Project Management Concepts
Advertisements

Work Breakdown Structures
Project Management 6e..
Quick Recap. Quick Recap The Project Plan Plan Your Work, then Work Your Plan.
Management & Development of Complex Projects Course Code - 706
Defining Scope, Quality, Responsibility, and Activity Sequence
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Degree and Graduation Seminar Scope Management
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Project Management Session 7
Chapter 5: Project Scope Management
CHAPTER 9: LEARNING OUTCOMES
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Module 9 Session 9.2 Visual 1 Module 9 Designing Control and Reporting Systems (Time, Cost, Resources and Scope (Performance and Quality)) Session 9.2Managing.
Chapter 5 Planning
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
How to integrate the parts of your project to achieve success.
Topic 2- 1ICT 327 Management of IT Projects Semester 1, 2005 Topic 2 Project Planning & Initiation Schwalbe: Chapter 3 Compiled by Diana Adorno and contributions.
Edward B. Farkas, Managing Director, Project Management Practice
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Defining the Project CHAPTER FOUR PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Systems Analysis and Design in a Changing World, 6th Edition
November 1-4, 2011 Project Scope Document. Facts Creates a common understanding Prepared by team or team contractor Has a lot of detail.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management. The Project Management Institute
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Scope Planning Chapter 6 Contemporary Project Management Kloppenborg © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated,
Lecture 4 Title: The Scope Management Plan
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Information Technology Project Management
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Geog 469 GIS Workshop Project Management.
Work Breakdown Structure Use and Demo
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Develop Project Charter
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Systems Analysis and Design in a Changing World, 6th Edition 1 Chapter 1 INTRODUCTION TO SYSTEMS ANALYSIS AND DESIGN: AN AGILE, ITERATIVE APPROACH From.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
SOFTWARE PROJECT MANAGEMENT
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
IT-301 Project Management I: Unit 4: Cost Management.
Information Technology Project Management, Seventh Edition.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Project Management Systems
Managing the Information Systems Project
Chapter 5 Planning
Defining Scope, Quality, Responsibility, and Activity Sequence
Defining Scope, Quality, Responsibility, and Activity Sequence
Defining Scope, Quality, Responsibility, and Activity Sequence
Chapter 5 Planning
P ROJECT M ANAGEMENT Skills.
Defining Scope, Quality, Responsibility, and Activity Sequence
Presentation transcript:

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Defining Scope, Quality, Responsibility, and Activity Sequence 4

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Chapter Concepts Clearly defining the project objective Preparing a project scope document Understanding the importance of planning for quality Creating a work breakdown structure Assigning responsibility for work elements Defining specific activities Creating a network diagram Utilizing a project management methodology called the systems development life cycle for information systems development projects

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Learning Outcomes Establish a clear project objective Prepare a project scope document Discuss the importance and elements of a project quality plan Develop a work breakdown structure Prepare a responsibility assignment matrix Describe how to define specific activities Create a network diagram

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Project Integration Management Project Scope Management Project Quality Management Project Time Management Project Management Knowledge Areas from PMBOK® Guide

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Establish Project Objective Planning process is based on the project objective  Establishes what is to be accomplished  Often stated in the project charter or RFP  Is the tangible end product Project objective includes  Expected benefits  Primary project end product or deliverable  Date required to be completed  Budget Changes agreed upon by customer and contractor

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Define Project Scope Project Scope Defines what needs done Includes  Items contained in project charter, RFP, proposal  More detail Establishes common understanding of scope with stakeholders Project Scope Document Usually contains  Customer requirements  Statement of Work  Deliverables  Acceptance Criteria  Work Breakdown Structure Establishes baseline Change control system to avoid scope creep

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Plan for Quality Complete work according to specifications and standards Plan for assuring quality as project progresses Include  References for specifications and standards  Written procedures for quality tools and techniques Key aspects  Monitor as the project progresses  Do work right the first time rather than rework

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Create Work Breakdown Structure Deliverable-oriented hierarchical decomposition Organize project work and deliverables Create logical groupings Subdivide into more manageable components  Deliverable is output of work package  Resource requirements and durations can be assigned  Accountability can be assigned  Project manager can monitor and control Graphic chart or indentured list

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. WBS with Breakdown to Different Levels

