“Mexican experience in the creation and implementation of financial instruments to prevent and attend natural disasters"

Slides:



Advertisements
Similar presentations
Who We Are IPS CONSULTANTS AND ASSOCIATES. started as a group of professionals in legal, administrative and fiscal areas with more than 15 years of experience.
Advertisements

1Comprehensive Disaster Risk Management Framework National Disaster Management Systems 111 Institutional Arrangements and Organizational Structures Session.
World Bank Group Caribbean Catastrophe Risk Insurance Initiative Olivier Mahul Program Manager, Insurance for the Poor, World Bank Coordinator, World Bank.
Reliability of the electrical service Business Continuity Management Business Impact Analysis (BIA) Critical ITC Services Minimum Business Continuity Objective.
October 29,  Fiscal Risks identified and quantified in Mexico: ◦ Budgetary impact of fluctuations in key assumed macro-economic variables ◦ Long-term.
1 Comprehensive Disaster Risk Management Framework National Disaster Management Systems 1111 Introduction to Damage and Reconstruction Needs Assessment.
Presenter: M. Shohelur Rahman Chowdhury Procurement Specialist 1.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
S e c r e t a r í a d e H a c i e n d a y C r é d i t o P ú b l i c o Catastrophic Risk Management in Mexico Manuel Lobato Osorio February 2010.
The Mexican Disaster Risk Financing Strategy Rubem Hofliger Topete Natural Disasters Fund Director General.
2.4.3 Land Use Planning & Regulations and Poverty Alleviation 1 UPA Package 2, Module 4 LAND USE PLANNING & REGULATIONS, AND POVERTY ALLEVIATION.
Protection during Response (Place) – (Date) Day 1 Session 4.1: Protection of At-Risk Groups.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Munich Re-Germanwatch Briefing 2004 Insuring the Uninsurable: Climate Change and Insurance Reinhard Mechler IIASA May 10, 2004 Financing natural disaster.
Update Training Meeting
SEISMIC RISK REDUCTION Stela PETRESCU MDPWH PMU General Director Ministry of Development, Public Works and Housing ICAR FORUM, Bucharest, 1-2 October 2007.
Implications for Caribbean Capital Markets 25 May, 2011 Marlene Murray CFA Society of Trinidad and Tobago.
THE ROLE OF GOVERNMENT IN DISASTER RISK MANAGEMENT Arandjelovac, 5 th June 2015.
1 Ricardo Mena Head, UNISDR Regional Office-the Americas Disaster Law: International Norms, Problem Areas and Future Directions.
Strengthening Public Finance Management Through Computerization of Procurement Management System High Level Forum on Procurement Reforms in Africa Tunisia.
1 Collective Efficiencies Development Finance Architecture Workshop Prerna Banati - July
June, 2003 Poverty and Climate Change Reducing the Vulnerability of the Poor through Adaptation Poverty and Climate Change Reducing the Vulnerability of.
37 th OESAI Conference David Lesolle University of Botswana.
Presentation prepared to: The International Catastrophic Risks Forum 4th Edition “Catastrophe Risk Management Strategies for Governments of Developing.
Damage and Reconstruction Needs Assessment 1 11 Prevention and mitigation: post- disaster/post-crises management Session 3 World Bank Institute Ricardo.
Private investment in risk management as a tool for the promotion of competitiveness and trade Presentation by Ricardo Zapata Martí Disaster Assessment.
Current experiences, opportunities and innovations of municipal financing in Ho Chi Minh City, Vietnam Presentation to International Conference on Financing.
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
1 PREVENTION AND MITIGATION: POST- DISASTER/POST-CRISES MANAGEMENT Ricardo Zapata Marti UN ECLAC.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum “Procurement.
United Nations Economic Commission for Latin America and the Caribbean (UNECLAC) Disasters Lessons Learned and Impact on Recovery and Reconstruction University.
Supervision and Oversight in Procurement as a Tool of Efficient Project Implementation.
GRIP - Global Risk Identification Programme, UNDP Bureau for Crisis Prevention and Recovery, , Local Risk.
PUENTE PROGRAM – BETWEEN THE FAMILY AND THEIR RIGHTS October, 2009.
Session 6 Strategy formulation and climate change prioritizing areas for climate action and funding, linkages to development priorities including poverty.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Workshop on RISKS AND IMPACTS ON FLOOD FROM EXTREME EVENTS IN ASEAN COUNTRIES Bali, August 5 th 2015.
February 2, 2011 Joe Yew City of Oakland California Debt and Investment Advisory Commission Debt 2: Accessing the Market Debt Policy and Plan of Finance.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
 WHAT IS MITIGATION?  DISASTER MANAGEMENT CYCLE.  ORGANISATIONS RESPONSIBLE FOR DISASTER MANAGEMENT AT THE REGIONAL AND NATIONAL LEVEL IN THE CARIBBEAN.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
IDB Draft Disaster Risk Management Policy 0 Bruce Juba Representative Country Office Barbados Inter-American Development Bank Comprehensive Disaster Management.
Disaster Risk Management Basic Concepts. 31 Dec 2003RJ2 Disasters and Development Major natural hazards have larger consequences in developing countries.
World Bank Group Hazards of Nature, Risks and Opportunities for Development in South Asian Countries Regional Conference in New Delhi, India All About.
The World Bank’s Role in Disaster Mitigation Financing the Risks of Natural Disasters June 3, 2003 Alcira Kreimer Manager, Disaster Management Facility.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in Antigua and Barbuda Funded by a special appropriation by the U.S. Congress to countries.
Post-Georges Disaster Mitigation Post-Georges Disaster Mitigation in St. Kitts and Nevis Funded by a special appropriation by the U.S. Congress to countries.
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
Japan International Cooperation Agency Role of stakeholders Priorities for Action Summary of the SFDRR Priority 1: Understanding disaster risk.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
Jela Tvrdonova, The EU priorities:  Use the Leader approach for introducing innovation in the thematic axis  better governance at the local level.
New Pension System in Poland - How to Classify in Accordance with SNA 93 and ESA 95 Krzysztof Pater Undersecretary of State Ministry of Economy, Labour.
1 State of Kenya Population Report Challenges, Opportunities and Recommendations.
Ricardo Zapata ECLAC 1 Quality and methods of field data collection: Presentation of ECLAC methodology: why it works and when it does not Expert consultation.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
ADE’s 25 th anniversary Economic Governance: Key to Development ? Introduction Bruxelles – Bibliothèque Solvay – 5 October 2015.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
1 Microinsurance as a tool to extend Social protection Strengths and weaknesses Future perspectives Valérie Schmitt Diabaté Aly Cissé ILO / STEP, october.
PUBLIC FINANCE IN THE REPUBLIC OF MOLDOVA: REFORMS AND THE DEVELOPMENT STRATEGY PLENARY SESSION OF THE TREASURY COMMUNITY OF PRACTICE JUNE 1-3, 2015, KISHINEV,
1 CONFIDENTIAL ©2016 AIR WORLDWIDE The Evolving Role of Insurance in Building Climate Resilience Brent Poliquin, CCM May 27, 2016.
Treasury of the Republic of Kazakhstan
The Islamic University of Gaza- Higher Studies Deanery
Natural Disasters Fund Director General Ministry of Interior, Mexico
Natural Disasters Fund Director General Ministry of Interior, Mexico
United Nations Voluntary Fund on Disability (UNVFD)
Integrated Strategy for Financing Disaster Risk
Ministry of National Economy of The Republic of Kazakhstan
Presentation transcript:

