Chapter 4 Forecasting Production Planning Overview  What is forecasting?  Types of forecasts  7 steps of forecasting  Qualitative forecasting.

Slides:



Advertisements
Similar presentations
Forecasting OPS 370.
Advertisements

© 1997 Prentice-Hall, Inc. S2 - 1 Principles of Operations Management Forecasting Chapter S2.
Operations Management Forecasting Chapter 4
Bina Nusantara Model Ramalan Peretemuan 13: Mata kuliah: K0194-Pemodelan Matematika Terapan Tahun: 2008.
Forecasting Demand ISQA 511 Dr. Mellie Pullman.
PRODUCTION AND OPERATIONS MANAGEMENT
Forecasting 5 June Introduction What: Forecasting Techniques Where: Determine Trends Why: Make better decisions.
Forecasting.
1 Learning Objectives When you complete this chapter, you should be able to : Identify or Define:  Forecasting  Types of forecasts  Time horizons 
J0444 OPERATION MANAGEMENT
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 5-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ PERTEMUAN 14.
Operations Management
Operations Management
Operations Management
Operations Management R. Dan Reid & Nada R. Sanders
Operations Management Forecasting Chapter 4
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Forecasting Chapter 4.
4 Forecasting PowerPoint presentation to accompany Heizer and Render
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Forecasting Operations Chapter 12 Roberta Russell & Bernard.
Mr. David P. Blain. C.Q.E. Management Department UNLV
Slides 13b: Time-Series Models; Measuring Forecast Error
© 2011 Pearson Education, Inc. publishing as Prentice Hall What is Forecasting?  Process of predicting a future event  Underlying basis of all business.
Chapter 3 Forecasting McGraw-Hill/Irwin
LSS Black Belt Training Forecasting. Forecasting Models Forecasting Techniques Qualitative Models Delphi Method Jury of Executive Opinion Sales Force.
Time Series “The Art of Forecasting”. What Is Forecasting? Process of predicting a future event Underlying basis of all business decisions –Production.
Operations and Supply Chain Management
Datta Meghe Institute of Management Studies Quantitative Techniques Unit No.:04 Unit Name: Time Series Analysis and Forecasting 1.
Chapter 4 Forecasting Mike Dohan BUSI Forecasting What is forecasting? Why is it important? In what areas can forecasting be applied?
IES 371 Engineering Management Chapter 13: Forecasting
Forecasting. What is Forecasting? Process of predicting a future event Underlying basis of all business decisions: Production Inventory Personnel Facilities.
Production Planning and Control. 1. Naive approach 2. Moving averages 3. Exponential smoothing 4. Trend projection 5. Linear regression Time-Series Models.
CHAPTER 3 FORECASTING.
CLASS B.Sc.III PAPER APPLIED STATISTICS. Time Series “The Art of Forecasting”
© 2006 Prentice Hall, Inc.4 – 1 Forcasting © 2006 Prentice Hall, Inc. Heizer/Render Principles of Operations Management, 6e Operations Management, 8e.
Operations Management
Forecasting OPS 370.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna Forecasting.
Forecasting Professor Ahmadi.
DSc 3120 Generalized Modeling Techniques with Applications Part II. Forecasting.
Time-Series Forecasting Learning Objectives 1.Describe What Forecasting Is 2. Forecasting Methods 3.Explain Time Series & Components 4.Smooth a Data.
MBA.782.ForecastingCAJ Demand Management Qualitative Methods of Forecasting Quantitative Methods of Forecasting Causal Relationship Forecasting Focus.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Forecasting.
Forecasting February 26, Laws of Forecasting Three Laws of Forecasting –Forecasts are always wrong! –Detailed forecasts are worse than aggregate.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice-Hall, Inc. All rights reserved. Chapter 9 Demand Forecasting.
1 1 Slide Forecasting Professor Ahmadi. 2 2 Slide Learning Objectives n Understand when to use various types of forecasting models and the time horizon.
Forecasting. 預測 (Forecasting) A Basis of Forecasting In business, forecasts are the basis for budgeting and planning for capacity, sales, production and.
Copyright ©2016 Cengage Learning. All Rights Reserved
Production and Operations Management Forecasting session II Predicting the future demand Qualitative forecast methods  Subjective Quantitative.
Welcome to MM305 Unit 5 Seminar Prof Greg Forecasting.
Learning Objectives Describe what forecasting is Explain time series & its components Smooth a data series –Moving average –Exponential smoothing Forecast.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 12.
MGS3100_03.ppt/Feb 11, 2016/Page 1 Georgia State University - Confidential MGS 3100 Business Analysis Time Series Forecasting Feb 11, 2016.
4 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice-Hall, Inc. All rights reserved. Chapter 9 Forecasting.
Module: Forecasting Operations Management as a Competitive Weapon.
CHAPTER 12 FORECASTING. THE CONCEPTS A prediction of future events used for planning purpose Supply chain success, resources planning, scheduling, capacity.
Forecasting Demand. Problems with Forecasts Forecasts are Usually Wrong. Every Forecast Should Include an Estimate of Error. Forecasts are More Accurate.
13 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Forecasting 13 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 8 Forecasting To Accompany.
To accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Fourth Edition  1996 Addison-Wesley Publishing Company, Inc. All rights.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 3 Forecasting.
13 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Forecasting 13 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
Welcome to MM305 Unit 5 Seminar Forecasting. What is forecasting? An attempt to predict the future using data. Generally an 8-step process 1.Why are you.
Mechanical Engineering Haldia Institute of Technology
4 Forecasting Demand PowerPoint presentation to accompany
FORCASTING AND DEMAND PLANNING
Module 2: Demand Forecasting 2.
Forecasting is an Integral Part of Business Planning
Prepared by Lee Revere and John Large
Presentation transcript:

Chapter 4 Forecasting

Production Planning

Overview  What is forecasting?  Types of forecasts  7 steps of forecasting  Qualitative forecasting

Overview  Quantitative forecasting  Time-series forecasting  Naïve  Moving average  Exponential smoothing  Seasonal variations  Associative methods  Monitoring and Controlling Forecasts

What is forecasting? Sales will be $200 Million! Could be a prediction based on historical data and mathematical models Could be a prediction based on expertise and intuition Forecasting - Is the art and science of predicting the future Could be a prediction based on both a model and a manager’s expertise

7 Steps to a Forecast  Determine the use of the forecast  Select the items to be forecast  Determine the time horizon of the forecast  Select the forecasting model(s)  Gather the data  Make the forecast  Validate and implement results

Realities of Forecasting  Forecasts never perfect and seldom correct.  Most forecasting methods assume that there is some underlying stability in the system  Both product family and aggregated product forecasts are more accurate than individual product forecasts

Demand Forecasts  OM manager is primarily interested in demand forecasts (as opposed to economic forecasts and technological forecasts)  Underlying basis of all business decisions  Production  Inventory  Personnel  Facilities

Demand Forecast Applications Time Horizon Medium TermLong Term Short Term (3 months–(more than Application(0–3 months) 3 years) 3 years) Forecast quantity Decision area Forecasting technique

Demand Forecast Applications Time Horizon Medium TermLong Term Short Term (3 months–(more than Application(0–3 months) 2 years) 2 years) Forecast quantityIndividual products or services Decision areaInventory management Final assembly scheduling Workforce scheduling Master production scheduling ForecastingTime series techniqueAssociative

Demand Forecast Applications Time Horizon Medium TermLong Term Short Term (3 months–(more than Application(0–3 months) 2 years) 2 years) Forecast quantityIndividualTotal sales products orGroups or families servicesof products or services Decision areaInventoryStaff planning managementProduction Final assemblyplanning schedulingMaster production Workforcescheduling schedulingPurchasing Master productionDistribution scheduling ForecastingTime seriesAssociative techniqueAssociative

Demand Forecast Applications Time Horizon Medium TermLong Term Short Term (3 months–(more than Application(0–3 months) 2 years) 2 years) Forecast quantityIndividualTotal salesTotal sales products orGroups or families servicesof products or services Decision areaInventoryStaff planningFacility location managementProductionCapacity Final assemblyplanningplanning schedulingMaster productionProcess Workforceschedulingmanagement schedulingPurchasing Master productionDistribution scheduling ForecastingTime seriesAssociativeAssociative techniqueAssociative

Overview of Qualitative Methods READ in TEXT (p )  Jury of executive opinion  Pool opinions of high-level executives, sometimes augment by statistical models  Sales force composite  Estimates from individual salespersons are reviewed for reasonableness, then aggregated  Delphi method  Panel of experts, queried iteratively  Consumer Market Survey  Ask the customer

Patterns of Demand

Quantity Time

Patterns of Demand Quantity Time (a) Random: Data cluster about a horizontal line.

