WP8.3.2 Common infrastructure for facilities Sensor cooling at the Birmingham Irradiation Facility Maurice Glaser Frederico Ravotti Michael Moll Gianluigi.

Slides:



Advertisements
Similar presentations
M. Jones, A. Boston, M. Chartier, B. McGuirk, P. Nolan, R.D. Page, P. Pusa, D. Seddon, J. Thornhill, D. Wells and the ALPHA collaboration Department of.
Advertisements

Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
TYPES OF MECHANICAL SYSTEMS
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Trapping in silicon detectors G. Kramberger Jožef Stefan Institute, Ljubljana Slovenia G. Kramberger, Trapping in silicon detectors, Aug , 2006,
ATLAS Module building at Glasgow
Radiation Damage to Silicon Sensors DCC 11/14/02 DRAFT.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Irradiation Study of n-on-P Strip Sensors K. Hara, K. Inoue, A. Mochizuki (Univ. of Tsukuba) Y. Unno, S. Terada, T. Kohriki, Y. Ikegami (KEK) K. Yamamura,
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Irradiation Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson K Parker P Dervan J A Wilson D. Parker.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Irradiations/ Birmingham Status Paul Dervan The University of Liverpool, UK ATLAS12 Sensor Testing Meeting 16/01/141.
The Birmingham Irradiation Facility Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson P Dervan J.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
1 ATLAS Upgrade WP4 Face to Face meeting at Glasgow, 13/6/2011 Irradiation activities Richard French, Paul Hodgson –Sheffield Paul Dervan (TL), Gianluigi.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
Martin Freer Materials Irradiation at University of Birmingham.
1 Calorimeter Thermal Analysis with Increased Heat Loads September 28, 2009.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
CLIC Prototype Test Module 0 Super Accelerating Structure Thermal Simulation Introduction Theoretical background on water and air cooling FEA Model Conclusions.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
Si-detector macroscopic damage parameters during irradiation from measurements of dark current evolution of with fluence Craig Buttar, University of Sheffield.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
FLUKA Meeting Milan Jul 2010 Work in the frame of the LHC Phase II Upgrade Previous work was dedicated to the study of the.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
FrontierScience G.P.1 MATRIX an innovative Pixel Ionization Chamber for Online Monitoring of Hadrontherapy Treatments Giuseppe Pittà.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
A Low Power ADS Demonstrator Hywel Owen School of Physics and Astronomy University of Manchester.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Irradiations / Birmingham Status Paul Dervan, Tony Affolder and Sven Wonsak The University of Liverpool, UK Paul Dervan, Paul Hodgson, Kerry Parker, Matthew.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
3/15/2011Nigel Watson / NA62 Meeting. History Radial Ridge Cyclotron – since 2004 Scanditronix MC40 variable energy cyclotron maximum energies 40 MeV.
Development of Silicon Microstrip Sensors in 150 mm p-type Wafers
T-simulation OUTLINE Inputs to the T-simulation: chips, boards, crate mechanics and fan T-simulation performed into two steps: On large scale: simple AM.
Heating and radiological
LN2 Cooling Development D15
Isidre Mateu Suau (EP-DT-DD)
XFEL beamline loads and HOM coupler for CW
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Coatings for neutron conversion for n_TOF
Update on Annealing Studies for Severely Irradiated Silicon Detectors
WP8 – Improvement and equipment of irradiation beam lines
ITK Strip Module Meeting; 12st October 2015
of secondary light ion beams
IRRAD Facility Infrastructure Upgrade
Group meeting, 2nd Sept, 2013; JAW
2017 AFP Beam Tests AFP has 1 week as main user and will also measure together with ATLAS ITk Pixel in H6B -> 2 periods of ~3 weeks
Radiation Damage in Silicon
Radiation Backgrounds in the ATLAS New Small Wheel
Blown up beam analysis 2015 Data collected during Blown Up beam test phase in June 2015.
Summer Student Presentation
Presentation transcript:

WP8.3.2 Common infrastructure for facilities Sensor cooling at the Birmingham Irradiation Facility Maurice Glaser Frederico Ravotti Michael Moll Gianluigi Casse, Paul Dervan Richard French Paul Hodgson Hector Marin-Reyes Kerry Parker John Wilson David Parker Matthew Baca

Evolution: Controlled environment box for irradiation of silicon sensors at CERN PS 1997 to present day Richard French

