Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.

Slides:



Advertisements
Similar presentations
Regulatory Framework and Emerging Issues Mahesh Vipradas.
Advertisements

1. Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2.
KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
Sharing of ISTS Charges & Losses Regulation
APPLICATION OF THE ERES SUPPORT MECHANISM IN ROMANIA Primary and Secondary Legislation 1.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Self Retention of RECs. REC Regulations- Self-Retention of RECs An RE Generator permitted to retain the certificates for offsetting its renewable purchase.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Trading of ESCerts on Power Exchanges.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
ABPS Infrastructure Advisory Private Limited REC Mechanism in Himachal Pradesh Utility Perspective Ajit Pandit Director, ABPS Infrastructure.
LIVE GREEN. DO RIGHT. Renewable Energy Certificates By: Gensol Consultants Pvt. Ltd.
Energy Markets 201 Tribal Solar Working Group April 30, 2015.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
©2008 PJM EIS Emissions Tracking in the Generation Attribute Tracking System (GATS) NJ RGGI Working Group Newark, NJ June 5, 2008.
MARKET OF GOVERNMENT SECURITIES IN BH Securities in the BH Financial Market – Preparation for Issuing of Government Securities Banja Vrućica, 18. May 2006.
Karnataka Renewable Energy Development Limited
Renewable Energy Certificate Mechanism
Grid Access Unit Small and Micro Generator frame-work key focus areas Date : 18 April 2013.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Renewable Energy Policies, Regulations, REC and RPO alka, assistant director, NPTI, PSTI, Bangalore June 2011.
Billing, Collection and Disbursement Procedures
Renewable Energy Credit (REC) Program ERCOT Retail 101.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Total Installed Capacity (as on ) Renewable contributes 5-6% of total Electricity Generation Source: Central Electricity Authority 2.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Economic Instruments for Climate Change Mitigation Tradable Renewable Energy Certificates Workshop at the 2009 Climate Change Summit.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
1 “RENEWABLE PURCHASE OBLIGATION (RPO), MAHARASHTRA” MAHARASHTRA ENERGY DEVELOPMENT AGENCY (MEDA) Presented by:- Dr. J. V. Torane General Manager (REC,
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
Understanding the Dynamics of Electricity Trade in the Philippines with the Entry of Retail Competition and Open Access.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Southern Regional Power Committee Central Electricity Authority.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
ERRA 4th Annual Conference May 19, Budapest, Hungary. Latvia Country Update UPDATE ON REGULATION Ainars Čunčulis Head of Energy Department Public.
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
STATE ENERGY REGULATORY COMMISSION (SERC) Prof. Konstantin Shushulov Chairman Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
AUSTRALIA’S RENEWABLE ENERGY CERTIFICATE SYSTEM David Rossiter Regulator, Office of the Renewable Energy Regulator Energy Efficiency Certificate Trading.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Renewable energy support schemes in the Republic of Moldova
Open Access Power Purchase
Incentives For Use Of Renewables
GEORGIAN ELECTRICITY MARKET OPERATOR
Operationalizing One Nation One Grid
Illinois Distributed generation Procurement program
Open Access.
Target Clients Renewable Energy Generators in India
Scheduling of Collective Transactions Through Power Exchange
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Overview of the Electricity Regulation Bill
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Analysis of Solar Power Market
bihar electricity regulatory commission
Photovoltaic Systems Engineering Application to PV Systems
Presentation transcript:

Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status

Chronology of Events – Concept to Implementation 12/10/20152 FOR initiated study to assess measures for increasing share of RE including Feasibility of Introducing REC Mechanism in India Jun’08 Hon’ble Prime Minister announced NAPCC recognizing Implementation of REC Mechanism as tool to promote RE Jun’08 MNRE engaged Consultant to Develop Conceptual Framework for REC Mechanism in India Aug’08 Central Electricity Regulatory Commission initiated process for Implementation of REC Mechanism in India Nov’09 CERC notified Regulations for Implementation of REC Framework Jan’10 CERC has issued Order on Forbearance and Floor Price after Public Consultation Process Jun’10 CERC Issued Order on Applicable Fee and Charges for Participating in REC Mechanism Sep’10 CERC approved Business Rules of Exchange Platform Feb’11 First Session of REC Trading Mar 30’11 CERC Designated National Load Despatch Centre as Nodal Agency under the REC Regulations Jan’10 Consultant submitted its recommendation to the Working Group on 'Policies on Renewables’ Sep’08 Consultant submitted its Exhaustive Report to MNRE on Conceptual Framework for REC Mechanism in India Jun’09 FOR has approved Model REC Regulations for adoption by SERCs Oct’09 CONCEPT TRANSACTION CERC has issued Order on Detailed Procedures for Implementation of REC Mechanism Jun’10

Status- RPO Regulations

BIO MASS HYDRO SOLAR RENEWABLE ENERGY BIO MASSGEO THERMAL SMALL HYDROWIND SOLAR BIO MASS Energy Generation GREEN ATTRIBUTE GREEN ATTRIBUTE ELECTRICITY RENEWABLE ENERGY CERTIFICATE SOLAR CERTIFICATE NON-SOLAR CERTIFICATE

CERC REC Regulation, 2010 – Conceptual Framework NLDC5 Electricity Component Electricity Component * Self consumption by CPPs based upon renewable generation are eligible for RECs RE Generation* Sale at Preferential Tariff Sale at Preferential Tariff REC Component Obligated Entities / Voluntary Buyers Obligated Entities / Voluntary Buyers Distribution Company / Third Party Sale/ Power Exchange Distribution Company / Third Party Sale/ Power Exchange Obligated Entities

RE Generator Trading 1 MWh Grid Connectivity Central Agency State Agency REC Salient Features of REC Mechanism