Patterns of Demand Quantity Time (b) Trend: Data consistently increase or decrease over a period of time.

Patterns of Demand Quantity |||||||||||| JFMAMJJASOND Months (c) Seasonal: Data consistently show peaks and valleys at the same time each year. Year 1

Patterns of Demand Quantity |||||||||||| JFMAMJJASOND Months Year 1 Year 2 (c) Seasonal: Data consistently show peaks and valleys at the same time each year.

Patterns of Demand Quantity |||||| Years (c) Cyclical: Data reveal gradual increases and decreases over extended periods.

Overview of Quantitative Methods  Naïve approach  Moving averages  Exponential smoothing  Linear regression Time-series Models – no trend, seasonal, or cyclical fluctuations Associative models

 Set of evenly spaced numerical data  Obtained by observing response variable at regular time periods  Forecast based only on past values  Assumes that factors influencing past and present will continue influence in future  Example Year: Sales: What is a Time Series?

Naïve Approach  Assumes demand in next period is the same as demand in most recent period  e.g., If May sales were 48, then June sales will be 48  Sometimes cost effective & efficient

Moving Average Approach  MA is a series of arithmetic means  Used if little or no trend  Used often for smoothing  Provides overall impression of data over time MA n n  Demand in Previous Periods Periods

Time-Series Methods Simple Moving Averages  Patient arrivals have been recorded at a medical clinic over the past 28 weeks.  Want to predict the number of patient arrivals for the 29 th week.

Time-Series Methods Simple Moving Averages Week 450 — 430 — 410 — 390 — 370 — Patient arrivals |||||| Patient arrivals

Time-Series Methods Simple Moving Averages Week 450 — 430 — 410 — 390 — 370 — |||||| Actual patient arrivals Patient arrivals

Time-Series Methods Simple Moving Averages Week 450 — 430 — 410 — 390 — 370 — |||||| Actual patient arrivals Patient arrivals -No trend -No seasonal variation -No cycle

Time-Series Methods Simple Moving Averages Actual patient arrivals 450 — 430 — 410 — 390 — 370 — Week |||||| Patient arrivals

Time-Series Methods Simple Moving Averages Actual patient arrivals Actual patient arrivals 450 — 430 — 410 — 390 — 370 — Week |||||| Patient WeekArrivals Patient arrivals

Time-Series Methods Simple Moving Averages Actual patient arrivals Actual patient arrivals 450 — 430 — 410 — 390 — 370 — Week |||||| Patient WeekArrivals Patient arrivals

Time-Series Methods Simple Moving Averages Actual patient arrivals Week 450 — 430 — 410 — 390 — 370 — |||||| Patient WeekArrivals F 4 = Patient arrivals F 4 = 397.0

Time-Series Methods Simple Moving Averages Actual patient arrivals 450 — 430 — 410 — 390 — 370 — Week |||||| Patient WeekArrivals F 4 = Patient arrivals

Time-Series Methods Simple Moving Averages Actual patient arrivals Week 450 — 430 — 410 — 390 — 370 — |||||| Patient WeekArrivals F 5 = Patient arrivals

Time-Series Methods Simple Moving Averages Actual patient arrivals 450 — 430 — 410 — 390 — 370 — Week |||||| Patient WeekArrivals F 5 = Patient arrivals

Time-Series Methods Simple Moving Averages 450 — 430 — 410 — 390 — 370 — Week |||||| Actual patient arrivals Patient arrivals Go To Excel

Time-Series Methods Simple Moving Averages 450 — 430 — 410 — 390 — 370 — Week |||||| Actual patient arrivals 3-week MA forecast Patient arrivals

Time-Series Methods Simple Moving Averages Week 450 — 430 — 410 — 390 — 370 — |||||| Actual patient arrivals 3-week MA forecast 6-week MA forecast Patient arrivals

WEIGHTED Moving Averages  SKIP

 Increasing n makes forecast less sensitive to changes  Do not forecast trend well  Require much historical data © T/Maker Co. Disadvantages of Moving Average Methods

