Cableway Safety and Inspection Common Cableway Problems.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Rope Construction • Wire Rope • Fiber Rope
for Storm Survival, Long Term Reliability and Safety
Wes Chappell Barrett Blackburn Kelly de Montbrun.
Erecting steel structures Setting up or dismantling cranes or hoists
TRUSSES. ROD TRUSSES U - BOLT TRUSS WHAT IS WRONG WITH THIS PICTURE ?
Engineering Graphics IV
INTRODUCTION TO PRESSURE VESSELS
Pipe Supports and Hangers
Rigging and Rigging Practices Section G of the Logging Code.
Aerospace Fastener Applications
Installation. Indoor Unit Installation Typical Installation.
Solid Cylinder cut at an angle Drawing Abilities Teacher © J Lewis 2004.
Cranes and Slings Major Causes of Crane Accidents
Handrail Assembly and Steel Stairs. Handrail Terminology u Guardrail –top most rail on balcony –higher than handrail u Vertical Rail –members between.
Flexible Mechanical Elements for Motion & Power Transmission
Rigging Equipment for Material Handling Your Safety is the #1 Priority
Copyright  Business & Legal Reports, Inc.
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
2 Post Vertical Shore/Laced Post
Common Problems Freeboard Anchors and U-bars Sag System hardware.
Condensation Piping and Installation Drain Pans
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
Shear - Tensile - Compression Stresses Slip Ted 126 Spring 2007.
Chapter 18 Working Drawings.
Advanced Visualization Techniques
Installation. Indoor Unit Installation Typical Installation.
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
CONSTRUCTING A FIVE CABIN LATRINE
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
BASIC RIGGING.
Chapter 10 Web splice.
Petroleum Engineering 406 Floating Drilling
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Elevated Bridge Building New York State Coaches Clinic October th 2009 Fishkill, New York.
Installation. Indoor Unit Installation Typical Installation.
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Update of anchoring procedures for the ALS floor 09/19/2007.
Experiment 11 Gearing.
Industry Fundamentals and Occupational Safety Unit 6
Cranes and Slings 29 CFR and 184
Chapter 6 Force and Motion II
E4014 Construction Surveying Road Construction Plans.
LRFD-Steel Design Dr. Ali Tayeh Second Semester
BIX In-Building Cross Connect system BIX Installation Guide ELCM 254 Updated December 2013 gmail.com 1 Most of the images and some text for.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
1 T i r e s a n d W h e e l s 2 What Wheels Are Made Of  Made  Made of stamped or pressed steel that are either riveted or welded together. or of aluminum.
Sign Structures Updates: Helpful Tips for Inspectors
Engineering Graphics IV Prof. Jon Southen October 17, 2008.
Cantilever Racks Specifications Scope: This task requires the vendor to provide hardware materials for two types of double cantilever racks for use in.
A-Frame Operation The A-Frame will provide support for odd shaped loads, loads where you are unable to get directly below the load, and for stabilizing.
Flexible Load Handling Attachment: Steel Wire rope
Structural Drafting Assembly Clearance Dimensions.
Concrete Inspection Construction Inspection for Field Office Activities.
Outcome 4 (part 4) Install and test above ground systems Unit 209: Drainage systems.
1 PennDOT Truss Gusset Plate Analysis and Ratings Spreadsheet Overview Karim Naji Assistant Structural Engineer FHWA PA Division
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Cranes, Derricks, Hoists, Elevators, and Conveyors - Subpart N Section 6 Robert Poole St. Paul Fire & Marine Insurance Company.
Introduction Signing for Interchanges Naming Convention
MDX-R3 INSTALLATION PROCESS ADJUSTABLE CONCRETE POOLS
Escalator Installation
Stick Together & Civil Structures
Structural Drawing Chapter 19.
Horizontal Installation Overview
STRUCTURAL TIMBER FRAMING
Winching Safety.
Presentation transcript:

Cableway Safety and Inspection Common Cableway Problems

Common Problems Loose backstays & main cable sag issues A-frame towers Footing/pedestal connections to A-frame Mass anchors and U-bars Freeboard Hardware Streambank erosion & slope stability Design and as-built documentation