“Mexican experience in the creation and implementation of financial instruments to prevent and attend natural disasters"

Emergency and/or Disaster (meanwhile and afterwards) Disaster Prevention (before) All federal plans and programs are activated in order to attend the disaster reconstruction FOPREDENFONDEN Days To Weeks Hours, Days to Weeks Months to years Days, Weeks to Months Immediate Fund Occurrence of the phenomenon EMERGENCY DECLARATION AID SUPPLIES FOR THE POPULATION How it is detonated? DISASTER DECLARATION FONDEN resources Disaster Time Line Programmed actions Urgent actions New Reconstruction Fund for local entities

One of the main targets of the Mexican Government is precisely to transit from a disaster reactive system to a preventive system. To accomplish that, by 2004 two prevention programs were implemented: i) the Preventive Trust (FIPREDEN), and ii) the Natural Disasters Prevention Fund (FOPREDEN); which can be used by federal entities, as well as by the Mexican states for the execution of preventive projects, focusing on risk reduction, eradicate vulnerability and exposition of public infrastructure and dwellings of low income population. Preventive Financial Instruments Reactive Preventive With more resources invested in prevention, we are achieving to avoid large disbursements of resources to attend the damages caused by natural disasters. Global Strategy

 Merge between FIPREDEN and FOPREDEN;  Projects based in the risk knowledge;  The possibility to present projects the entire year round;  The projects has to contain a favorable opinion of a technical federal entity;  The Local Risk Atlas as a starting point to present new preventive projects;  The resources approval and exercise thru the Preventive Trust;  The participation of the academic sector thru the investigation account within the Preventive Trust;  The resources approval can be made within the same year that the project is presented;  Variability in the percentages of participation, seeking to benefit the risk analysis and the promotion of a preventive and self protection culture. New FOPREDEN

