Harnessing the carbon market to sustain ecosystems and alleviate poverty Project Cycle and Project Design Document Project Cycle and Project Design Document.

Slides:



Advertisements
Similar presentations
UNFCCC African Group preparatory meeting for COP9 on LULUCF under the CDM. (UNEP, IUCN, FAO) Addis Ababa, 23/10/2003 Antonio Lumicisi Ministry for the.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Proposals for Verification of A/R Projects Alvaro Vallejo Rama Chandra Reddy Roundtable on Validation and Verification Issues in LULUCF projects Carbon.
EMMER INTERNATIONAAL A/R CDM projects : modalities, implementation and progress Igino M. Emmer EUSTAFOR workshop Forestry & EU ETS Brussels, 26 June 2008.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Method of Evaluating Afforestation/Reforestation CDM Project - An Indonesia Case Study - Sumitomo Forestry Co., Ltd., Tokyo, Japan June 5, 2003 Bonn.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Carbon Trading: The Challenges and Risks John Drexhage Director, Climate Change and Energy International Institute for Sustainable Development Agriculture.
1 Modalities for addressing socio- economic and environmental impacts, including impacts on biodiversity and natural ecosystems Heikki Granholm Programme.
GHG PROTOCOL INITIATIVE Emerging Project Accounting Standards & Guidance Mahua Acharya, WBCSD World Resources Institute.
Overview of BioCF ERPA terms December 15, 2005 The World Bank, Washington, DC.
Defining Responsible Forest Management FSC Forest Certification Standards Defining Responsible Forest Management Version:
Baseline Methodology ARNMB0010 Xiaoquan Zhang and Bernhard Schlamadinger.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Orientation Workshop on March 25 th – 26 th, 2004.
BioCarbon Fund Harnessing the carbon market to sustain ecosystems and alleviate poverty What is a forest?
Limitations in sequestering carbon in forests By Promode Kant Indian Forest Service.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
Methods for Developing Baseline Scenario and Estimating Carbon Stocks Indu K. Murthy.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
Bonn, Germany Sunday, 25 March 2012 The Carbon dioxide Capture and geological Storage As project activities Under CDM – The Durban Regulation First SDM.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
FORESTRY AGENCY „MOLDSILVA” PROTOTYPE CARBON FUND THE WORLD BANK THE WORLD BANK MOLDOVA SOIL CONSERVATION PROJECT Liliana Spitoc, Forest Research and.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM A/R Investors' and Developers' Workshop, Beijing 2010 CDM Afforestation/Reforestation Projects: International workshop for developers and investors.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
Methodologies for Moldova Soil Conservation project ARNM0007 Rama Chandra Reddy July 12, 2005.
CDM and Forestry Sector in India Carbon Pool of Forestry Sector in India The growing stock of the country has been estimated to be 4,740 million m³.
Baselines and Additionality Lucio Pedroni - STC World Bank Carbon Finance Business This presentation is based on materials prepared by Lasse Ringius Training.
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
AIT Case Study 2: Afforestation & Reforestation Project Sudhir Sharma, AIT.
EMMER INTERNATIONAAL ARWG tools and consolidation of methodologies Igino Emmer.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Cacho (2008) 1 THE ROLE OF TRANSACTION COSTS IN LUCF PROJECTS Research funded by ACIAR Oscar Cacho School of Business, Economics and Public Policy University.
FACULTY OF LAW, UNIVERSITY OF OSLO REDD Design and Implementation: Legal Challenges Dr. Christina Voigt University of Oslo, Norway, Faculty of Law REDD.
Verification from PPs perspective Round table on A/R CDM projects Carbon Finance Unit – World Bank August 24&25, 2009 Walter Oyhantçabal A/R WG.
EMMER INTERNATIONAAL LULUCF and insights into the ARWG Igino Emmer.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
AIT Developing Baselines for Afforestation and Reforestation Projects Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 26 th March 2004.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Tatsushi HEMMI Institute for Global Environmental Strategies COP 9 Decisions related to CDM in forestry sector – An update on implications for Asia IGES-URC.
IBRD Emission Reductions Purchase Agreement and General Conditions BioCarbon Fund Training Seminar September 12, 2005 The World Bank, Washington, DC.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Carbon Markets and Carbon Crediting For Forestry West and Central Africa Tropical Forest Investment Forum – August 28 th to 30 th 2007 Timothy Pearson.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
1 Forests and Climate Change London, 24 January 2007 Charlotte Streck
Uncertainties in methodology interpretations for project developers based on an example Roundtable on Validation and Verification Washington,
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

Harnessing the carbon market to sustain ecosystems and alleviate poverty Project Cycle and Project Design Document Project Cycle and Project Design Document BioCarbon Fund Training Seminar, February 5 – 8, 2008

Project Cycle 1. Project identification PIN submission PIN acceptance and fund allocation 2. Carbon asset due diligence New Methodology/ Approved Methodology Project Design DocumentProject Design Document Monitoring Plan Operational Manual 3. Project due diligence (e.g., environmental and social safeguards) 4. Validation 4. Validation 5. Negotiate Emission Reductions Purchase Agreement (ERPA) 6. Registration 7. Start of the Project 8. Verification 9. Certification and Issuance 9. Certification and Issuance 10. End of commitment period (2012 / 2017)

Project Design Document

Project Boundary “Project boundary” geographically delineates the A/R CDM project activity under the control of project participants. The A/R CDM project activity may contain more than one discrete area of land. If it contains more than one discrete area of land, then: Each discrete area of land should have an unique geographical identification; and The boundary should be defined for each discrete area and should not include areas in between the discrete areas of land. Project participants shall justify that each discrete area of land is expected to be subject to an afforestation or reforestation project Project participants shall describe the legal title to the land, rights of access to the carbon, current land tenure, and land use for each discrete area of land.

