Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

NERC Policies Introduction
Reliability in the International Arena Alberta Perspective
WECC Delegation Agreement WECC Board of Directors Meeting December 7-8, 2006.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
PER
Compliance Application Notice Process Update and Discussion with NERC MRC.
August 14, 2003 Blackout Final Report
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
BS Information Systems – University of Redlands BS Information Systems – University of Redlands AS Electronic Technology AS Electronic Technology Project.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
CORPORATE COMPLIANCE Tim Timmons Vice President Compliance and Regulatory Services Health Future, LLC.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
NERC as the ERO Craig Lawrence Manager of Organization Registration, Certification, and Compliance Monitoring.
NERC Compliance Program Overview FRCC 2007 Compliance Workshop April 4 and 11, 2007.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Overview of WECC and Regulatory Structure
Status Report for Critical Infrastructure Protection Advisory Group
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
FRCC Regional Entity Webinar NERC Reliability Standard Development Projects and Situational Awareness and Event Analysis October 30, 2013, 1:00 p.m. –
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Reliability and the Market Place Perfect Together The Transition from NERC to NAERO Baltics Working Group June 6, 2001 Princeton, NJ The Transition from.
The Electric Reliability Organization NERC’s Proposal for a Strong and Effective ERO FRCC System Operator Seminar Spring 2006.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
1 Presented by David Thompson, TIA December 14, 2005 NFPA 1600 and Emergency Communications.
Overview of Tampa Electric’s Compliance Program APPA Reliability Standards and Compliance Program January 10, 2007.
NERC Reliability Readiness The Next Steps
Updated ERO Enterprise Guide for Internal Controls
WECC Regional Standards Update
NERC Cyber Security Standards Pre-Ballot Review
Background (history, process to date) Status of CANs
Impacts and Actions Resulting from the August 14, 2003 Blackout
The Electric Reliability Organization: Getting from here to there.
Standards Development Process
Presentation transcript:

Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO

Actions Affecting ERCOT Resulting From The Northeast Blackout NERC Near term actions – October, 2003 Six immediate Regional actions items from early blackout findings NERC Actions to prevent and mitigate the impacts of future cascading blackouts – February, 2004 Fourteen recommendations approved by the NERC Board NERC Actions to “crispen” its compliance templates - March Thirty-eight revised and new compliance templates US – Canada final blackout report recommendations – April Forty-six recommendations related to numerous entities

NERC Near Term Actions October, 2003 Immediate actions for the Regions to investigate and report the results to NERC – Letter from Mike Ghent 1.Voltage and reactive management 2.Reliability communications 3.Features of system monitoring and control systems 4.Emergency action plans 5.Training for emergencies 6.Vegetation management ERCOT reported to NERC that it was compliant with all of these requirements on December 5, 2003

NERC Actions To Prevent And Mitigate The Impacts Of Future Cascading Blackouts February 10, a – Each Regional Council shall report NERC compliance violations 2c – NERC committees shall review and update compliance templates 3a – All Reliability Coordinators and Control Areas shall be audited 4a – All bulk electric line trips resulting from vegetation shall be reported to the Regions and through the Regions to NERC 4c – Each transmission owner shall make available its vegetation management procedure 5a – Regions shall document completion of recommendations 6 – Certain operators shall receive 5 days of training by 6/30 8a – All transmission owner shall evaluate Zone 3 relays by 9/30 8b – Regions shall evaluate feasibility of under-voltage relays

NERC Actions To Prevent And Mitigate The Impacts Of Future Cascading Blackouts February 10, 2004 (Continued) 9 – The OC shall review the NERC Operating Policies for Reliability Coordinators and Control Areas 12a & b – Regions shall define regional criteria for synchronized recording devices and include GPS time synchronization 14 – Regions shall establish criteria for validating data used in power flow and dynamic modeling

NERC Actions To Prevent And Mitigate The Impacts Of Future Cascading Blackouts February 10, 2004 – Recommendation 2c The NERC committees shall review and update (“crispen”) the NERC compliance templates The CCMC reviewed all of the compliance templates and prepared drafts as needed to update and “crispen” them The CTTF was formed to finalize these revisions and present a full compliance template package to the NERC Board by 3/31/04 The Board approved the templates on 4/02 Entities will be required to have and follow –Vegetation management plans –Protective relay maintenance programs –Under-voltage relay scheme maintenance program –Special protection schemes maintenance program

NERC Actions To Prevent And Mitigate The Impacts Of Future Cascading Blackouts February 10, 2004 – Recommendation 9 9- Clarify Reliability Coordinator and Control Area Functions, Responsibilities, Capabilities and Authorities NERC Operating Policies 5, 6 and 9 were reviewed and clarified, where necessary, by the NERC RCWG and ORS groups The revisions were posted and reviewed by the NERC community They are being voted on by the ballot body at this time for adoption ERCOT was represented on these work groups and is already compliant with the revised requirements A “Best Practices” working group is now formed to review control system and training requirements

US – Canada Final Blackout Report Recommendations Make reliability standards mandatory – legislation – ERO - penalties Develop regulator approved funding for NERC and Regions Obtain independent review of an appropriate long term ERO structure Examine the future role of the Regions – scope – structure – etc Require any entity operating as a part of the bulk system to be a member of the Region in who’s footprint it is in Shield operators who initiate load shedding from liability Commission an independent study of the relationships among industry restructuring, competition and reliability Develop enforceable standards for vegetation management and penalties for failure to comply – PUCT

US – Canada Final Blackout Report Recommendations (continued) Strengthen NERC compliance – violation reporting and compliance audits – public release of results Strengthen NERC’s reliability readiness audit program – public reports Improve near and long term training – planners – operators – IT support personnel Make more effective and wider use of system protection measures Reevaluate NERC’s existing reliability standards development process and accelerate the adoption of enforceable standards Implement NERC IT standards – physical and cyber Provide NERC guidance on employee background checks Establish clear authority in corporations for physical and cyber security

?