MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

Daikin Altherma™ Troubling Shooting
HEAT PUMPS.
André Augustinus 16 June 2003 DCS Workshop Safety.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
Perform Control Test. Check for Consistent Liquid Temperatures Entering and Leaving Liquid Temperatures should be close when the water pumps are on but.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
Medical Gas Alarm Panels
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
CHE 185 – PROCESS CONTROL AND DYNAMICS DCS AND PLC FUNDAMENTALS.
SCADA and Telemetry Presented By:.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
1 Air Conditioning Pressure Switches. 2 High Pressure switch Used to protect the compressor When condensing temp gets too high Reads High Side Pressure.
Patrick Thornton, SNS/FPE June 9, 2008
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
 P&I Diagram  Gas Room Controls  Gas Panels Controls in the Hall  GUI  Oxygen Sensor Cart.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
CISSP Common Body of Knowledge Review by Alfred Ouyang is licensed under the Creative Commons Attribution-NonCommercial-ShareAlike 3.0 Unported License.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
LCD Wiring Diagram Presentation B / B.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
1 Liquid Hydrogen update CM33 S Watson P Warburton M Courthold.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
Purgers and Non-condensables “What are they and why should I care?” Refrigerating Specialties Division Parker Hannifin Corporation July 2004.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
S A Griffiths CM42 June 2015 Electrical & Control.
Brooks Expert Support Tool (BEST) Software
Hydrogen System Update
Liquid Hydrogen Infrastructure Update
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
LCLS-II 2K Cold Box Controls Design Review
Tracker cooling loop “check out” draft for discussion
SC1R Cold Box PDR Controls
Status of Hydrogen System Development
Charge 2. Equipment Protection 3. Definition and Documentation
November technical stop activities:
Presentation transcript:

MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab

Control System Functions Operate Valves Monitor - Temp Pressure, Flow & Vacuum Control - Vac Pumps, Heater Chiller & Cryo-Cooler Run Control Sequences Gas Detection System Extract System UPS

Control System P&ID

Control PLC Omron CJ1M Modular PLC with Ethernet Existing Software for Link to EPICS NS8 Programmable Terminal (HMI), 8.4 inch Touch Screen with Ethernet Key Switches on Selected Functions

Intrinsic Safety (Ex i) Limit energy in electrical circuits to less then the value required to ignite Hydrogen (20 micro 25%) All Circuits in the Gas Panel Temp & Level sensors in Cryostat Cryostat Heaters are protected by pressure interlock (SIL Rated)

Control System Valve air solenoids mounted on the outside of the Gas Panel Enclosure Valve limit switches are intrinsically safe and can detect short circuits and broken wires, Pressure transducers are 4-20mA giving broken wire detection. The PLC provides start / stop signals to pumps; manual control is also available. Note:- PLC status does not affect pump operation i.e. the pumps do not go off if the PLC does.

Gas Detection System Oliver Tocsin 920 All Detectors and Beacons paired on separate bus loops Warning at 25% LEL Alarm at 50% LEL Linked to Extraction System to increase speed on detection of leak Annual Testing / Maintenance by contractor

Extraction System Two Inverter controlled 7.5kW Fans mounted on the roof One fan on its own can providing the flow rate required to deal with a leak. (DSEAR rec = 450 air changes per hour). Differential Pressure Sw & Inverter Current feedback to prove operation Normal running at 100 ACH with increased speed on detection of leak

UPS 20kVA UPS - 2 Hour back up of Fans & Control System PLC, Heaters, Vac Gauges etc 50 min to boil off LH2 In Cryostat Annual Testing / Maintenance by contractor

Safety Functions & Interlocks Operation of the Ventilation System on Detection of a Hydrogen Leak – Hardwired Shut PV20 if there is a Pressure Rise in the Cryostat during operation Cryostat Insulation Vacuum Poisoning to boil off gas if heaters fail / can not be used A Shut-off Facility for the Hydride Bed Heater/Chiller on Detection of Bed Overpressure Cryocooler Shut-off if Temperature drops below Hydrogen Freezing Point (14k) or Heaters Faulty

Control Sequences Helium Purge Helium Supply Line Purge Helium Fill Helium Empty He Purge H2 Side Hydride Bed Charge Hydrogen Fill Hydrogen Empty Cryostat Vacuum Diagnostic / Test

Typical Sequence Screen Seq Start PB Valve Position Pump Control Plant Status Ind Pressure & Flow Readout Current Step Highlighted

Typical Data Log Screen Data Logging of Key Data Scroll Back 24H Files saved to Compact Flash Card Numeric Readout

Hydrogen Control Room Layout New Door (1 Hour Fire Rated) UPS Installed Gas Detection Installed Ready for H2 Testing

Questions