Yorkshire HAUC Delivering the Traffic Management Act 2004 Network Management DutyIntervention Criteria Code of Practice for Coordination Fixed Penalty.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

YHAUC Traffic Management Act Checklist for the implementation of the TMA.
Yorkshire Common Permit Scheme For Road Works & Street Works
Street Works Administration of Street and Highway Works Notices For those involved in the planning and administration of street works notices.
Street Works Inspection of Street works Sites
East Midlands HAUC Street Works Training for Administrators
Industrial Emissions Directive Overview. Purpose Update IPPC Directive Update IPPC Directive Combine sectoral directives into a single text Combine sectoral.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
YCPS Yorkshire Common Permit Scheme For Road Works & Street Works.
1 Administration of Street & Highway Works Notices TRAINING HAND OUT For those involved in the administration of street works notices Based on the New.
Eddie Owen Network Technical Manager Veolia Water Graham Barnwell Street Works Manager Wokingham Borough Council Proposed New Charges for Unreasonably.
SEHAUC 2010 The New Safety Code HAUC (UK) JAG (UK)
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Time for a new standard - AS General Conditions of Contract
DEVELOPING THE TRANSPORTATION NETWORK IN WREXHAM ‘Delivering our statutory functions’ Environment & Regeneration Scrutiny Committee 13 December 2007 Transportation.
Utilities Working on the Network Health & Safety Requirements.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Protection Against Occupational Exposure
WASTE MANAGEMENT II WASTE REGULATION OFFENCES AND DEFENCES: CRIMINAL DUTY OF CARE ENVIRONMENTAL PROTECTION ACT (EPA) 1990 PART II ENVIRONMENTAL PERMITTING.
Traffic Management Act 2004 / New Roads & Street Work Act 1991 Coordination & Regulation Update February 2008 (Works Promoters)
Protecting information rights –­ advancing information policy Privacy law reform for APP entities (organisations)
Highways Interface National Highways Interface Team.
Essex Highways NRSWA 22 nd August In event of an emergency Fire alarm? Electronic bell in the Childerditch Depot (No alarm test due today) Emergency.
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
Nov/Dec 2003ElectraNet BSP-2 Workshop (khb) 1 EU Telecoms Regulatory Status Governing Legislation Package 2002  Directive 2002/19/EC Access to, and interconnection.
Traffic Management Act John Webb Technical Manager United Utilities Water plc Dave Capon Streetworks Manager Suffolk County Council.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Registers, ASD and Streets Subject to Special Controls. Ian Ackerman Street Works Manager Hampshire County Council.
Patient Protection and Affordable Care Act March 23, 2010.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Presented by: Yolanda Chavez, RN, BSN Policy Rules and Curriculum Development Unit DADS Regulatory Services 1 DADS REGULATORY UPDATE March 2013.
Implementation of EU Electronic Communication Directives.
Implementation of the Proposed Canada Consumer Product Safety Act (Bill C-6) Mandatory Reporting Health Canada ICPHSO 2009, Toronto.
1 Employment Equity Amendment Bill, 2012 PORTFOLIO COMMITTEE ON LABOUR 12 March 2013.
Traffic Management Act & NRSWA Impact on New Roads and Street Works Act 1991 Ellen Duffy Head of Street Works Branch Department for Transport Ellen Duffy.
Highways and Engineering Consultation Presentation.
Roger Williams Traffic Manager East Sussex County Council Traffic Management Act 2004 A highway authority view.
Traffic Management Act 2004 / New Roads & Street Work Act 1991 Coordination & Regulation Update February 2008 (Coordinators)
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Transport (Scotland) Act 2005 Part 2.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
The Future of Section 74 Peter Goode Nottingham City Council.
© Warwick University 2005 Housing health and safety rating system One Day Course: Enforcement.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
CONGESTION TOPIC GROUP Delivering the Highway Authorities Network Management Duty Steve Johnson Head of Network Management.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Dave Turnbull BT Network Regulation Director – National Joint Utilities Group.
Financial Hardship Provisions. Utility Consumer Protection in WA.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
Health and Social Care Act 2008 Registration and Compliance Monitoring Maggie Hannelly Compliance Manager Bedfordshire 6 December 2010.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure Coordination and Planning Ensuring Parity Ron Weetman - Assistant Head.
- 1 - Noticing the Work Julie Payne – SSE Street works Manager.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Managing the RDS Complying with Legislation ACO Howard Robinson.
Street Works Conference Thursday 19 th May 2005 Cardiff International Arena.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Developing a Local Authority Policy for Safety Audit Jo Horton - Road Safety Engineer Kent County Council
Administration of a FIDIC Contract - Project Control
EPA SUBCONTRACT TEMPLATE Overview September 2017
Dissemination Workshop for African countries on the Implementation of International Recommendations for Distributive Trade Statistics May 2008,
Yorkshire Common Permit Scheme For Road Works & Street Works
Traffic Regulation Order Process for Public Rights of Way
Temporary Event Notices
Neopay Practical Guides #2 PSD2 (Should I be worried?)
Presentation transcript:

Yorkshire HAUC Delivering the Traffic Management Act 2004 Network Management DutyIntervention Criteria Code of Practice for Coordination Fixed Penalty NoticesPermits

Aims of the Traffic Management Act  Clarity  Parity  Tackling congestion & reducing disruption

Network Management Duty Why  Potential impact of road congestion on the economy - delays cost £15+ billion per annum  DfT survey results - 90% of respondents consider road congestion a serious problem - Road works are the most annoying problem

Network Management Duty Part 2 - Network Management by Local Traffic Authorities Duty a)secure the expeditious movement of traffic on the authority’s road network; and b)facilitate the expeditious movement of traffic on neighbouring networks and “traffic” (including pedestrians).

In practical terms this means: Free flowing network Reducing the impact of works, special events, incidents etc Monitoring and assessing performance Network Management Duty Each authority to appoint Traffic Manager (statutory post)

Yorkshire Traffic Managers Network Management Duty

Intervention Criteria A Traffic Director can be appointed and given powers to: –Monitor & report on any matter –Intervene in activities / carry out functions of the local traffic authority –Recover the cost of intervention Network Management Duty Intervention will result in penalties (the loss of CPA stars!!) Critical PI in the CPA Environment block

Code of Practice for the Co-ordination of Street Works and Works for Road Purposes and Related Matters New Roads and Street Works Act 1991

Aim:- to balance the rights of highway authorities & undertakers to carry out works with the right of road users to expect the minimum disruption from works Objectives of Co-ordination Code of Practice

Notices Controls Tools The Three Pillars of Co-ordination Code of Practice

The Noticing System 7 key functions 1.Vital component of the co-ordination process 2.Enable emergency notices & responses 3.Triggers inspection regime 4. Basis of records for reinstatement guarantee periods 5. Location records 6. Facilitates charging regime, and 7. Essential element of the street authority's responsibility for keeping a register. Code of Practice

Noticing - Registerable Works Covers street works, road works and major Highway works that requires:  breaking up or resurfacing of a street;  opening of the carriageway or cycleway of traffic sensitive streets at traffic sensitive times;  any form of traffic control;  reduction in lanes (3 or more lanes)  temporary traffic reg order / notice or suspension of pedestrian facilities  reduction in carriageway width of a TSS at TS times Code of Practice

NONO Is immediate work required to prevent or end a dangerous situation (includes dangerous defective works) Immediate Emergency Works YES Is work to prevent or end an unplanned interruption to a supply, or to avoid substantial loss with respect to an existing supply, or to reconnect a supply to comply with a statutory duty (Traffic signals not working, etc) Immediate Urgent Works YES Are the works, other than immediate or major works, with a planned duration of three days or less. Minor Works YES NONO Are the works in the annual program OR need a TTRO OR have a planned duration of 11 days or more, other than immediate works. Major Works YES NONO Standard Works NONO Noticing - WORKS CATEGORY SELECTION

How do you decide what Notice to send? Works Definitions based on durations  Major Works - 11 days or greater  Standard Works – 4 to 10 days  Minor Works – 1 to 3 days  Immediate Works (burden of proof with undertaker)  Remedial Works Code of Practice “Early Starts” are allowable

How do you decide what Notice to send? Code of Practice

Noticing Points Revised durations can be submitted but could be challenged (overrun charges applied where works are not completed within the agreed duration) Works Clear for interim reinstatements Works Closed for permanent reinstatements (permanent reinstatement to complete within 6 months following interim) Code of Practice

Noticing Rules Compliance with ETON Standard descriptions / S74 durations apply / working day defined One street – One notice Works must not start before proposed date unless otherwise agreed Trench sharing Road closures & portable traffic signals Frontages Error correction Notice cancellation

Controls - Special Street Classifications Restrictions Directions Code of Practice

Controls - Street Classification 3 main categories Protected streets Streets with special engineering difficulties Traffic-sensitive streets Consultation process before designations can be made Code of Practice Other features of a street

Controls - Restrictions Code of Practice

Controls - Restrictions Exemptions Minor works which do not involve the breaking up or excavating of the highway Immediate works Customer connections HSE instruction Gas Safety Regulations Disagreements should be resolved by using the Dispute resolution procedure Good Practice Discuss with the local authority any works impacting on restricted streets Code of Practice