 Actions focused in the identification and evaluation of hazards, vulnerabilities and risks;  Actions focused in the risk reduction and the mitigation of the damages caused by the impact of natural phenomena and to avoid the risk social construction process, and  Actions to strength the preventive capacities of the population and self protection before risk situations. Preventive actions financed by the new FOPREDEN

In attention to the government’s concerning to increase their capacity to attend the damaged caused by natural phenomena without altering the public finances, by 1996 the Natural Disasters Fund (FONDEN) was created. Although with the FONDEN constitution the trouble related to avoid a lead off on the regular programs resources was in a way solved, there were not a legal regulation which provides the correct control and transparency in the money application; therefore in 1999 the first FONDEN rules were issued, which has had over the years many substantial modifications to accomplish that the procedures be held with maximum efficiency and opportunity. Background Presence of disasters caused by nature The Natural Disasters’ Fund (FONDEN) was created in 1996 Federal Government Natural Disasters Fund “FONDEN”

I.The FONDEN program.- which has a budget line within the Federal Budget of every year; II.The FONDEN Trust.- which is the financial tool thru which the reconstruction is paid and also to finance the acquisition of risk transfer instruments; III.The Immediate Fund.- which is financed by the FONDEN program and/or the FONDEN trust indistinctly; Aid supplies acquisition Reconstruction of damaged infrastructure and housing Contracting of risk transfer instruments The FONDEN is integrated by the following instruments: According to the article 37 of the Federal Budget Law, the FONDEN program budget of each year plus the FONDEN trust reserves cannot be less than 0.4% of the federal budget ($800mdd aprox). supports to develop a risk transfer strategy for local assets

In the event of damages in the infrastructure of the States and Municipalities, the supports provided by FONDEN will be until 50% of the total cost for the reconstruction. The federal entities will be in charged of the execution of this 50% and the local governments will be responsible for the reconstruction of the other 50% with their own resources or thru a credit line from the new Reconstruction Fund for local entities. To attend the federal infrastructure, all the resources will be provided thru FONDEN, with the condition that the federal entities justified that they don’t count with resources in their budgets to pay by themselves the damages. The trustee of the Federal FONDEN Trust is in charge of delivering the approved resources to the contractor businesses of the Federal entities according to the reconstruction advances. The FONDEN procedure

FONDEN PROCEDURE 1/2 Beginning I. Geological III. Others II. Hidrometeorological Issues an opinion regarding the occurrence of the natural phenomena Natural disaster Ask for the confirmation of the occurrence of the natural phenomena Technical entity Opinion ? Negative Positive End Notifies the State that his request is positive Local State Natural Phenomena

Request the issue of the natural disaster declaration Installation of the evaluation committee Each sector evaluates and determine the amounts required for the reconstruction and Delivery of the evaluation results Request for the rapid response resources to realize urgent actions Present to the Committee their preliminary lists of works and actions to be done Ask for resources to attend the evaluation Issue and publish on the national official newspaper the natural disaster declaration 2/1 Local State Federal Agencies Ask for advances to start the reconstruction Local State SHCP Local FONDEN Trust Committee/ SEGOB Authorizes the rapid response resources to realize the urgent actions 2/3 Installation APIN FONDEN PROCEDURE Approve the list of urgent actions to be realized by each sector

Federal FONDEN Trust National Committee Approve the advances Authorizes the total resources for the reconstruction of the federal infrastructure and as much as 50% of the local infrastructure for the federal entities to attend. Meanwhile the States will take care of the other 50% Issue a positive opinion for the documents of each sector so the resources can be approved 3/2 Federal Entities SEGOB Review and present the final documents to access the total resources for the reconstruction Fin SHCP Start the urgent works and actions for the reconstruction with the advances authorized Federal Entities FONDEN PROCEDURE

The Ministry of Interior is the coordinator of the process, since the occurrence of the natural disaster until the approval of the resources, as well as monitoring the correct application of the resources in each and every reconstruction program, no matter if it’s federal or local infrastructure. The execution of the reconstruction works corresponds to the Federal Entities and the Local States. The reconstruction of the federal infrastructure suffer no changes; the federal entities will be in charged of the reconstruction and FONDEN will pay 100% of the cost directly thru the Federal FONDEN trust. For the local infrastructure, the States will have to go thru all the FONDEN process and then once the evaluation is done they will have to sign an agreement with the federal government in which they will let the federal entities reconstruct 50% of the damaged infrastructure with FONDEN resources and they will be in charge of the other 50% with their own resources. Execution

