Why is ride important?. Our customers - the driving public values pavement smoothness very high.

Slides:



Advertisements
Similar presentations
Rates, Ratios, and Proportions
Advertisements

Solving Systems of Linear Equations Graphically and Numerically
© 2006 San Diego Gas and Electric. All copyright and trademark rights reserved. How to fund your Virtualization Project SDG&E 2007 Energy Efficiency Program.
Volvo Construction Equipment Road Institute Paving Principles.
THE COMMONWEALTH FUND Deductibles Offered by Medicare Stand-Alone Prescription Drug Plans, 2006 and 2007 $0 58% of plans $50-$100 8% of plans $250 34%
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Vocabulary direct variation inverse variation
Minnesota Department of Transportation Mn/DOTs Gradual Shift from Profile Index to IRI.
Mn/DOT Combined Smoothness Specification Operator Certification Training Workshop July 12, 2010.
2007 PAVEMENT MARKING ACTIVITIES AND PERFORMANCE
Innovative Contracting / Highways for Life Tom Ravn, Acting State Construction Engineer TH 36 Through North St. Paul 12 th Annual Minnesota Pavement Conference.
Ride Specification – IRI Update Prepared by Joe Thomas, P.E. 11/1/06 MAAPT 53 rd Annual Asphalt Conference December 6, 2006.
Final Budget Adoption September 13, Budget Documents available on Web
GEPA Lessons 1-5 Review. Directions: You may work with a partner to complete the following questions in order as they appear in the slideshow. Use a separate.
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
Nominal GDP, Real GDP, and the GDP Deflator
Lecture 11: Algorithms and Time Complexity I Discrete Mathematical Structures: Theory and Applications.
Lecture 4 PY 427 Statistics 1 Fall 2006 Kin Ching Kong, Ph.D
Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
TEXAS DEPARTMENT OF TRANSPORTATION Team TX Texas Turnpike Authority Division, TxDOT Agency Update May 4, 2006.
What is motion? An object is in motion when it’s distance from another object changes. What is a reference point? It is an object or place used to determine.
STEP FUNCTIONS 3.9. INTRODUCTION In 2007, the U.S. postage rate for first class flats was $0.70 for the first ounce plus $0.17 for each additional ounce.
10b.1 Van Horne and Wachowicz, Fundamentals of Financial Management, 13th edition. © Pearson Education Limited Created by Gregory Kuhlemeyer. Chapter.
A Connected Vehicle-Based Application to Estimate Road Roughness Transportation agencies devote significant resources towards collection of highly detailed.
IRI Smoothness Testing for Quality Assurance and Warranty Construction Alberta Transportation CUPGA November 15 th, 2009 Moncton, NB.
Proposal Note 555 Surface Smoothness for Bridges and Approaches
LLP HMA Pavements Inertial Profiler Prebid Meeting Solano A0104 Oakland, CA September 14, 2012 Peter Vacura Chief, Office of Asphalt Pavement.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Presented at: Rutgers Asphalt Paving Conference March 8, 2011 Presented by: Eileen Sheehy, P.E. Manager, Bureau of Materials NJDOT.
Section Find the first four derivatives of f (x) = x 4 - 2x 3 – 3x 2 - 5x - 7.
Pavement Ride Quality Nicholas Vitillo, Ph. D. Center for Advanced Infrastructure and Transportation.
PAVEMENT CONDITION INDICES. n Historic development of pavement condition indices n The basic functions of condition indices in PMS n Different types of.
1.1 Relations and Functions
1.9 Patterns, Equations, and Graphs. Review: Two number lines that intersect at a right angle form a COORDINATE PLANE The horizontal axis is called the.
Graph y = b for 0 < b < 1
Moving to International Roughness Index Measured By Inertial Profilers for Acceptance of New Asphalt Construction in Ontario By John A. Blair, Bituminous.
g = PO D g = × 21 = × g = 12g 12g = 882 ÷12.
Math 1050 Project Transportation Costs
Offsite Detour analysis. Calculation of detour length Distance along SR = Distance along SR
Addressing Localized Roughness at the Project Level by Gary Higgins.
Using LTPP Data in Evaluating the Effectiveness of Pavement Smoothness.
4/25/2017 9:25 AM Inertial Profiler Forum Intro to the Inertial Profiler Implementation September 28, 2015 © 2015 California Department of Transportation.
MnDOT Pavement Surface Smoothness Specification 23 rd Annual RPUG Meeting September 29, 2011.
Direct Variation 2.4. Big idea… 5280ft=1mile. There will always be the same number of feet in a mile, so they are “directly proportional”
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Lesson 4.7 Topic/ Objective: To evaluate and graph piecewise and step functions. EQ: How can you describe a function represented by more than one equation.
IRI T ESTING IN N ORTH C AROLINA Presented by Christopher Bacchi, PE Vice President, Trimat Materials Testing, Inc. Raleigh, NC.
Traffic Signs Part Two. What do these 2 signs tell you?
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
NCDOT – “Final Surface Testing” CAPA / NCDOT Asphalt Training Workshop February 21-22, 2012 Raleigh, NC IRI Standard Specification Article
ROAD PROFILING-ROUGHNESS Presentation by Niranjan Santhirasegaram
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
Graphing and Functions
Graphing Quadratic Functions Solving by: Factoring
ALDOT Specification Updates
CHAPTER 2 RevIEw precalculus.
Section 1.1 The Distance and Midpoint Formulas; Graphing Utilities; Introduction to Graphing Equations.
Section 2.7 Polynomials and Rational Inequalities
Transitioning to IRI for Pavement Smoothness
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Lesson 2.8 Quadratic Models
Use a table of values to estimate the value of the limit. {image}
Objective: Find slope by using the slope formula..
3-1 Inequalities and Their Graphs
A graphing calculator is required for some problems or parts of problems 2000.
Topic/ Objective: To evaluate and graph piecewise and step functions.
Four seasons T T P 2012.
Section 3.1 Graphs of Linear Equations.
Objective: Find slope by using the slope formula..
Presentation transcript:

Why is ride important?

Our customers - the driving public values pavement smoothness very high

MN/DOT Bituminous Specifications provide the contractor an opportunity to receive an incentive or disincentive payment. The payment is based on an International Roughness Index (IRI) value and whether that segment contains any bumps and/or dips.

During construction season 2006; the International Roughness Index (IRI) was used to evaluate ride.

Impact to Incentive/disincentive dollars? For 652, 0.1 mile segments –Equation A - $215,800 –Table A - $194,245

Impact to Incentive/disincentive dollars? For 195, 0.1 mile segments –Equation B - $19, 325 –Table B- $17,475

Incentive/disincentive dollars? For 635, 0.1 mile segments –Equation C - $58,075 –Table C - $69,650 IRI Equation C pays approximately $0.83 dollars for every $1.00 dollar of Profile Index

2007 Smoothness Device Certification will be held at MnRoad, Albertville, MN

We have found that some software programs were incorrectly calculating the IRI values.

2007 Certificates will be yellow!!

For the 2007 Construction Season Four IRI ride specifications –IRI Equation A – replaces Table A –IRI Equation B – replaces Table B –IRI Equation C – replaces Table C –IRI Percent Improvement – predominately for application on single lift overlays where the existing IRI is greater than 120 in/mile

IRI Equations A, B and C (graphed)

Possible changes for the 2008 Construction Season Speed limit change to less than 42 mph –Currently less than 50 mph IRI in both the right and left wheelpaths –Currently right wheelpath only Segments to be pro-rated on actual length –Currently segments greater than 250 feet treated the same

Possible changes for the 2008 Construction Season Specification written for km or 0.1 miles –now references to 100m or 0.1 miles Areas of localized roughness to replace bumps and dips Operator certification –Use of Proval xx.xx to determine areas of localized roughness

Smoother roads last longer. Any questions of us? Thank you