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. WBS Graphic Chart Indentured List

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Assign Responsibility Responsibility assignment matrix  Designate responsible individuals  P = Primary responsibility  S = Support responsibility  Associates responsibility  For each work item  For each individual Only one primary per work item

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Define Activities Responsible resources define activities  Breakdown work packages to work items  Level needed to perform deliverable  May not be able to define all Comprehensive activity list  Not always require expenditure of effort  Could be wait time

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Sequence Activities Network diagram  Defines the sequence of activities and relationships  Tool for arranging order Common techniques  PERT  CPM  PDM

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Network Principles Activities  Represented by a box  Consume time  Described by verb Relationships  Linked in serial sequence  Complete concurrently

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Loops Illogical relationship among activities Perpetually repeats itself Not acceptable

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Laddering Ladder activities Allow for shortest possible time for completion Best use of the three workers and experts Set of repeating activities Serial sequence  One work  Two wait Can be performed at same time Would need triple resources

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Create Network Diagram Tips and Techniques Logical sequence of activities Show dependent relationships Elaborate as project progresses Use subnetworks for similar activity sequences and relationships Development of Diagram Questions to answer  Finish before next start?  Done concurrently?  Cannot be started next? Guidelines for detail level  Define each work package  Draw summary level network then add detail  Detail to responsibility or deliverable change  Duration less than project progress review

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Planning for Information Systems Development Definition Computer-based system  Accepts data as input  Processes the data  Produces useful information Examples  Computerized order entry  E-commerce  Automatic teller machines  Billing, payroll, and inventory Process Plan, execute, and control Systems Development Life Cycle  Problem definition  System analysis  System design  System development  System testing  System implementation

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. An IS Example: Internet Applications Development for ABC Office Designs ABC Office Designs Large number of sales representatives Sell office furniture to major corporations State assignments in four regions Management monitor state and regional sales Build Web-based IS system to track prices, inventory, and competition Project Project manager identified WBS follows SDLC Responsibility assignment matrix completed List of tasks compiled and predecessors identified Network diagram created

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. IS Example: WBS follows SDLC

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. IS Example: Responsibility Assignment Matrix

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. IS Example: Task List and Predecessors

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. IS Example: Network Diagram

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Project Management Information Systems Wide variety of systems available Plan and control projects in interactive mode Plan and test different options Create reports, diagrams, and charts Interface with other software applications Appendix A has additional information

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Critical Success Factors Plan the work and then work the plan. It is important to develop a plan before starting to perform the project. Taking the time to develop a well-thought-out plan is critical to the successful accomplishment of any project. Participation builds commitment. By participating in the planning of the work, individuals will become committed to accomplishing it according to the plan. The project must have a clear objective of what is to be accomplished. The objective should be defined in terms of end product or deliverable, schedule, and budget, and it must be agreed upon by the customer and the project team that will perform the project. The project scope document is valuable for establishing a common understanding and agreement among project stakeholders regarding the scope of the project. Having a quality plan at the outset of the project is extremely beneficial because it will help prevent incurring additional costs and schedule extensions due to rework caused by work and deliverables that fail to meet quality requirements and customer expectations. The key to quality control is to monitor the quality of the work early and regularly throughout the performance of the project, rather than waiting until all the work is completed before checking or inspecting for quality. The network diagram is also is a communication tool for the project team because it shows who is responsible for each activity and how each person’s work fits into the overall project.

© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S. Edition. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Summary The planning process is based on the project objective, which establishes what is to be accomplished. The project scope defines what needs to be done. The project scope document usually contains the customer requirements, statement of work, deliverables, acceptance criteria, and a work breakdown structure. The quality plan must include or reference the specifications, industry or government standards, and codes that must be used and met during the performance of the project work. The work breakdown structure establishes the framework for how the work will get done to produce the project deliverables. A responsibility assignment matrix defines who will be responsible for the work. Activities define more specifically how the work will get done. A network diagram defines the sequence of how and when the activities will be performed. Project planning is a critical activity in developing an information system (IS). A project management planning tool or methodology, called the systems development life cycle (SDLC), is often used to help plan, execute, and control IS development projects. Numerous project management information systems are available to help project managers plan, track, and control projects in a completely interactive way.