ADD NAME/TITLE HERE Report on the outcome of Harry Gwala Informal Settlements Constitutional case 02 June 2010.

Slides:



Advertisements
Similar presentations
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Advertisements

DEBT OWED TO MUNICIPALITIES PRESENTATION TO THE PORTFOLIO COMMITTEE ON COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
COMMENCEMENT OF ARBITRATION PROFESSOR JOSEPH MBADUGHA.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON HOME AFFAIRS STATUS OF THE AMENDMENTS TO THE REFUGEE ACT AND RELOCATION OF REFUGEE RECEPTION OFFICES CLOSER.
1 Current Labour Law 2011 Collective Bargaining Clive Thompson.
INPUTS INTO THE DRAFT DISASTER MANAGEMENT AMENDMENT BILL Portfolio Committee on Cooperative Governance and Traditional Affairs 22 APRIL.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
Strategic Plan 2012/17 and Annual Performance Plan 2012/13 INDEPENDENT POLICE INVESTIGATIVE DIRECTORATE (IPID) 19 NOVEMBER 2014 BRIEFING TO THE PORTFOLIO.
PRESENTATION ON OPEN TOILETS 1. This presentation serves to provide background and report on progress regarding the construction of toilet top structures.
FARM WORKER AND FARM OCCUPIER HOUSING ASSISTANCE PROGRAMME (FHAP) JUNE 2006.
The KwaZulu-Natal Planning and Development Act APPLICATION PROCESS Schedule 1.
IRSDA Conference What Do the Amendments to Indiana Code Section Mean to You? Kristina Kern Wheeler, General Counsel Ja-Deen L. Johnson, Consumer.
PSC PRESENTATION TO PARLIMENTARY COMMITTEE Joint monitoring committee on the improvement of Quality of Life and Status of Children, Youth and Disabled.
CoJ Housing: Parliamentary Portfolio Committee 23July 2013 Newtown Eviction Matter.
1 Exemption Procedure for Non-compliances at Aerodromes Module - 8 AERODROME CERTIFICATION COURSE October 15Module -8.
Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development South African Post Office SOC Limited Amendment Bill, 2013 Department.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Lecture 4. OUTCOMES What must the equity plan include?. What must affirmative action measures include? Which factors are taken into account in determining.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
SABELO MNGUNI 23 JUNIE COMMITTEES SECTION POLICY PARAMETRES FOR HUMAN SETTLEMENTS.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
National Department of Housing Thubelisha Homes Voluntary Liquidation Closure Progress Status Report 19 February 2014.
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
Varteg Hill – Coal Recovery and Land Reclamation Pre-Application enquiry by Glamorgan Power Ltd. Members Seminar 31/3/14.
17 NOVEMBER 2010 PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM COMMUNAL PROPERTY ASSOCIATIONS: DEPARTMENT OF RURAL DEVELOPMENT.
Presentation of the Property Rates Debt to the Port Folio Committee on Cooperative Governance & Traditional Affairs 25 October 2011 Presented by: Cathy.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
RULES GOVERNING PRIVATE MEMBERS’ LEGISLATIVE PROPOSALS Presentation by NA Table to Committee on Private Members’ Legislative Proposals and Special Petitions.
Policy and Procedure for the Handling of Complaints against the AG Consultation with the Standing Committee on the Auditor-General 9 April 2008 Wandile.
Department of Arts and Culture PRESENTATION TO THE PORTFOLIO COMMITTEE: ARTS AND CULTURE ON THE SOUTH AFRICAN LANGUAGES BILL NOVEMBER 2011 MR SIBUSISO.
DEVELOPMENT OF A WHITE PAPER ON CORRECTIONAL SERVICES Ministry of Correctional Services.
Presentation to the Portfolio Committee on Public Enterprises RICHTERSVELD LAND CLAIM SETTLEMENT: ALEXKOR – RMC PSJV & ALEXANDER BAY TOWNSHIP ESTABLISHMENT.
Presentation to the Portfolio Committee Establishment of an Agency for Social Security 26 February 2003 Department of Social Development.
The National Housing Programme for Farm Residents Presentation to the Portfolio Committee August 2009.
KWAZULU – NATAL INFORMAL SETTLEMENT UPGRADE PRESENTATION.
1 Portfolio Committee on Water and Environmental Affairs WATER TRIBUNAL 16 APRIL 2013.
1 REFUGEES AMENDMENT BILL, 2008 Presentation to the Select Committee on Social Services 17 June 2008 Caring, compassionate and responsive.
National Water Amendment Bill 2014 Presentation to the Select Committee on Land and Environmental Affairs by Department of Water Affairs 4 March 2014 Mr.
LAND RIGHTS MANAGEMENT FACILITY PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 2 March
Portfolio Committee on Human Settlements 08 March 2016 Review Of Community Residential Units Programme (CRU) Mr. M. Tshangana.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Phillipa Silcock Using and discharging conditions.
Background Background 16 April Act came into operation.
NATIONAL HOUSING PROGRAMME FOR HOUSING ASSISTANCE TO FARM RESIDENTS
IMPLICATIONS OF THE HIGH COURT JUDGMENT IN THE MATTER BETWEEN EARTHLIFE AFRICA JOHANNESBURG V MINISTER OF ENVIRONMENTAL AFFAIRS AND OTHERS IN RESPECT OF.
Regulation of land use and building activities
(Portfolio Committee on Justice and Correctional Services)
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
HOUSING PERFORMANCE REPORT 07/08 (3rd Quarter)
PERFORMING ANIMALS PROTECTION AMENDMENT BILL (B9-2015): AN UPDATE
Mr Ntandazo Vimba and Henri Marais
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
Social Assistance Amendment Bill –B5-2010,
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
ADD NAME/TITLE HERE NATIONAL SANITATION PROGRAMME
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Uber submission on amendment of the NLTA Bill
Department of Cooperative Governance
JUSTICE ADMINISTERED FUND BILL [B ] BRIEFING OF THE SELECT COMMITTEE ON SECURITY AND JUSTICE ON 8 NOVEMBER 2016.
UNIFORM CHART OF ACCOUNTS
LEGAL PRACTICE AMENDMENT BILL, 2017
National Bureau of Statistics, China
Joint Workshop of the Finance and Appropriations Committees on the Review of the Money Bills Amendment Procedure and Related Matters Act (Act No 9 of.
Public Protector South Africa Deputy Public Protector of South Africa
Presentation transcript:

ADD NAME/TITLE HERE Report on the outcome of Harry Gwala Informal Settlements Constitutional case 02 June 2010

Introduction The last report before this Committee was on 4 th of November 2009 wherein it was reported that Constitutional Court Judgment was still pending. The Constitutional Court handed down its judgment on 19 November 2009 dismissing the appeal by the residents of Harry Gwala Informal Settlement.

Background The Applicants in this matter were Johnson Matotoba Nokotyana and all the residents of Harry Gwala Informal Settlement, a class of persons contemplated in section 38 of the Constitution. They had originally brought an application before the Witwatersrand Local Division against the Ekurhuleni Metropolitan Municipality.

Background The applicants sought to obtain an interim order that, pending the decision on whether Harry Gwala Informal Settlement should be upgraded in situ, the Ekurhuleni Metropolitan Municipality should be ordered to comply with its constitutional and statutory obligations in terms of the Constitution and the, Housing Code read with the Housing Act.

Background Compliance with the aforementioned prescripts meant, according to the relief sought, that the Ekurhuleni Metropolitan Municipality provided to the Harry Gwala Informal Settlement, the following basic interim services:

Background 1.Communal Water Taps: for the provision of water in accordance with the basic standards required by law and standards. 2.Temporary Sanitation Facilities; 3.Refuse Removal Facilitation and 4.High Mast Lighting in key areas to enhance community safety and access by emergency vehicles

Background The Witwatersrand Local Division granted the applicants the relief sought in respects of: 1.refuse removal facilitation 2. communal water taps and The application for temporary sanitation facilities and high mast lighting was dismissed.

Background The matter came before the Constitutional Court by way of an application for leave to appeal against the decision of the Witwatersrand Local Division dismissing the application for temporary sanitation facilities and high mast lighting.

