THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System.

Slides:



Advertisements
Similar presentations
Proposed Capital Program and the 2011 Capital Budget
Advertisements

Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Detroit WWTP NPDES Permit Informational Meeting Michigan Department of Environmental Quality October 23, 2014.
Auditor of Public Accounts Update Bill Cole, Deputy Auditor Auditor of Public Accounts May 8, 2006.
January 20 th, BudgetActual% YTDChange from prior year Ad Valorem Taxes $ 36,469,256$ 27,782, %$ 1,020,143 Sales Taxes 10,781,313 2,638,615.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
1 Milwaukee Metropolitan Sewerage District Legislative Audit Bureau November 2003.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
Environmental Auditing on the Yellow River Basin Liu Huibo from CNAO 5/7/2015 Penang, Malaysia.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Tracie Billington, P.E. Chief Financial Assistance Branch Department of Water Resources.
Building A Better Biosolids Future. A Brief History Sewage Treatment in Detroit  “ The Grand Sewer” 1836  The Fairview Sewer 1913  The Detroit WWTP.
Capital Improvement Plan Workshop May 27, Capital Improvement Plan (CIP) Tool used to develop a five year timeline for scheduling necessary improvements.
Bob Schneider & Kelly Green Michigan Department of Environmental Quality Revolving Loan Section.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
December 4, National Capital Heavy Construction Association Committee of the Whole 2009 Draft Operating and Capital Budgets Tax Supported Programs.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
Ministry of Public Infrastructure Renewal 1 Key Infrastructure Initiatives Status Update Presentation to Energy and Environmental Innovations Conference.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
O Objective:  Asses the feasibility of achieving the disinfection requirement of the primary effluent overflow during wet weather events through the existing.
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Detroit WWTP NPDES Permit Informational Meeting Michigan Department of Environmental Quality October 17, 2013.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Sewage Disposal System Meeting #4 Preliminary Proposed.
Energy, Utilities, and Telecommunication Summer Study Committee Meeting September 2, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of.
Energy Northwest Executive Board Meeting February 27, 2003.
City of Rialto, CA: Utilizing a Private Partner to Fulfill Municipal Needs October 1, 2005 City of Rialto, CA: Utilizing a Private Partner to Fulfill.
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
Revenue Generation Increase county-wide and program revenue Target Range: $3M to $5M Phase 1 Recommendation: $4.3M Highlights: WCHO/CSTS Stimulus Act 88.
The Governor’s Proposed State Budget, Ramona Unified School District January 21, 2010.
Virginia Department of Rail and Public Transportation Transit Capital Funding Issues Jennifer Mitchell NVTC Commission Meeting July 10, 2014.
Aarkstore.com | Global Market for Incinerator Technologies Global Market for Incinerator Technologies.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Sewage Disposal System Meeting #2 – Projected FY.
Huron Consulting Report: Review of Oversight & Compliance for Research-Intensive ISOs CRAD Meeting April 23, 2015.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
P A L M E R D E V E L O P M E N T G R O U P P D GP D G City of Cape Town An Update of the Water Services Financial Model 26 October 2006.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
A National Treasure The Colorado River is a symbol of the Southwest.
Project Management Update TAC Team Meeting
1 PRESENTATION TO THE PORTFOLIO COMMITTEE OF MINERAL RESOURCES. STATEGIC PLAN 2014/19 DATE: 8 JULY 2014 Programme Financial Administration.
THE FOSTER GROUP TFGTFG GLWA Capital Improvement Program Summary and Financing Observations January 26, 2016.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2014 / 15 Fourth Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
2015 Final Budget Presentation City of Northfield.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Memorial University Budget Outlook December 20, 2016
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Update on PI Modeling and Nitrogen Removal at Blue Plains
Major Projects in Development
Final Rate Study Findings
INAC Water and Wastewater: Discussion on Current Policies and Processes Presented at: Circuit Rider Trainer Professional Association’s Annual General Meeting.
Developing and Issuing the RFP
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Proposed Budget Fiscal Year 2018/2019
Item XX Proposed Budget Fiscal Year 2018/2019
City of Fernley City Council Meeting
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