Controls - Directions Section 56 Directions – covering the times that works either proposed, or subsisting can be carried out Subject to 4 Constraints 1 undertakers retain right to execute emergency works 2 serious traffic disruption would be avoided 3 subsisting works causing / likely to cause serious traffic disruption 4 noise abatement of prevention legislation takes precedence Code of Practice

Controls - Directions Section 56A Directions – covering restrictions on placing apparatus in the street Subject to 3 Constraints - It applies only to new apparatus - it can only be used where disruption would be reduced by installing the apparatus in an alternative street - it is reasonable Code of Practice

Controls - Directions Section 66 – covering avoidance of unnecessary delay or obstruction - Works to be completed as quickly as possible - S66 notice can direct either to reduce or remove obstruction - Must comply within 24 hours Code of Practice

Applying Co-ordination Tools Co-ordination meetings - Sharing information as early as possible - Regular input and attendance - Sharing forward plans and programmes - Flexibility of programmes - Cross boundary working Code of Practice

Fixed Penalty Notices (FPN’s) Offences Failure Code 01 Advance notice 02 Starting notice 03 Cancellation 04 Immediate (emergency works) 05 Reinstatement 06 Actual start revised duration 07 Works clear or closed Code of Practice

Fixed Penalty Notices (FPN’s) Offences Amount of Penalty: When a FPN is given the Amount of penalty is £120 (36 calendar days) Discounted amount£80 (if paid within 29 calendar days) FPN must be issued within 91 calendar days following the offence & must have evidence Code of Practice

Fixed Penalty Notices (FPN’s) What do we need to do to avoid an FPN? Code of Practice Right 1 st Time

Draft Code of Practice for Permits Traffic Management Act Code of Practice for Permits

Key features of Permit Schemes Requires approval from Secretary of State Can apply to all or some of the authority’s network Schemes can be in partnership between authorities Schemes can be in common with others Fees applied to every permit Disapplication & modifications to sections of NRSWA Permits

General Principles Permits Key differences Promoters are required to book occupation of a street Start & end dates fixed for Cat 0,1,2 and traffic sensitive streets Some flexibility on CAT 3 & 4 non-traffic sensitive of start date Timing of work – more strictly controlled Conditions can be applied

Permit application and response times Permits

Conditions Permits Permit to include any constraints proposed in application Timing & duration Road space Traffic management provisions Methodology Consultation & publicity Environmental conditions Local conditions Immediate activities

Variations Permits Changing circumstances – Activity Promoter / Permit Authority Extensions allowable Multiple excavations Circumstances beyond the authorities control No formal mechanism for suspension or postponement Cancellation notice

Permits – Maximum Fees Note the scheme must operate on a cost neutral basis on a year on year basis. Utility Impact Assessment Required Permits

Permits & Fixed Penalty Notices The penalties: No permit - £500 (29 day payment discount to £300) Condition breach - £120 (discounted amount £80) Permits

KPIs for permit schemes Mandatory: 1.No. of permit and permit variation applications received, the number granted and the number refused 2. No. of conditions applied by condition type Permits

KPIs for permit schemes Optional: (Must select at least 2 No optional KPI’s) 3. No.of approved extensions 4. No. of occurrences of reducing the application period 5. No. of agreements to work in section 58 and section 58A restrictions 6. The proportion of times that a permit authority intervenes on applications that would normally be expected to be deemed 7. No. of inspections carried out to monitor conditions Permits

Implementation Timetable

From 1st April 2008: Directions as to timing of street works and placing of apparatus Notices of street works Restriction on works following substantial road works Restriction on works following substantial street works Duty to notify street authority of reinstatement

From 12th May 2008: Fixed penalty offences Permits (some time later – Sheffield to progress early)

Traffic Management Act So, …..Street works – Several elements – some significant effects  Changes to “work categories” – duration based  Notice periods – longer advanced notice for S54 & S55  Definition of “Registerable Activities” – captures much more  S56 – Direct both “day” and “time of day”  S56A – Direct (deny) routes for apparatus  S58 – Restrict access after Substantial Road works – 3 to 5 years  S58A – Restrict access after Substantial Street works – up to 1 year  FPN offences – potential for significant cost consequences  Permit schemes – more control by LHA + fees

Traffic Management Act and, …..Street works – What do we need to do  Improve data quality  Improve timeliness  Scenario planning with local authorities (e.g. FPN offences)  Improve & test our processes  Prepare for Permit schemes  Improve awareness  Prepare our resources for implementation