CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
June 2010 At A Glance The Room Alert Adapter software in conjunction with AVTECH Room Alert™ devices assists in monitoring computer room environments as.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Status report - Technical aspects RAMSES Project Status report - Technical.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
WG-AL3S - Recommendations1 H. Laeger; SAPOCO 9/11/98 Working Group LHC Safety Alarms (AL3S) DSO TIS & FB LHC GLIMOS CONTROLS Civil Engineering Legal Service.
CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Systems Engineering Approach to MPS Risk Management Kelly Mahoney Presented at the Workshop for Machine Protection in Linear Accelerators.
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Automatically Capturing Data from SCADA to the Maintenance System
4th ST Workshop, Chamonix 2001U. Epting, M.C. Morodo Testa, P. Sollander Is the CERN recommended SCADA useable for the ST division?
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
André Augustinus 16 September 2002 Safety issues.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Peter Chochula ALICE DCS Workshop, October 6,2005 DCS Computing policies and rules.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
FAIR Accelerator Controls Strategy
1 / Name / Date IDA Interface for Distributed Automation The journey toward Distributed Intelligence.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Safety systems (AL3) and systems relevant to Safety Steve Hutchins with thanks to: Karl Gunnar Lindell, Rui Nunes, Silvia Grau, Henrik Nissen, Patrice.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
6 July 2000CSAM Team1 CERN Safety Alarm Monitoring Invitation to Tender Strategy CERN Safety Alarm System Supervisory Board 3st meeting CSAM project team.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
1LHC COOP, Uwe EPTING, CERN, ST/MO LHC - Technical Infrastructure Monitoring Uwe EPTING CERN, ST/MO.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
The Technical Network in brief Jean-Michel Jouanigot & all IT/CS.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
EDMS July 2004 LHCb Experiment Area Meeting RAMSES at LHC point 8 LHCb Experiment Area Meeting 21 July 2004 RAMSES at LHC point 8 LHCb Experiment.
External Data and DIP Oliver Holme 18 th January 2008.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
- My application works like a dream…does it. -No prob, MOON is here. F
Automation Technologies SCADA SENSORS HMI
MEDICIS Safety Alarms Systems
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Safety Systems for ALICE
FCT and CERN Portuguese Trainee Programme Report
CV PVSS project architecture
How SCADA Systems Work?.
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
Presentation transcript:

CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group

21 March 2001JCOP presentation - L. Scibile and the CSAM Team2 Introduction S afety information A larm system M onitoring system C ERN

21 March 2001JCOP presentation - L. Scibile and the CSAM Team3 Introduction C ERN S afety A larm M onitoring = CSAM

21 March 2001JCOP presentation - L. Scibile and the CSAM Team4 Detection equipment Background Hard - wired network Computer-based network What’s next ? Fire CDIN B104-R-02

21 March 2001JCOP presentation - L. Scibile and the CSAM Team5 CSAM Mandate u The CSAM will provide CERN with an integrated safety alarm system covering acquisition, transmission, logging and display for all the CERN sites, the LHC machine, LHC experiments and experimental areas. The system will be incorporated into the safety, technical, accelerator, and experiment control rooms. u The requirements of the system were defined by the AL3S* working group. u The mandate of the project team covers the system specification, prototyping, tendering, installation and integration of the product in the existing monitoring architecture. * Safety alarms require the immediate intervention of the fire brigade and are defined at CERN as 'Alarms of Level 3' (AL3S)

21 March 2001JCOP presentation - L. Scibile and the CSAM Team6 CSAM Specification u For the Fire Brigade u Safety alarm acquisition from all CERN safety zones u Local monitoring from each safety zone u Central monitoring, archiving, display, reporting and configuration u Non-interruptible 24h/365d system based on redundant networks u Specific human computer interfaces and tools for the alarm handling u Real-time monitoring of the correct functioning of all sub-systems. u For the Experiments and the other control rooms u A safety alarm gateway to external systems u A flexible system architecture for the integration of the LHC and LHC experiments future alarms. u A modular acquisition and local monitoring system based on standard industrial equipment

21 March 2001JCOP presentation - L. Scibile and the CSAM Team7 CSAM Specification, cont. u No common mode of failure u Power supply, Location, server, display, acquisition module,etc. u INB compliant system based on redundant transmission paths. u Availability requirements u In order to meet the availability requirements of  99.8% set by the AL3 Working Group, a Safety Integrity Level (SIL) 2 has been fixed. u A supervision and monitors the availability of all sub-systems and generates performance reports.