Loose backstay cables

Main Cable Sag

Systems designed to current standards should use sag curve from Streamgaging Cableways (Note: not a 2% sag at all points on curves) Older systems should use sag curve from Circular 17 (Pierce, 1947), presented in Streamgaging Cableways 3% sag line

A-frame towers

Saddle Blocks

Sheaves/Saddle Blocks Strength Efficiency - Bending wire rope reduces its strength. To account for the effect of bend radius on wire rope strength when selecting a sheave or saddle block, use the table below: D/d ratio should be > 10 (Streamgaging Cableways) D/d ratio for a pipe A-frame and 1” cable is approximately 6 (not within USGS standards) Ratio D/d Strength Efficiency Compared to Catalog Strength in % D: diameter of sheave, saddle block, etc. d: diameter of main cable

Cable Cars

Cable Cars HIF Cars –Retrofits are required on all stand-up cars (Nov 1997) (Retrofit kits are available from the HIF; part # ) –Retrofits are required on all sit-down cars (Sept 2002) (Retrofit kits are available from the HIF; part # )

Freeboard Design Water Surface Freeboard unknown or documentation lacking Not enough freeboard at 100-yr flood stage Reference mark needed to indicate maximum stage for safe measurements

Footing/pedestal connections to A-frame tower

Footing/pedestal connections to A-frame tower

Footing/pedestal connections to A-frame tower A+

Mass Anchors and U-bars Mass anchors –Many are undersized or actual dimensions unknown –Submergence –Below grade causing cable to lay on ground U-bars –Many are undersized, oriented incorrectly, poorly aligned, or placed at wrong angle –Often no auxiliary U-bars –Use quality U-bars

Mass Anchors Undersized Dimensions unknown Poor below-grade construction Built flush or below grade U-bars Undersized Bearing blocks Poorly aligned Auxiliary U-bars Quality steel?

Mass Anchors & U-bars

Mass anchors & U-bars

Mass Anchors & U-bars

Mass Anchors & U-bars

Standard Anchor Setup Main U-bar and turnbuckle sized to meet specs Two auxiliary U-bars sized to meet specs (see Streamgaging Cableways for details on specifications for sizes and number of main and auxiliary U-bars)

Hardware Eyebolts Clips Thimbles Shackles

Eyebolts Forged, shoulder-type bolt Bolts must be sized to meet load (1” minimum; Streamgaging Cableways) ONLY 30% efficient at 45° angle!!! Table 1 (In - Line Load) Size (in.) Working Load Limit (lbs.) 1/4650 5/161,200 3/81,550 1/22,600 5/85,200 3/47,200 7/810, , /421, /224,000

Failed Eyebolts Not shouldered; not forged Eye is welded shut Long shank; eye should be flush to bearing plate Undersized Placed horizontal not vertical Not-shouldered; not-forged Eye was welded to bolt Undersized (*** This eyebolt failed during a load test before reaching the 2,250 lb design load)

Clips & Thimbles Thimble undersized Clip too far from thimble Good

Clips Clips should be installed with saddle on “live” end of cable as shown: NEVER reuse clips; throw old clips away!!! What if clips have been installed the wrong way? –Leave original clips in place; install new clips, in the correct direction, in the spaces between the original clips –Or if possible; remove clips, cut off “used” portion of cable and install new clips according to manufacturers directions (see Streamgaging Cableways)

Clips-continued When installing new clips on a new cable: –Follow instructions in Streamgaging Cableways Install first (one base width from end) and last (as close to the loop as possible) clips and then install remaining clips equally spaced between the first two No standard spacing between clips; depends on turnback length –Re-torque after first use and again after any larger than normal loads have been placed on the system –If there is a need or you want to check torque during annual inspections, set torque wrench to one setting less than the required torque

Other Hardware Poor Seizing at Ends Sockets

Streambank Erosion

Pre-runoff Post-runoff

Streambank Erosion

Slope Stability

Maintenance Paints & Coatings Special Inspections Unexpected Events

Design and As-Built Documentation (Items Frequently Lacking) Mill certificates & material certifications Make & model numbers of hardware Receipts or design-file notes Subsurface anchor and pedestal dimensions Details of steel reinforcement used Type of cement used in concrete mix As-built drawings or sketches

Did cableway pass inspection? Yes? No? Maybe? Knowledge, judgment, communication