REC Framework: Eligibility Self Consumption/ Captive use Third party sale/Open Access PPA with Distribution Licensee No Promotional Wheeling No Promotional Banking No Electricity Duty Exempt Sale at Mutually Agreed Price PPA at Preferential Tariff PPA at Average Power Purchase Cost Eligible Not Eligible Eligible if All Three conditions mentioned above are met Grid Connected RE technology approved by MNRE

Entities involved to Operationalise REC Mechanism Central  Forum of Regulators  Central Electricity Regulatory Commission  Central Agency (National Load Despatch Centre)  Power Exchanges  Compliance Auditors State  State Electricity Regulatory Commission  State Load Despatch Centre  State Agencies  Eligible Entities  Obligated Entities

ACCREDITATION REGISTRATION ISSUANCE TRADE & REDEMPTION REC Procedures

NLDC10 Applicability & Scope Applicable to: RE Generators including CPPs RE source recognized and approved by MNRE SERCs to designate State Agencies Accreditation -six months prior to commissioning No PPA at Preferential Tariff In case of PPA After 3 years or expiry date of PPA whichever is earlier For CPPs No benefit in the form of: concessional/promotional transmission or wheeling charges, banking facility benefit and waiver of electricity duty Accreditation valid for five years.

Eligible Entity State Agency SLDC Verification Prior to Accreditation Application for Accreditation Confirmation of Accreditation Intimation of Accreditation 3a 3c 3b 1 2 Step Wise Schematic Description of Procedure for Accreditation Central Agency Application for availing Accreditation by Generating Co. to the Host SA Application shall contain details of Owner/Operator, Generating Station, Metering, Connectivity, Statutory, General, fees & charges, Declaration Separate Application for each RE Generation Project

NLDC12  NLDC designated as Central Agency.  The functions of Central Agency includes :  Registration of Eligible Entities  Issuance of Certificate  Maintaining and settling accounts in respect of the certificate  Repository of transactions of certificates and  Any other function incidental to the implementation of REC Mechanism  The NLDC to operationalise REC mechanism has developed various procedures.  Various activities in these procedures shall be undertaken in the electronic form to the extent feasible. Appointment of NLDC as Central Agency

Eligible Entity State Agency SLDC Power Exchange(s) Central Agency Verification Prior to Registration 2 Confirmation of Registration 3a Intimation of Registration 3b Intimation of Registration 3c Intimation of Registration 3d Schematic Description of Procedure for Registration Application for Registration 1 Information to be furnished by the applicant Owner Details, RE Generating Station details, Certificate of Accreditation Commissioning Schedule, Details of Fee & Charges, Declaration

NLDC14 Time Line Application accompanied with fees and charges Process of Registration Grant of Registration Furnishing the Central Agency requested details by the applicant Intimation regarding Incompleteness of application Payment of applicable registration Charges 2 days 7 days 15 days 3 Months

Schematic Description of Procedure for Issuance State Agency SLDC Distribution Licensee Distribution Licensee Eligible Entity Central Agency Central Agency Joint Meter Reading Application for Issuance Verification Pre-Condition Intimation of Meter Reading Regular Injection Report Intimation of Issuance Issuance of REC a 4b 4c 5a 5b

Schematic Description of Procedure for Redemption Obligated Entity / Buyer Obligated Entity / Buyer Eligible Entity Eligible Entity Power Exchange(s) Power Exchange(s) Offer for Sale 13:00 to 15:00 hrs 1a Bid for Purchase 13:00 to 15:00 1b Central Agency Central Agency Verification Conditions (By 15:30) Verification Conditions (By 15:30) 2 2 Confirmation Of REC validity & quantity (by 16:00) Confirmation Of REC validity & quantity (by 16:00) Central Agency Central Agency Intimation of Trade results For Extinguishing REC (By 17:00) 3 Market Clearance (Volume & Price) Reports 4

Home Page

Accreditation Details (As on ) Non SolarCapacity (MW)Number Wind Small Hydro5912 Bio Mass35230 Bio Fuel Cogeneration31829 Urban & Municipal Waste00 Total SolarCapacity (MW)Number Solar Thermal00 Solar PV00 Total00

Non SolarCapacity (MW)Number Wind Small Hydro5210 Bio Mass22420 Bio Fuel Cogeneration23021 Urban & Municipal Waste00 Total SolarCapacity (MW)Number Solar Thermal00 Solar PV00 Total00 Registration Details (As on )

Issuance & Trading Month, Year Opening Balance RECs Issued RECs Redeemed Closing balance March, April, May, June, July, August, Sept, Total

Power Exchange wise Trade Details Month IEX MCV ( RECs Traded) PXI MCV ( RECs Traded) Total Trade IEX MCP (Rs/ REC)PXI MCP (Rs/ REC) March, April, May, June, July, August, Sept,

Highlights Highest ‘Capacity’ Registered : 36 MW, Wind (Gujarat) (Gujarat Fluorochemicals Limited) Smallest ‘Capacity’ Registered: 0.35 MW, 8 Projects Average ‘Capacity’ Registered: 6.4 MW Total Registered Buyers: 454 Buyers ( 5 Voluntary Buyers)

Concerns of stakeholders Extension of applying period of REC from 3 months to 6 months Validity of RECs Periodicity of Compliance – Quarterly or Six monthly Floor/Forbearance Price – Longer visibility of 5 years

Concerns of stakeholders Long Term RPO Trajectory: For next 5 to 10 years Same RPO level across the country Strong Enforcement Mechanism CPP eligibility: Electricity Duty waiver Vintage based floor price for solar REC – Multiplier linked to reduction in floor price 24

Weblinks