NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3.

Slides:



Advertisements
Similar presentations
Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Advertisements

Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Chapter 11 Keys, Couplings and SealsRJM 3/16/04 Chapter 11 - Keys, Couplings and Seals How attach power transmission components to shaft to prevent rotation.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
3. ARMATURE VOLTAGE AND GOVERING EQUATIONS
NSTX TF Flag Joint Review ANALYSIS & DESIGN C Neumeyer 9/3/3.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads
7A1 Friction & Galling Test
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Introduction to Computer Technology
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
TF FLAG JOINT HIGH CURRENT TEST FIXTURE INSTALLATION TO BE IN THE NSTX TRANSITION AREA Features Assembled Components: Flag and Mating Section of TF Center.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Proposed TF Joint Design C Neumeyer 2/26/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet been performed.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
ITER In-Vessel Coils (IVC) Interim Design Review Introduction C Neumeyer July 26, 2010 July 26-28, 20101ITER_D_3F7XHR.
Mechanical Testing of Flag Joint Assembly. TF Flag Assembly to be Tested.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Signals from ISTP-001 April 11-13, 2005 Preliminary Assessment C Neumeyer.
Safety and quality issues – studs and nuts Presentation API 6A Winter meeting Feb
NSTXU-CALC TF Flex Joint and TF Bundle Stub
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
Failure of Original TF Inner Leg Assembly C Neumeyer 4/10/3.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
TF Joint Operations Review Introduction C Neumeyer 2/10/05 Scope and Outline of Review Summary of Findings from 2004 Run Review of Joint Force, Pressure.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
Peer Review NSTX TF Hub Assembly Friction Coating C Neumeyer 10/27/04 Requirements Testing Calculation Update Implementation.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
Figure 1 – NSTX Upper Umbrella Assembly Upgrade Design: Version 3.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NSTX TF Flag Joint Torque Collar Chit Review C Neumeyer 9/11/3.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
TF Joint Operations Review Commissioning Plan C Neumeyer 2/10/05 Test Shots Instrumentation Benchmarking.
NSTX TF Flag Joint Design Review SUMMARY C Neumeyer 8/7/3.
TF Joint Operations Review Simplified Modeling & Protection C Neumeyer 2/10/05 IP and OOP Load Modeling Linear Model of IP and OOP pressure at Joint FEMLAB.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
Proposed TF Joint Design Concept #1 C Neumeyer 3/23/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet.
NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3.
AWB NSTX TF Flag Joint Design Review April 10, 2003 Art Brooks.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
REQUIREMENTS & ASSUMPTIONS C Neumeyer 4/10/3. FIELD AND CURRENT Base GRD requirement: 3kG at R 0 =0.854m with 4.5 sec flat top, once every 300s
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March F.
A PROPOSED TF JOINT DESIGN FOR THE NSTX CENTERSTACK UPGRADE Robert D Woolley 25 February 2009.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
Preliminary Analysis of TF Joint Behavior* C Neumeyer NSTX Team Meeting 2/12/4 *Summary from 1/29/4 Presentation.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Signalling Programme External Stakeholder Meeting on September 17, 2009.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Chapter 11 - Keys, Couplings and Seals
2K Cold Box PDR Introduction
DESIGN MODELING AND ANALYSIS OF SINGLE PLATE CLUTCH
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Presentation transcript:

NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3

BACKGROUND TF joint failed on February 14, 2003 due to structural weaknesses At the April 10, 2003 review….. –cause of failure was explained –new design was presented –sufficient confidence was gained to proceed with conductor machining Since April the analysis, testing, and design has been completed – chits generated during the April review have been resolved Purpose of this review is to examine the final design –identify any shortcomings which may need correction Additional review in September will assess cost and schedule –today’s review will establish that the technical basis is sound

PURPOSE OF REVIEW Obtain critique of new design of the TF Flag Joint –Identify any shortcomings needing further attention (chits) Confirm viability of Flag Joint Design for 6kG operation

SCOPE OF REVIEW TF Flag Joint and Integrated Assembly –Inner Leg / Flag Interface (the joint) –Flag –Flag Fasteners (threaded inserts, studs, washers, nuts, etc.) –Flag Structural Supports (Boxes, Shear Shoes) –Hub Assembly/Torque Collar –Built-in Instrumentation Features Other aspects may be discussed but are out of scope

AGENDA

REVIEW PROCEDURES Chits to be submitted to Chairman B Nelson Chits to be dispositioned by Review Board Chits to be resolved by Cog Engr C Neumeyer P. Anderson, GA L. Dudek J. Irby, MIT B. Nelson,ORNL** ** Chair * Ex-officio  Remote participant C. Neumeyer* P. Peterson, GA P. Titus, MIT  G. Voss, Culham

RECOVERY ACTIVITIES

DESIGN 3D modeling complete, including… integrated TF inner leg bundle coolant tube routing and bulkhead outer leg connections Fabrication drawings complete, including… conductors flags flag boxes shear shoes hub assembly torque collar

ANALYSIS Structural FEA complete, including… both tiers of conductors out-of-plane load path through spline collar and wet lay-up representation in-plane, out-of-plane, thermal loads SOFT, EOFT, EOP cases Other analysis complete, including… force calculations temperatures, including joint temperature rise fastener sizing calculations miscellaneous calculations Formal documentation and checking is presently underway

TESTING Component testing (design input data) consists of: Pull-out tests on threaded inserts - one time and 50,000 cycle at 100 o C Pull-out tests on bolts threaded in copper - one time and 50,000 cycle Friction coefficient and electrical resistance tests Shear tests on torque collar attachment Status: Complete Prototype testing (design verification) consists of: Mechanical mock-up tested for 50,000 cycles Electrical mock-up tested at full current and I 2 T Status: In Preparation

HIGHLIGHTS SINCE APRIL Structural FEA completion -greater insight into thermal-induced behavior Shear Shoe (a.k.a. Shear Key) re-design Torque Collar - Three segment collar - Torsion-only design (de-coupled vertical and radial loads) - Improved epoxy wet lay-up Voltage probe using commercial spring-loaded probe Precision measurement of contact resistivity vs. pressure Component tests completed