Proving the forced convection cooling Air (here at room temperature) is blown through a perspex duct by two 8x8 cm 2 fans. The cooled structure is a 10x10 cm 2 sandwich of two 0.6mm Al plates, enclosing kapton film elements providing uniform heating. Airflow speed (judged from injecting small fragments of Kleenex) is of order 1m/s. The lid of the duct is displaced to allow measurement of the surface temperature by a spot radiometer (3xblack squares). FYI: the DC fans are nominally 12V, 2W each. Note that the rise in air temperature is not measured. Production box uses higher powered AC fans. In general this can be estimated from: ΔT(gas) = W/(v.A.ρ.Cv). As an example, choosing some appropriate round numbers: W=1Watt, v = 1 m/s, A = 20cm x 5cm = 10-2 m2. ρ (NTP) = 1.2 kg/m3, Cv ~ 1 kJ/kg/K => ΔT(gas) ~ 0.8C, low enough (for such conditions) that the exit gas should be re-used (rather than vented). Graham Beck W Chilled N 2 Assume that nitrogen is pre-cooled and blown across the detector surface (with detectors edge-on to the beam (a) The plots below are calculated (following a worked example from Holman [1]) for the cooling of a Flat Plate dissipating a constant heat flux by air flowing across it at a given speed and temperature. [1] Heat Transfer, J.P.Holman, 8 th edition, p 244. A change in air temperature produces a similar shift in sensor temperature. However, there is a strong velocity dependence (b). The power dependence (c) is essentially linear. Test system built at QMUL to prove concept (a) (b) (C)

Paul Dervan, Liverpool 1 st PS Sensor Irradiation  One bare sensor and one sensor with hybrid glued on it – can the glue damage the sensor?  Irradiated to 1.82 × p/cm 2 in the cold box on the CERN PS IRRAD scanning table  Reverse current at the end of irradiation (a) (black with bare sensor, red with hybrid).  Temperature on chiller at -16 o C  No degradation due to gluing of the hybrid onto the sensor. Current (mA) Bias (V) Foil Bare sensor Sensor with Hybrid chip (a)

Scanning tables for PS IRRAD Proposed layout of IRRAD area First production 3axis scanning table with cold box (above). Scanning table and rail system installed in beam line (below) Maurice Glaser Frederico Ravotti Michael Moll CATIA models (above) of IRRAD area with thermal box and scanning installed. CATIA model of first installation on beam-line with rail system (right). Frederico & Maurice CERN – PS Proton Synchrotron 24GeV Protons - up to cm -2 Neutrons ~ 1 MeV, 3x10 12 n/hour/cm2

AIDA Cold box Status Established design & manufacture at QMUL/Sheffield. Status Box 1 at CERN installed =ok Box 2 at QMUL in transit / at CERN Box 3 at Sheffield ready to ship Boxes 4&5 at Sheffield near completion Small delay with boxes 4&5 (manpower) First production box at QMUL Box 2 in production / testing at Sheffield Richard French

Cyclotron Irradiation Scanning Table Hector Marin-Reyes, Richard French

Cyclotron Irradiation New Beam Area Richard French, Paul Hodgson

Cyclotron Irradiation: Sensor cooling issues Radial Ridge Cyclotron – since 2004 Scanditronix MC40 variable energy cyclotron maximum energies 40 MeV (protons or alphas) 20 MeV (deuterons) 53 MeV (3He) History & Details Irradiations performed using 26MeV protons with a beam current of 0.4mA – Reconfiguring beam- line for higher beam currents of >0.8mA to ~5A. New shielding installed to allow for higher energy running (>0.8uA) with dedicated beam line for detector activities : Completed October Dosimitery checks all completed Fully operational: November 27 th 2012 Over 14 months full running testing silicon sensors and materials, mainly for ATLAS Upgrade but attracting multiple users. Remedial work underway to complete high powered cooling system Current status of facility Scanning system + Thermal Chamber Fully portable plug & play scanning system Thermal chamber using similar principle to PS IRRAD 5 -22C operation 480W heat load removal Readout and control system using COTS FPGA based technology Networked readout allowing remote access for data analysis and real-time sample performance readout. Richard French

Sensor cooling Early 2013 we spotted a sensor cooling problem when running with very high beam currents (> 0.5uA) – CCE looked ok but further tests showed anomalous results Low beam current running is unaffected = goal is to reduce run time This is due to a longer period of particle interaction with the sensor depositing energy = heat. (We do not see this with CERN PS due to higher flux). CCE measurement Paul Dervan, Paul Hodgson, Kerry parker, John Wilson

Solution: Forced convection cooling with LN2 LN2 system development underway to provide ample cooling power to a new design of thermal box. LN2 system now operational Prototype box made and under test – attempting to modify existing box design with minimal modificatoin. Initial results exceptionally successful We can now provide stable cooling of silicon sensors at -48 C with no issues. Plan to install on beam line asap New box build is slow, but we should have this completed for end June Paul Hodgson, Paul Dervan, Kerry Parker

Conclusion: The Irradiation Facility sited at Birmingham University has performed hundreds of successful irradiations. Using a higher energy beam current will reduce irradiation period. Short irradiation periods = lower cost + higher capacity To increase irradiation through-put requires a new LN2 cooling system. LN2 cooling is now in the final stages of testing / prototyping. This will allow silicon sensor operation and testing during irradiation with no damage to the sensor Low beam current running and passive material irradiation remains unaffected. From end June 2014, very basic LN2 cooling of sensors during irradiation runs will be possible. Planned TA though AIDA 2 has been proposed to this facility, Further more bespoke development of a LN2 cooled thermal box is planned for 2014 onwards (dependent on investment).