 Form of weighted moving average  Weights decline exponentially  Most recent data weighted most  Requires smoothing constant (  )  Ranges from 0 to 1  Subjectively chosen  Involves little record keeping of past data Exponential Smoothing Method

Time-Series Methods Exponential Smoothing 450 — 430 — 410 — 390 — 370 — Week |||||| Exponential Smoothing  = 0.10 F t +1 = F t +  (D t – F t ) Patient arrivals

Time-Series Methods Exponential Smoothing 450 — 430 — 410 — 390 — 370 — Week |||||| Exponential Smoothing  = 0.10 F 3 = 390 (Given) D 3 = 411 F t +1 = F t +  (D t – F t ) Patient arrivals F 4 = ( )

Time-Series Methods Exponential Smoothing 450 — 430 — 410 — 390 — 370 — Week |||||| F 4 = Exponential Smoothing  = 0.10 F 3 = 390 (Given) D 3 = 411 F t +1 = F t +  (D t – F t ) Patient arrivals

Time-Series Methods Exponential Smoothing Week 450 — 430 — 410 — 390 — 370 — |||||| F 4 = D 4 = 415 Exponential Smoothing  = 0.10 F 4 = F 5 = F t +1 = F t +  (D t – F t ) Patient arrivals

Time-Series Methods Exponential Smoothing Week 450 — 430 — 410 — 390 — 370 — |||||| Patient arrivals

Time-Series Methods Exponential Smoothing 450 — 430 — 410 — 390 — 370 — Patient arrivals Week |||||| Exponential smoothing  = 0.10 Go To Excel

Time-Series Methods Exponential Smoothing 450 — 430 — 410 — 390 — 370 — Patient arrivals Week |||||| week MA forecast Exponential smoothing  = 0.10

 Exponential smoothing with trend adjustment  SKIP  Trend projection (p )  Regression analysis

Time-Series Methods Seasonal Influences

QuarterYear 1Year 2Year 3Year Total Average Time-Series Methods Seasonal Influences

QuarterYear 1Year 2Year 3Year Total Average Seasonal Index = Actual Demand Average Demand Time-Series Methods Seasonal Influences Projected Annual Demand = 2600 Average Quarterly Demand = 2600/4 = 650

QuarterYear 1Year 2Year 3Year Total Average Seasonal Index = Actual Demand Average Demand Time-Series Methods Seasonal Influences

QuarterYear 1Year 2Year 3Year Total Average Seasonal Index = = Time-Series Methods Seasonal Influences

Quarter Year 1 Year 2 Year 3 Year 4 145/250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = 0.39 Time-Series Methods Seasonal Influences

Quarter Year 1 Year 2 Year 3 Year 4 145/250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = 0.39 QuarterAverage Seasonal Index 1( )/4 = Time-Series Methods Seasonal Influences

Quarter Year 1 Year 2 Year 3 Year 4 145/250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = 0.39 QuarterAverage Seasonal Index 1( )/4 = ( )/4 = ( )/4 = ( )/4 = 0.50 Time-Series Methods Seasonal Influences

Quarter Year 1 Year 2 Year 3 Year 4 145/250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = 0.39 QuarterAverage Seasonal IndexForecast 1( )/4 = ( )/4 = ( )/4 = ( )/4 = 0.50 Projected Annual Demand = 2600 Average Quarterly Demand = 2600/4 = 650 Time-Series Methods Seasonal Influences

Quarter Year 1 Year 2 Year 3 Year 4 145/250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = 0.39 QuarterAverage Seasonal IndexForecast 1( )/4 = (0.20) =130 2( )/4 = ( )/4 = ( )/4 = 0.50 Projected Annual Demand = 2600 Average Quarterly Demand = 2600/4 = 650 Time-Series Methods Seasonal Influences

Quarter Year 1 Year 2 Year 3 Year 4 145/250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = /250 = /300 = /450 = /550 = 0.39 QuarterAverage Seasonal IndexForecast 1( )/4 = (0.20) =130 2( )/4 = (1.30) =845 3( )/4 = (2.00) =1300 4( )/4 = (0.50) =325 Time-Series Methods Seasonal Influences

Remember Regression Analysis?

