Ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

MINOS sensitivity to dm2 and sin2 as a function of pots. MINOS sensitivity to theta13 as a function of pots Precision Neutrino Oscillation Physics with.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
The MINOS Experiment Andy Blake Cambridge University.
2015/6/23 1 How to Extrapolate a Neutrino Spectrum to a Far Detector Alfons Weber (Oxford/RAL) NF International Scoping Study, RAL 27 th April 2006.
NuMI Offaxis Near Detector and Backgrounds Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
LBNE Target Hall Instrumentation Bob Zwaska January 27, 2010.
The JPARC Neutrino Target
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Debbie Harris Sacha Kopp, Commissioning Workshop 1    Beam Monitoring Hadmon will see remnant protons Muon Monitors see whatever escapes beam.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Long Baseline Experiments at Fermilab Maury Goodman.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Comissioning the NuMI Beam at Fermilab with Ion Chamber Arrays D. Indurthy, R. Keisler, S. Kopp, S. Mendoza, M. Proga, Z. Pavlovich, R. Zwaska Department.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
NuMI NBI03 November 7-11, 2003 FNAL thin beam windows Jim Hylen / FNAL Page 1 FNAL experience with thin beam windows Issue is: Survival of window in high.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Muon Identification in the MINOS Calibration Detector Anna Holin 05 December 2005 University College London.
120 GeV Targeting Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Fermilab AAC meeting August 8, 2007 With thanks to Patrick.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
1 Future Short-Baseline Neutrino Experiments Workshop – March 21, 2012 Workshop on Future Short-Baseline Neutrino Experiments March 21, 2012 Fermilab David.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Žarko Pavlović, 2 Patricia Vahle, 1 Sacha Kopp, 2 1 University College, London 2 University of Texas at Austin Flux Uncertainties for the NuMI Beam.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
1 of 14 NuMI Beam Flux Sacha E. Kopp University of Texas at AustinUniversity of Texas at Austin – 41 University of Southern California – 38.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Muon absolute flux measurement in anti-neutrino mode A.Ariga 1, C. Pistillo 1, S. Aoki 2 1 University of Bern, 2 Kobe University.
NuMI NBI2003 November 7-11, 2003 NuMI Target Jim Hylen / FNAL Page 1 NuMI Target Status, Testing, Support Module At NBI’02: Beam test results of Medium.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Horn focusing effect 2.Beam stability (direction/flux) 3.Beam.
PAC questions and Simulations Peter Litchfield, August 27 th Extent to which MIPP/MINER A can help estimate far detector backgrounds by extrapolation.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
Extrapolation Techniques  Four different techniques have been used to extrapolate near detector data to the far detector to predict the neutrino energy.
NEAR DETECTOR SPECTRA AND FAR NEAR RATIOS Amit Bashyal August 4, 2015 University of Texas at Arlington 1.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Neutrino Beamline Scaling Robert Zwaska Fermilab June 4, 2014 PIP-II Collaboration Meeting.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
LBNE Hadron Monitor and Target Hall Instrumentation Bob Zwaska February 4, 2014.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Observation Gamma rays from neutral current quasi-elastic in the T2K experiment Huang Kunxian for half of T2K collaboration Mar. 24, Univ.
Beamline for the LBNE Project Heidi Schellman for the LBNE collaboration.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Ff Neutrino Time of Flight measurements (with MINOS) Phil Adamson 12 th September 2012.
1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
NuMI Flux, Leonidas Aliaga William & Mary July 25, 2012 Current Uncertainties And Future Plans International Workshop on Neutrino Factories, Super Beams.
Irradiated T2K Ti alloy materials test plans
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
News and brief overview of Beamline plans for the next few months
Conventional Neutrino Beams Day 2
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Presentation transcript:

ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012

ff f f f Anatomy of a neutrino beam Primary proton beam Beam window Target Produce π,K Focusing elements Horns sign-select pions PASI neutrino requirements - Phil Adamson 2 π-π- π+π+ Target Focusing Horns 2 m 675 m νμνμ νμνμ 15 m 30 m 120 GeV protons Decay volume π + -> µ + ν µ Beam Absorber Absorb hadrons Muons range out in rock Neutrinos left

ff f f f Introduction Will discuss the requirements on targets and target halls for high power neutrino beams NOvA at 700kW LBNE at 700kW LBNE+Project X at 2.2MW Low energy beam with Project X? Discussion is mostly generic Brand-name advice also available in the room PASI neutrino requirements - Phil Adamson 3

ff f f f An example from NuMI PASI neutrino requirements - Phil Adamson Solid consistent running delivered 3.2E20 protons to NuMI in FY10 Scheduled summer shutdown But wait – what’s happening over here 4

ff f f f Annus Horribilis Got 2.2E20 in FY11, thanks to heroic efforts from target folks (and delay to future projects) Without target problems would have been 4E20 PASI neutrino requirements - Phil Adamson (NT04)NT05NT06NT01NT02 5

ff f f f This was NT06 PASI neutrino requirements - Phil Adamson Water cooling lines sprang leak after a few days Limped on for a month until outer can failed 6

ff f f f Uptime is important! …but uptime is a Heisenberg number When you try to define it, it gets hard to measure NuMI example: downtime is Time removing broken target and installing new target Time running at low intensity to try to extend life of dying target PASI neutrino requirements - Phil Adamson 7

