Rocky Mountain Power Five Year Study Kick Off Meeting.

Slides:



Advertisements
Similar presentations
Serving PI in a Geospatial World Amie Evans Seattle Regional Seminar November 10, 2009.
Advertisements

Michigan Environmental Education Curriculum Support (MEECS) Michigan Environmental Education Curriculum Support (MEECS) Energy Resources Unit Lesson 3.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Goshen Area Bus Reconfiguration
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
CONFIDENTIAL Northwest Pipeline Grant Jensen Security Conference Grant Jensen Security Conference.
Gcpud1 CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP CRITICAL INFRASTRUCTURE PROTECTION NERC 1200 CIP
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
1 Value now. Value over time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using OSIsoft to Become Compliant James Cosgrove, Northeast Utilities.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
Interconnection of Distributed Generation
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Montana Ambassadors Helena, Montana February 25, 2011.
Energy Gateway Gateway West Project Gateway South Project
City of Leesburg Electric Department Internal Compliance Program (ICP)
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Rocky Mountain Power Load Growth and Network Planning April 27, 2007 Mark Adams.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
Turkish Power System Overview March 2012
The Land Around Us An Introduction to Maps By: Mrs. Miles.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
WESTERN UNDERGROUND COMMITTEE 2015 Spring Conference 65 th ANNIVERSARY 1950‐2015 Welcome Remarks Bill Chiu Director of Engineering – T&D Southern California.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
PUBLIC POWER UTILITIES IN IDAHO Presented to Legislative Generation Sub-Committee by Idaho Energy Authority (IDEA) and Idaho Consumer Owned Utilities Association.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
Review Maps/Globes Grade 3. A ______________ is a model of the Earth that A ______________ is a model of the Earth that is shaped like a ball or _______________.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
PSE&G Confidential1 PSEG Electric System Overview Mackington Joseph, MSM, PhD.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
DISTRIBUTED GENERATION ISSUES Technical Issues Non-Technical Issues.
USA Questions. What is the capital city of the USA?
Fall River Electric Infrastructure in Island Park Bryan Case, CEO.
Resiliency and Reliability
JEA’s Initiatives and Capital Improvements Program
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Transmission Planning Attachment K Public Input Meeting
Local Area Planning Update to TRANSAC – June 29, 2017
2017 Integrated Resource Plan
Attachment-K Q2 Public Meeting
Unit 2 Map Skills VISUAL VOCABULARY
Pacific Power Seismic Preparedness Update
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
Planning Committee- Map
Review of Distribution Network Protection
Idaho Power Transmission System
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Montpelier & Powder River 5-year Studies
Main needs of electricity system of the Czech Republic
Presentation transcript:

Rocky Mountain Power Five Year Study Kick Off Meeting

© 2000 PACIFICORP | PAGE 2 Agenda –Who is invited? –Basic Study Purpose –Third Party Contributions –Study areas – First Half 2010

© 2000 PACIFICORP | PAGE 3 Who is invited? –Any individual is welcome –City and Municipal officials –Generation producers –Large industrial users –Equipment producers

© 2000 PACIFICORP | PAGE 4 Study Restrictions –CIPS  The reliability of the energy grid depends not only on physical assets, but cyber assets. The North American Electric Reliability Corporation (NERC) realized that, along with protecting the physical assets, Critical Cyber Assets also need to be protected to keep the energy grid secure. –Confidentiality

© 2000 PACIFICORP | PAGE 5 Why Prepare the Studies? –FERC/WECC required –Provides a good round map for future –Provides needed justification to sell new system additions

© 2000 PACIFICORP | PAGE 6 Basic Understanding of the Study –Field Study  Document equipment  Verify system ratings and settings –Identify System Problems and Future Requirements –Generate a Report  Brief Understanding of the Area  List Equipment ratings  Fault duties, operation schemes  Lists system Problems and Future Requirements

© 2000 PACIFICORP | PAGE 7 Third Party Contributions –Load and Forecast Projects –New Points of Delivery –System Power Flow Model –Anticipated Future System Upgrades  Including block load increases

© 2000 PACIFICORP | PAGE 8 Study Areas for First Half 2010 –Montpelier Study  Area encompasses the area around Bear Lake from Georgetown ID in the north to Woodruff UT in the south, and from Garden City UT in the West to Kemmerer WY in the East –Honeyville~Malad Study  Area encompasses nearly all Box Elder County, a small portion of Cache County and a portion of Oneida County in Idaho. In all there is about 3600 square miles of service territory. About 42 percent of this area is not electrified and potentially may never become so. –Pavant Study  Area encompasses the area near Delta, from Lynndyl in the north to Clear lake in the southwest and Fillmore in the southeast.

© 2000 PACIFICORP | PAGE 9 MONTPELIER STUDY Tim Reynolds

© 2000 PACIFICORP | PAGE 10 Montpelier Study Area –Georgetown in the North –Dividing line in the West is the Cache Nation Forest –The 69 kV line from Naughton to the Montpelier area –Woodruff to the South

© 2000 PACIFICORP | PAGE 11 Montpelier Study Info –There are no Municipalities in the study area –There are a total of two Transmission Substations,13 Distribution Substation, and three Transmission Customer –Transmission Voltages are 69 and 46 kV

© 2000 PACIFICORP | PAGE 12 Montpelier Study –Comments or Questions?

© 2000 PACIFICORP | PAGE 13 HONEYVILLE~MALAD STUDY Scott Murdock

© 2000 PACIFICORP | PAGE 14 Honeyville~Malad Study Area –Malad City in the North –Dividing line to the East is the Cache Nation Forest –Brigham City to the South –Ben Lomond while outside of the area, is its main source for power.

© 2000 PACIFICORP | PAGE 15 Honeyville~Malad Study Info –There is one Municipality, Brigham City, in the study area –There is a total of two Transmission Substations (138 kV),15 Distribution Substations, ten Transmission Customers and one municipality –Transmission Voltages are 138, 69 and 46 kV

© 2000 PACIFICORP | PAGE 16 Honeyville~Malad Study –Comments or Questions?

© 2000 PACIFICORP | PAGE 17 PAVANT STUDY Seth Riding

© 2000 PACIFICORP | PAGE 18 Pavant Study Area –Lynndyl to the North –Pavant and Delta are central sources for the area –The 69 kV line to Clear Lake and Graymont Western in the Southwest –The 46 kV line to Flowell and Fillmore in the Southeast

© 2000 PACIFICORP | PAGE 19 Pavant Study Info –There are several Municipalities in the study area –There are a total of 2 Transmission Substations, 8 Distribution Substation, and 6 Transmission Customers –Transmission Voltages are 230, 69 and 46 kV

© 2000 PACIFICORP | PAGE 20 Pavant Study –Comments or Questions?

© 2000 PACIFICORP | PAGE 21 Thank You for Coming