21 March 2001JCOP presentation - L. Scibile and the CSAM Team8 CSAM specifications, cont. Transmission System Technical Data Interface Safety Alarm Detection Interface Safety Alarm Transmission Redundant Safety & Technical Alarm Transmission Central Alarm Display Human Computer Interface Supervision Local Alarm Display Safety Actions Reference Database (Configuration) Data Exchange Protocol Event Logging System Functional diagram

21 March 2001JCOP presentation - L. Scibile and the CSAM Team9 CSAM supervision & maintenance manager Technical Data Server (TDS) Local safety alarms controller Safety alarm networks Safety alarm monitoring centre Safety alarm gateway to external systems (TDS, experiments, XCR, etc.) CERN safety equipment x33 Hardwired Path 1Path 2 TCR consoleSCR console SCR SCADA x2 PLC 1PLC 2 CSAM specifications, cont. PVSS

21 March 2001JCOP presentation - L. Scibile and the CSAM Team10 Safety alarm Monitoring centre Remote XCR console SCR SCADA Experiments DCS Experiments Local XCR console Safety alarm gateway to external systems (TDS, experiments, XCR, etc.) CSAM-experiments interface u How u Data exchange protocol u JCOP conventions u For the XCR operators u Only Safety Alarms and safety-related information concerning their experiment. u Also analogue values of safety equipment. u Possible seamless integration in the experiment DCS

21 March 2001JCOP presentation - L. Scibile and the CSAM Team11 Local safety alarms controller Safety alarm Monitoring centre CERN safety equipment Remote XCR console SCR SCADA CSAM animation scenario Experiments DCS Technical Data Server (TDS) Experiments Local XCR console Safety alarm gateway to external systems (TDS, experiments, XCR, etc.) Warning

21 March 2001JCOP presentation - L. Scibile and the CSAM Team12 Current system

21 March 2001JCOP presentation - L. Scibile and the CSAM Team13 Future systems

21 March 2001JCOP presentation - L. Scibile and the CSAM Team14 Current System

21 March 2001JCOP presentation - L. Scibile and the CSAM Team15 Current System

21 March 2001JCOP presentation - L. Scibile and the CSAM Team16 Current system

21 March 2001JCOP presentation - L. Scibile and the CSAM Team17 4 alarms Future system

21 March 2001JCOP presentation - L. Scibile and the CSAM Team18 B Future system

21 March 2001JCOP presentation - L. Scibile and the CSAM Team19 15:16:15Flooding Det.INOND-863-E-T SPS-B-862-R-05Flooding Detected came Future system

21 March 2001JCOP presentation - L. Scibile and the CSAM Team20 Prototype

21 March 2001JCOP presentation - L. Scibile and the CSAM Team21 What has been done ? u Analysis of technical solutions u IEC61508 standards u Prototype u Technical specifications including: u User requirements u Functional and safety requirements u Product requirements u Interface requirements u Approval of the finance committee

21 March 2001JCOP presentation - L. Scibile and the CSAM Team22 What’s next? u Detailed design and testing during year 2001 u Pilot installation planned for APRIL 2002 u Deployment of product on the CERN site in accordance with the LHC and LHC experiments schedule

21 March 2001JCOP presentation - L. Scibile and the CSAM Team23 Additional information u Papers u S. Grau, P. Ninin, R. Nunes, L. Scibile, C. Soler, CERN Safety Alarm monitoring Project, 3rd ST workshop Chamonix, February u L.Scibile, P.Ninin, S.Grau, Functional Safety: a Total Quality Approach, 4st WS Chamonix, u S. Grau, L. Scibile, F. Balda, A. Chouvelon, Application of risk management for control and monitoring systems, 4rd ST workshop Chamonix, February u Visit the CSAM Homepage: u u Just come and see us!