ff f f f Design Implications Neutrino experiments care about integrated neutrino flux over the years) New target design with 10% flux improvement? Great, but if it needs replacing twice a year at 2 weeks or so downtime each, you just lost. “Yield per proton vs design conservatism” – Tristan this morning Probably guaranteed 4 weeks scheduled downtime per year Target hall maintenance in shutdown is “free” Replace consumable targets etc. Otherwise, want target hall components to be quick to replace or robust PASI neutrino requirements - Phil Adamson 8

ff f f f Neutrino Flux PASI neutrino requirements - Phil Adamson For LBNE, oscillation maxima at 2.5 and 0.8 GeV Must place target inside horn (cf. NuMI LE) Also low energy (cf. BNB) 9

ff f f f Off-axis this isn’t true: NOνA PASI neutrino requirements - Phil Adamson 10 Off-axis, neutrino energy driven by angle Adjust focusing to optimize flux Target goes upstream of horn 0 20

ff f f f LBNE Flux optimization PASI neutrino requirements - Phil Adamson 11

ff f f f Predicting FD spectra Oscillation experiments have near detector to measure beam But you can’t put a near detector far enough away to make the beam look like a point source rather than a line source PASI neutrino requirements - Phil Adamson Depend on modelling beam for F/N pred 12

ff f f f Predicting FD spectra MINOS weights Fluka using ND data at different target positions & horn currents T2K uses measured meson yields from NA61 PASI neutrino requirements - Phil Adamson 13

ff f f f Constraints from FD prediction PASI neutrino requirements - Phil Adamson 14

ff f f f Target Alignment Proton beam scanned horizontally across target and protection baffle Also used to locate horns Hadron Monitor and the Muon Monitors used to find the edges Measured small (~1.2 mm) offset of target relative to primary beam instrumentation. Pulse Height in Chamber (arb.) target baffle target baffle Graphite protection baffle Graphite target Water cooling line 21.4 mm 15.0 mm 11.0 mm 6.4 mm Horizontal Fin Target Horn Baffle p  PASI neutrino requirements - Phil Adamson 15

ff f f f Alignment Need beam-based alignment to be sure of what you’ve got NuMI target hall moves when shielding blocks are installed Thermal motion Target, horns need features that can be located with beam scan Monitoring alignment whilst running would be great Hylen thermometer for NOvA – will it survive 2MW? Particle yields must be insensitive to natural variation in proton beam position Machine dependent NuMI has 100um RMS “Insensitive” is a function of the accuracy of the measurement Issue for balls? PASI neutrino requirements - Phil Adamson 16

ff f f f Proton beam alignment Need to know/measure beam sigma Variations greater than 100um are bad NuMI has Ti SEM wires/foils Won’t work for 2MW Will carbon fibre survive? Electron beam? PASI neutrino requirements - Phil Adamson 17

ff f f f What’s in your target? As mentioned, need target & horn model to extrapolate from near to far detector Target has to be the same from pulse to pulse Different from pbar or muon production target, where you don’t care too much exactly what comes out For neutrino beam, the target is part of the physics of the experiment Difficult to use liquid or powder target for this PASI neutrino requirements - Phil Adamson 18

ff f f f NuMI 2 nd target depletion ( ZXF-5Q amorphous graphite ) NT-02 replaced when spectrum shift became too large. Decrease as expected when decay pipe changed from vacuum to helium fill Each point in energy bin represents ~ 1 month running, time from 9/2006 Gradual decrease in neutrino rate attributed to target radiation damage No change when horn 1 was replaced No change when horn 2 was replaced Spectrum recovered when new target was inserted PASI neutrino requirements - Phil Adamson 19

ff f f f What’s in your target? NuMI observed radiation damage to the graphite of target NT02 (change in neutrino yield) Effect modelled by removing target fins in MC at maximum dpa from MARS model NuMI coped with a loss of yield of 10% with a much better than 1% effect on Near -> Far extrapolation Would prefer to replace a target before it got to that state Want muon monitor able to track this Don’t wait to integrate enough neutrino events to see issue. PASI neutrino requirements - Phil Adamson 20

ff f f f Secondary beam monitoring Target hall is a hostile environment Want multiple complementary beam monitors to distinguish between real effects and dying instrumentation Hadron monitor downstream of decay pipe Survivability at 2MW? Muon monitors Muons and neutrinos come from same decays Calibration, drifts, delta rays, … Temperature rise in absorber is a great independent measure This kind of monitoring feeds directly into experiment’s systematic error budget PASI neutrino requirements - Phil Adamson 21

ff f f f Project X / LBNE beam LBNE beam still comes from Main Injector New RF system, but not much change 53 MHz bunches Bunch length < 2ns sigma 1.2s cycle time at 120 GeV 0.75s at 60 GeV 1.6E14 protons per spill 3.3E11 protons per bunch Factor 4 increase over now 2.3 MW PASI neutrino requirements - Phil Adamson 3.5ns 22

ff f f f Summary Uptime (integrated neutrino yield) For a given target, integrated number of protons It’s probably worth paying a little pion yield for a more robust target Robustness/fast replacement Repeatability Target is the same each pulse Alignability Target hall components can be aligned, and alignment monitored, with beam Radiation damage Model and monitor Redundant instrumentation If you see an effect in hadron monitor and muon monitor, it’s more likely to be real At 2.2MW, expect the unexpected Plan & mitigate risks, but… PASI neutrino requirements - Phil Adamson 23