The Forward Capacity Market (FCM) at ISO New England

The Forward Capacity Market (FCM) in New England © 2007 ISO New England Inc. 5 Background Historically, New England has had a monthly Installed Capacity (ICAP) market –Very low prices –Many Reliability Must Run (RMR) contracts ISO developed Locational ICAP (LICAP) States and some stakeholders objected Result was settlement process which led to FCM –Settlement reached March 2006

Transition Payments DatePayment ($/KW-month) Estimated Total Payment ($Billion) 12/01/2006 – 05/31/2007$ /01/2007 – 05/31/2008$ /01/2008 – 05/31/2009$ /01/2009 – 05/31/2010$ © 2008 ISO New England Inc. 6 Effective December 2006 through May 2010 Fixed capacity payments to all resources Payments adjusted for historical unit availability

The Forward Capacity Market (FCM) in New England © 2007 ISO New England Inc. 7 FCM – Design Features Primary auction for capacity approximately three years before the delivery year Allow new proposed capacity projects to compete in the market and set price Facilitate participation by all resources: supply and demand Market buys just enough capacity to meet New England’s Installed Capacity Requirement (ICR) Zonal purchases Pay-for-performance and energy price hedge for load

The Forward Capacity Market (FCM) in New England © 2007 ISO New England Inc. 8 FCM Design – Major Components Qualification –Ensure that auction participants are real –For both existing and new capacity resources Forward Capacity Auction (FCA) –Zonal purchase of capacity resources –Declining clock auction Reconfiguration Auctions –To buy and sell (exchange) capacity obligations before and during the commitment period Capacity Product –Must offer in day-ahead energy market –Measure and pay-for-performance during shortage events –Financial obligation to provide energy during high priced periods Financial Assurance –Help to ensure that New capacity offers deliver on commitment

Forward Capacity Market Results Capacity market transition payments of $3.05/kW-month were made to all ICAP resources in accordance with the FCM Settlement Agreement The ISO evaluated over 13,000 MW of new capacity projects submitted in the qualification stage for the first Forward Capacity Auction The first FCA was successfully completed in February 2008 with competitive offers from 6,102 MW. A total of approximately 1,813 MW of new resources was selected © 2008 ISO New England Inc. 9

10 Forward Capacity Auction Results The first FCA held February 4-6, 2008 –Procurement met regional ICR for Commitment Period –FCA was successful and went smoothly No technical problems or observed anti-competitive behavior Prices –FCA starting price was $15.00/kW-mo –FCA ending price was $4.50/kW-mo Floor price negotiated as part of Settlement Agreement Over 1,800 MW of new Supply and Demand Resources cleared the auction,

© 2008 ISO New England Inc. 11 Total Resources Cleared in FCA-1: 34,352 MW; Total Resources Needed: 32,305 MW Values represent MW and percent

© 2008 ISO New England Inc. 12 New Supply Resources Cleared in FCA-1: Traditional fuel still dominates supply Total: 626 MW Values represent MW and %

© 2008 ISO New England Inc. 13 New Resource Show of Interest for FCA#2 in December, 2008 More Show-of-Interest (SOI) applications in FCA-2 than FCA-1 Approximately 15,864 MW of New Resources seeking qualification –8,985 MW of new generation Includes 581 MW of Wind, primarily in ME and NH Includes 8,046 MW of CC and CT Also includes Hydro, Fuel Cells –5,098 MW of new imports –1,781 MW of new Demand Resources

The Reliability Pricing Model (RPM) at PJM ISO/RTO

Background The RPM replaced the previous PJM capacity market construct to ensure PJM’s long term resource adequacy –It was implemented on June 1, 2007 The RPM design was developed through a multi-year stakeholder discussion and a FERC settlement process The primary driver was to address projected reliability concerns and infrastructure investment issues –PJM was facing the prospect of persistent and worsening imbalances between supply and demand Four auctions have been conducted so far © 2008 ISO New England Inc. 15

RPM- Design Features Three Year Forward Auctions –Residual auction after specification of self-supply and bilaterals. –Provides price signal and forward commitment process that allows new entry to participate or existing units to retire with forward notification. Locational Constraints –Recognize limited ability to import capacity in certain areas due to transmission, voltage, or stability limitations (as identified in PJM’s RTEP analysis). –Higher capacity prices in constrained areas –Lower capacity prices in areas with significant excess capacity © 2008 ISO New England Inc. 16

RPM- Design Features (Cont’d) Variable Resource Requirement (VRR) –Recognizes the Cost of New Entry. –Recognizes the value of additional capacity above the reserve margin thereby reducing volatility in capacity prices. –Sloped demand curve reduces market power concerns. Ability of Transmission and Demand Resources to participate –Allows direct competition between various options including new generation resources and demand response to address reliability requirements. –Provides opportunity for incremental transmission upgrades to provide solutions to capacity import limitations © 2008 ISO New England Inc. 17

Capacity Supply and Demand in the 20011/2012 Base Year Auction © 2008 ISO New England Inc. 18

Summary of RPM Clearing Prices © 2008 ISO New England Inc. 19

Trend of Demand Response Participation before and after RPM Implementation © 2008 ISO New England Inc. 20

The Installed Capacity Market (ICAP) at New York ISO

Background The design of the Northeastern installed capacity markets was born of the pre-existing planning and operating practices of the power pools in the Northeast. The New York market structure addresses the need for: –system reliability (insured through installed capacity requirements); –overall market design coordinating energy, capacity and ancillary services –reining in potential market power –encouraging robust competition –mitigating potential barriers to trade –certainty, market stability –recognizing the political realities of energy price caps and regulatory oversight © 2008 ISO New England Inc. 22

NYISO ICAP- Design Features ICAP Requirements: –Are based on a Reserve margin set in advance for the upcoming Capability Year by the New York State Reliability Council (NYSRC) All ICAP Requirements are translated into UCAP (Unforced Capacity) Requirements –Unforced Capacity is a measure of the expected supply based on the historical performance of each resource when in demand (dispatched) © 2008 ISO New England Inc. 23

NYISO ICAP- Design Features Load Serving Entities (LSEs) meet their NYISO-allocated UCAP requirements by: –Self-Supply or Bilateral Transactions with Suppliers –Purchasing in the Capability Period Auctions (6-month strip) –Purchasing in the Monthly Auctions (for balance of Capability Period) –Paying for the balance of their obligation procured on their behalf in the Spot Market Auction (1-month) using a Demand Curve All supply is certified and checked out monthly. © 2008 ISO New England Inc. 24

NYISO ICAP- Locational Features Due to transmission constraints into certain localities, areas or zones, some LSE’s must procure a substantial portion of their ICAP/UCAP requirements from local resources There are two such transmission constrained zones in New York: –New York City –Long Island © 2008 ISO New England Inc. 25

NYISO ICAP “Demand Curve” Initially a monthly auction was designed as a deficiency auction where LSEs that were short were required to buy the balance needed at the clearing price in the NYISO deficiency auction The market price could be anywhere between a preset maximum deficiency price and zero, essentially following a vertical demand curve This design resulted in volatile market outcomes and eroded the quality of any price signals The deficiency auction is replaced by a spot auction (one month) that relied on a sloped demand curve, which would lead to more certain and rational price signals © 2008 ISO New England Inc. 26

Questions?