Dependent variable Independent variable X Y

Remember Regression Analysis? Dependent variable Independent variable X Y

Remember Regression Analysis? Dependent variable Independent variable X Y Regression equation: Y = a + bX

Remember Regression Analysis? Dependent variable Independent variable X Y Actual value of Y Value of X used to estimate Y Regression equation: Y = a + bX

Remember Regression Analysis? Dependent variable Independent variable X Y Actual value of Y Estimate of Y from regression equation Value of X used to estimate Y Regression equation: Y = a + bX

Remember Regression Analysis? Dependent variable Independent variable X Y Actual value of Y Estimate of Y from regression equation Value of X used to estimate Y Deviation, or error { Regression equation: Y = a + bX

Regression analysis in forecasting  Two applications of regressions analysis in forecasting  Time-series data  Independent variable is time  Dependent variable is the variable that you want to forecast (i.e. demand)  Data is not time-series  Independent variable is a known variable that can be used to predict (i.e. advertising dollars, customer population)  Dependent variable is the variable that you want to forecast (i.e. demand)  Regression analysis is the same in both applications

Armand, Inc.: Regression Analysis Armand, Inc. is a chain of Italian restaurants located in a five-state area.  The most successful locations have been near college campuses.  Prior to opening a new restaurant, management requires a forecast of the yearly sales revenues.  Such an estimate is used  in planning the restaurant capacity,  personnel requirements, and  to see if the operations costs are smaller than the predicted revenue.

Armand, Inc.

Go To Excel

Armand, Inc. Intercept Coefficient for Student Population

Armand, Inc.  Forecast the Annual Sales if the student population is 20,000.

Armand, Inc.  Forecast the Annual Sales if the student population is 20,000. Forecast is : $160,000

Forecasting accuracy “I think there is a world market for about FIVE computers.” —Thomas J. Watson, chairman of IBM, 1943

Forecast accuracy  IBM 1994  $700 million inventory of OBSOLETE PCs that took 6 months to unload.  Reaction: too conservative when releasing the new Aptiva home PCs. New models sold out before the holiday season had begun.

Measuring the quality of forecasting  MAD – mean absolute deviation  MSE – mean square error

Your Turn  Demand for April-September is given.  Determine the exponential smoothing forecasts for those April.  Forecast for Mar was 58  Demand for Mar was 60.  Determine the regression equation forecasts for those April.  X is the number of months in the future (for April, X = 1)

Your Turn Demand Exponential Smoothing alpha = 0.2 Regression Y = X April60 May55 June75 July60 August80 September75 Calculate for APRIL: Exponential smoothing forecast Regression forecast Forecast for Mar was 58 Demand for Mar was 60. X is the number of months in the future (for April, X = 1)

Your Turn Demand Exponential Smoothing alpha = 0.20 Regression Y = X April May June July August September

Your Turn Demand Exponential Smoothing alpha = 0.20 Exp Smooth abs(forecast error) Regression Y = X Regression abs(forecast error) April May June July August September MAD = Calculate abs(forecast error) for April

Your Turn Demand Exponential Smoothing alpha = 0.20 Regression Y = X April May June July August September MAD =

Your Turn Demand Exponential Smoothing alpha = 0.20 Regression Y = X April May June July August September MAD = Calculate MAD for each.

Your Turn Demand Exponential Smoothing alpha = 0.20 Regression Y = X April May June July August September MAD =8.8MAD =6.12

Third Wave Research Group - offers marketing software and databases - Forecasts sales for specific -Market areas -Products -segments

Tracking Signals

Tracking signal = RSFE MAD +2.0 — +1.5 — +1.0 — +0.5 — 0 — –0.5 — –1.0 — –1.5 — ||||| Observation number Tracking signal Control limit

Tracking Signals Tracking signal = RSFE MAD +2.0 — +1.5 — +1.0 — +0.5 — 0 — –0.5 — –1.0 — –1.5 — ||||| Observation number Tracking signal Control limit Out of control

Tracking Signal Computation

Tracking Signals Tracking signal = RSFE MAD +2.0 — +1.5 — +1.0 — +0.5 — 0 — –0.5 — –1.0 — –1.5 — ||||| Observation number Tracking signal Control limit Out of control

Demand Forecast Applications  Time horizons Short term0 – 3 monthsDay to day More accurate Medium term3 months – 3 yearsSales & Production planning Budgeting Long termOver 3 yearsLong term projects Facility planning New products