1.The Preventive Action and the Disaster Risk Management as the central key. 2. Strengthening of the existent financial instruments. Seek in a medium time, to merge FONDEN with FOPREDEN, which purpose will be to finance and support the prevision, risk identification, prevention, mitigation, preparedness, emergency attention, recovery and reconstruction, all under one legal regulation and according to the DRM concept, putting the efforts altogether. 3. Strengthening the flexibility, transparency and control in the resources approval and their exercise. Challenges and Priorities

Balance: Prevention Reconstruction Challenges and priorities The preventive action and the disaster risk management in Mexico as a central key element. FONDEN US$4,731 MDD FONDEN US$4,731 MDD FOPREDEN US$114 MDD How much have we invested in the prevention field? Between 2005 and 2010 there is a wide gap between the total disbursement in reconstruction against the investment in prevention The prevention, understood as an investment, will represent in the near future substantial savings, which could be used in the development and economic growth of the country

US $788 million dlls average US $25 million dlls average FOPREDEN budget per year: Balance: Not investing in prevention lead to excessive material and social costs which also compromise the sustainable development of our country TODAY Prevention Reconstruction DISASTER Average FONDEN expenditure per year: Challenges and priorities

FOPREDEN FONDEN $ minimum Average loses per year: 20% of the average losses Investment in prevention per year: Balance: The prevention, understood as an investment, will represent in the near future substantial savings, which could be used in the development and economic growth of the country TOMORROW... diminish... main financial instrument to invest in prevention DESASTRE PreventionPrevention Reconstruction Challenges and priorities

FOPREDEN AND IMPROVEMENTS $1.42 billions Reconstruction $ 3.05 Billions RECONSTRUCTIONFOPREDEN AND IMPROVEMENTS VS Improvements and additions: thru FONDEN’s budget, it’s possible to include mitigation actions to avoid future damages thru specific reconstruction norms that will reduce the vulnerability before future disasters 1. Improvements and additions Preventive aspects of FONDEN FOPREDEN and improvements USD$1.42 billions Reconstruction USD$3.05 billions

Attending to an eminently preventive spirit, we seek that in a medium time limit all the States count with their own natural disaster fund, in order to decentralize this function from the federal government and avoid that all natural disasters that occur in the country continue being attended with federal resources. Preventive aspects of FONDEN 2. Local states funds

This section of FONDEN was created to attend the necessities that the federal entities that belongs to the National Civil Protection System have, to count with the appropriate and sufficient equipment to help the states and municipalities to attend all kinds of different situations caused by disasters. 3. Specialized equipment to prevent and attend natural disasters. Preventive aspects of FONDEN

“Cat Mex” was a combination of a parametric reinsurance policy and a cat-bond covering earthquakes in specific zones of the Mexican territory, which consequently provides protection to FONDEN trust capital. The operation covered earthquake risk for up to 450 million dollars for three years. An insurance claim payment is triggered if: o There’s an official state of emergency or state of disaster declaration issued by the Ministry of Interior, and o An earthquake with the specified magnitude and depth is recorded with its epicenter located in specific zones. In May of 2006, the Mexican Government subscribed the first catastrophic bond issuance in Latin America (“Cat Mex”). A new scheme to complement FONDEN through the financial markets. 4. Risk transfer instruments Preventive aspects of FONDEN

Cat-Mex - Features Cat Mex was a combination of a parametric reinsurance contract and a cat-bond (290 and 160 md, respectively); it covered for three years specific zones against earthquake risk. Zone A: Northwest Cocos Zone B: Central Cocos Zone C: Outer Mexico City

Multi Cat Mexico 2009-Earthquake MultiCat covers 3 zones against earthquake; the coverage amounts to 140 md. Multi Cat Mexico is a catastrophic bond that provides protection for earthquake and hurricane risks. The period covered is three years for

Multi Cat Mexico 2009-Hurricane MultiCat provides financial protection to 150 md against hurricanes in two of the highest-risk zones in the Pacific Coast and the riskiest zone in the Atlantic Coast.

In this regard, during the first half of this year Mexican Government designed and placed a stop loss insurance for FONDEN. This coverage will provide protection to the public infrastructure and housing in poverty during one year from June 10th and will contribute to minimize the probability of cutting funds assigned to other important programs. All of these, in order to give a prompt response to Mexican people, affected by the occurrence of natural disasters. The coverage contracted is unique in it type by an emerging country to transfer natural disasters risks. With the same database and risk analysis done, Mexico began the develop of a risk transfer scheme for events in a bottom layer that covered by Multi Cat. Stop Loss Coverage - Design