Order for Joinder The Constitutional Court preliminarily issued an order joining the: 1.MEC for Local Government and Housing, Gauteng, 2.the National Minister of Human Settlements 3.and the Director-General of the National Department of Human Settlements as the second, third and fourth respondents respectively.

Judgment of the Constitutional Court The appeal was dismissed on the basis that chapters 12 and 13 of the National Housing Code were not applicable in the situation of the Residents as these chapters specifically deal with emergency situations and upgraded townships respectively.

Judgment of the Constitutional Court The Residents’ direct reliance on several constitutional provisions was also found to be vague, insufficiently specified and inappropriate. The Court held that it would not be just and equitable to make an order benefiting only those who caused sufficient embarrassment to the authorities by litigation and not the many others in a similar situation.

Judgment of the Constitutional Court The Court considered the view that for the Municipality to provide interim services as demanded by the Harry Gwala Informal Settlement Residents would amount to discrimination against many other similarly situated communities under its jurisdiction. That could only be done on the basis that the circumstances of the Harry Gwala Informal Settlement Residents were exceptional and unique.

Judgment of the Constitutional Court The delay by the Gauteng Province for a speedy decision on the application for upgrading was found by the Court to be the most immediate reason for the dilemma and desperate plight of the residents. The Court emphasized that as long as the status of the Settlement was in limbo, there was little that could be done to improve their situation regarding sanitation, sufficient lighting to enhance community safety and access by emergency vehicles, as well as a range of other services.

Judgment of the Constitutional Court The MEC for Human Settlements, Gauteng was ordered to take a final decision within 14 months of the date of the Court Order on the Ekurhuleni Municipality’s application in terms of Chapter 13 of the National Housing Code to upgrade the status of the Harry Gwala Informal Settlement.

Judgment of the Constitutional Court The MEC was consequently ordered to pay the costs of the applicants in the Constitutional Court.

Actual progress on the ground In 2006, the Gauteng Department of Local Government and Housing appointed a service provider, VIP Consulting Engineers to conduct a feasibility study for the proposed development of Rietfontein 115 IR in Benoni. The results of the study indicated that a total of 389 stands for housing development can be developed in Harry Gwala Informal Settlements.

Actual progress on the ground This meant that only 389 beneficiaries out of a total of 3000 families would be catered for in Harry Gwala. This necessitated that another portion of land be identified that would yield more stands to cater for the balance of the families.

Actual progress on the ground The Gauteng Department of Local Government and Housing identified the two portions of land for this purpose but there is private development taking place at present. Alternative land therefore still needs to be identified.

Actual progress on the ground The Gauteng Department of Local Government and Housing has instructed Professional Resource Team to conduct the following studies, as per recommendations of the feasibility study, for planning purposes of Rietfontein 115IR:

1.EIA Scoping Proof of Submission The Gauteng Department of Agriculture and Rural Development confirmed receipt of the Scoping Report and Plan of Study for Rietfontein 115 IR submitted by Envirolution Consulting on the 9 April 2010.

2. Submit Preliminary Engineering Design The preliminary design report for water and sewer is in process and will be finalised once the draft layout plan has been accepted by the local authority. The preliminary designs will be utilised if the area is considered feasible for residential use by the environmental studies currently in process.

3. Specialist Study A: Floodline Determination The floodline for the study area has been determined and incorporated into the draft layout plan which is currently in process.

4. Geotech Report (NHBRC Phase 1) The geotechnical report for the proposed development has been completed and its details incorporated into the possible formation of the draft layout plan.

4. EIA Approval The EIA approval is in process. All specialist studies have been completed and are being incorporated to form part of the full EIA Scoping report. The report is expected to be submitted by the end of June 2010.The incorporation of the specialist studies will inform the suitability of the area for residential use. The record of decision is expected by the end of October 2010.

Challenges The constraints on the Harry Gwala land are as follows: 1.Potentially dolomite land, 2.Shallow undermined land with a shallow perched water table, 3.A number of servitudes and power-lines and 4.A natural wetland / water courses in close proximity.

Temporary Services Installed Extra Water points within 200m radius Chemical toilets – 1 toilet per 10 households.

Way Forward Layout Plan Submission & Circulation The draft layout plan is in process and is expected to be completed by the end of May 2010.

END THANK YOU