Forest Definition Project participants shall follow the definition for “forest” selected by the host Party, which specifies: A single minimum tree crown cover value between 10 and 30 percent; A single minimum land area value between 0.05 and 1 hectare; and A single minimum tree height value between 2 and 5 meters. Designated National Authority communicates the forest definition of a Party to the UNFCCC. The definition reported by Designated National Authority would be available at the UNFCCC CDM website. For countries that did not report forest definition, project participants should request the DNA to communicate to the UNFCCC

Technology Major elements of project technology should be described in the PDD Barriers to technology adoption shall be presented with relevant evidence to demonstrate additionality Project technology should compared with the technology used in the region, and first of a kind technology is highlighted in common practice analysis to demonstrate additionaity, e.g., clonal methods in nursery technology, use of improved provenances, siliviculture treatments, etc.

Land Eligibility Land eligibility tool (version 01, EB22) is mandatory in the PDD Land eligibility would need to be demonstrated using: – Aerial photographs or satellite imagery complemented by ground reference data; or – Ground surveys (land use permits, land use plans or information from local registers such as cadastre, owners register, land use or land management register); Written testimony from long-term local residents using participatory rural appraisal methods.

Non-permanence Non-permanence refers to re-emission of CO 2 due to human actions or natural events such as wildfires Credits are reissued/renewed after each verification to address non-permanence. Two types of CERs tCER is valid for the commitment period. It expires at the end of the following commitment period in which it was issued. A tCER issued during would expire at the end of the next commitment period, lCER is valid for the crediting period. The lCER must be replaced as soon as verification shows that the carbon stock has decreased, or if no verification has occurred for a period of five years.

Project Start Date Crediting period shall begin at the start of the A/R CDM project activity. Crediting period starts at the same date as that of the starting date of the project activity. Early start projects can accrue credits from 2000 onwards. A CDM A/R project activity starting after 1 January 2000 could be validated and registered after 31 December 2005, as long as the first verification of the project occurs after its date of registration.

Crediting Period Crediting period defines the length of the project over which credits would be accumulated Fixed crediting period – 30 years Renewable crediting period – 20 years with one renewal (40 years), two renewals (60 years) For projects with renewable crediting period, baseline is reviewed at the end of each crediting period

Choice of Methodology Project should confirm to the applicability conditions of methodology Specific version of an approved methodology is the basis for project validation and registration Leakage is a major determinant in the choice of methodology Revision of an approved methodology or development of new methodology needs to be undertaken if no suitable approved methodology exists. Time for revising an approved methodology or for developing a new methodology ranges between 6 and 12 months.

Carbon Pools Project participants may choose not to account for one or more carbon pools… subject to the provision that the choice will not increase the expected net anthropogenic GHG removals by sinks. Project developers can choose to exclude carbon pools as long as it can reasonably be shown that the pool will not be smaller in the project than in the baseline.

Stratification and Sample Frame Stratification reduces uncertainty and project costs Strata are defined based on one or more variables such as site factors (soil type, elevation, slope), species, age class (planting schedule), initial vegetation (e.g. cleared or scattered trees) etc. Reconciling ex ante vs. ex post stratification would need to be done as part of project monitoring. Sample size for monitoring would need to be specified with a precision and confidence interval (95% CI)

Baseline Baseline approach 22 (a) or 22(b) or 22(c) forms the basis for baseline identification. Baseline is identified using a baseline study or EB approved combined tool Baseline is validated and “frozen” for the crediting period or is “monitored”. All methodologies approved so far support a baseline that is frozen The advantage of a “frozen” baseline is the certainty in emission reductions from a project. The frozen baseline option is used by all projects implemented to date

Additionality AR project is additional if the actual net GHG removals by sinks are increase above the sum of the changes in carbon stocks in the carbon pools in the project boundary that would have occurred in the absence of the project activity. Establishment of additionality is a major step in CDM projects Two non-mandatory tools to establish additionality AR additionality tool Combined AR tool for identification of the baseline and demonstration of the additionality Common practice analysis is recently introduced as step 4 of additionality tool and combined tool (EB35)

Leakage Leakage is an increase in GHG emissions due to displacement of of activities outside the project boundary, e.g., fuelwood collection, displacement of grazing to areas outside the project boundary It could be minimized with good project design and with the inclusion of leakage prevention activities in the project

Environmental Impacts Assessment should include water quality, fire risk, erosion risk, air quality, fertilizer run-off and endangered species. If there are any negative impacts, mitigation efforts would need to be designed and to be approved by the local authority. Designated National Authority would need to be consulted to determine the host country regulation on environmental impact assessment.

Socio-economic Impacts Assessment should include impacts on local and indigenous communities, employment, food production, access to sites and forest products. Designated Operational Entity could request documentary evidence to show that the project will not have negative- socioeconomic impacts. Compliance with local laws and regulation to be ensured.

Stakeholder Consultations Stakeholders comments are solicited and consultations are conducted prior to project registration. PDD should describe the process used in stakeholder consultation and a summary of the comments received should be reported. Documentation of stakeholder consultations would need to be made available to the DOE at validation.

Uncertainty Assessment Project design and location will influence the risks (e.g., fire, flood, leakage and other human impacts). Involving local community and providing alternative livelihoods will reduce risks such as grazing, poaching, illegal felling etc. Natural risks can be lowered by planting strategies, but if risks are large then additional credits should be kept as reserve against losses. Uncertainty assessment should include precision level and 95% confidence intervals for ER estimates