THE FOSTER GROUP TFGTFG Detroit Water & Sewerage Department Capital Improvement Program Statistics – Sewage Disposal System

THE FOSTER GROUP TFGTFG 10/10/2015 Page 2 DWSD CIP Statistics – Sewage Disposal System During the 1990s, DWSD invested approximately $730 million (~$73 million annually) in capital improvements to the water system During the 1990s, DWSD invested approximately $730 million (~$73 million annually) in capital improvements to the water system During the 2000’s, the corresponding figure is $1.56 billion (~$156 million annually) During the 2000’s, the corresponding figure is $1.56 billion (~$156 million annually) The July 2008 CIP called for an additional $1.7 billion over 5 years (~$340 million annually) The July 2008 CIP called for an additional $1.7 billion over 5 years (~$340 million annually) The updated July year CIP anticipates the need for just over $1.0 billion (~$200 million annually) The updated July year CIP anticipates the need for just over $1.0 billion (~$200 million annually)

THE FOSTER GROUP TFGTFG 10/10/2015 Page 3 Annual Capital Improvement Investments Sewage Disposal System – ($ millions)

THE FOSTER GROUP TFGTFG 10/10/2015 Page 4 Annual Capital Improvement Investments Sewage Disposal System – ($ millions)

THE FOSTER GROUP TFGTFG 10/10/2015 Page 5 Capital Improvement Program – Sewage Disposal System Criteria in Report Criteria in Report Primary Project Purpose Primary Project Purpose  1 – Directly Mandated for Regulatory Compliance  2 – Necessary for Regulatory Compliance Mandates  3 – System Reliability  4 - Technological Advance / Efficiency  5 – New Service Areas Allocation Status Allocation Status  D - Detroit Only  S - Suburban Only  M - Macomb Only  C/O - Clinton/Oakland Only  C/O & Mac - Clinton Oakland and Macomb  83/17 - New Wet Weather Facilities  CTA - Common to all

THE FOSTER GROUP TFGTFG 10/10/2015 Page 6 Sewage Disposal System CIP - FUNDED Financing Requirement Summary

THE FOSTER GROUP TFGTFG 10/10/2015 Page 7 Sewage Disposal System CIP - FUNDED Financing Requirement Summary

THE FOSTER GROUP TFGTFG 10/10/2015 Page 8 Sewage Disposal System CIP Comparison July 2009 vs. July 2008– ($ millions)

THE FOSTER GROUP TFGTFG 10/10/2015 Page 9 DWSD CIP Observations – Sewage Disposal System Dramatic reductions in every year Dramatic reductions in every year 2-year Funding Window: 2-year Funding Window: 45% of Prior CIP 45% of Prior CIP Reflects reduction of almost $500 million Reflects reduction of almost $500 million Deferral/Elimination of Environmental Projects pending negotiation of new scope & schedule Deferral/Elimination of Environmental Projects pending negotiation of new scope & schedule Upper Rouge Tunnel ($337 million short term reduction) Upper Rouge Tunnel ($337 million short term reduction) Detroit River Outfall #2 ($185 million short term reduction) Detroit River Outfall #2 ($185 million short term reduction)

THE FOSTER GROUP TFGTFG 10/10/2015 Page 10 DWSD CIP Observations – Sewage Disposal System Elimination of Oakland/Macomb Interceptor Projects (asset to be transferred) Elimination of Oakland/Macomb Interceptor Projects (asset to be transferred) $186 million reduction ($26 million in Funding Range) $186 million reduction ($26 million in Funding Range) Added Long Term Incinerator Improvements Added Long Term Incinerator Improvements $130 million addition ($2 million in Funding Range) $130 million addition ($2 million in Funding Range) Addresses cancellation of Synagro Contract Addresses cancellation of Synagro Contract Other moderate deferrals to match construction schedules Other moderate deferrals to match construction schedules