Power Industry Reform: expansion of investment opportunities London,October 12-13, 2005 Russia: going global Russian Trade and Investment Conference Vasily.

Slides:



Advertisements
Similar presentations
31 Mount Pleasant, London WC1X 0AD UK Tel Fax LONDON | BEIJING | PHILADELPHIA | WASHINGTON The Energy.
Advertisements

EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
29 September 2003, Moscow Anatoly Chubais Chief Executive Officer Unified Energy System of Russia Brunswick UBS Annual Investor Conference.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
2 PRESENTATION “ECONOMIC POLICY UNDER CONDITIONS OF REFORMING MARKET OF POWER AND ELECTRIC ENERGY AND IMPLEMENTATION OF INVESTMENT PROGRAM” Archangelskaya.
The Role of regulators in Energy security Sergey G.Novikov Head of Federal Tariff Service of Russian Federation Istanbul
World Forum on Energy Regulation IV Athens, Greece October , 2009 Regulatory challenge of Russian energy sector reform Dominique Fache, General.
Electricity Industry Deregulation in Taiwan I. Summary of the Framework of Electricity Industry Liberalization in Taiwan.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
7gld0786_template4 The Open Joint-Stock Second Generation Company of the wholesale electricity market OGK-2 _____________ UBS. NY. M2008.
Moscow February 13, 2007 Anatoly Chubais Chairman of the Management Board RAO UES of Russia Energy Industry: Retarding or Driving Force for Economic Advancement?
March 2012 © European Bank for Reconstruction and Development 2010 | Financing and investment in Russian power industry European Bank for.
Organizational Structure of RAO UES Executive Administration During Reform Period 22 March 2004.
EU – Russia Programme “Partnership for Modernization” and Its Role in the Technological Upgrade of the Russian Economy Elena Lenchuk (Institute of Economy,
RUSSIAN POWER. IN ANTICIPATION OF NEW PACES LONDON, INNOVATIONS IN THE RUSSIAN ELECTRIC POWER INDUSTRY. HOW TO ATTRACT INVESTMENTS? Pavel.
1 Speech by Mr. Y. Udaltsov, member of the Management Board of RAO «UES of Russia», at the seminar «Central and Eastern Europe: A source of Future Growth.
Electrical Equipment Park in in Russian Federation Russian Federation on the basis of Korean technology Project’s conception presentation Moscow Region.
RUSSIA POST ELECTIONS: GREAT EXPECTATIONS VIII ANNUAL INVESTOR CONFERENCE Moscow, Russia Speech of the Chairman of the Management Board of RAO.
Mosenergo June 2002 Mosenergo A Leader In The Russian Electricity Sector.
1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» to the 18th World Energy Congress (round table) Buenos Aires.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
1 RAO UES of Russia Anatoly Chubais, CEO European Policy Centre Brussels May 15, 2008 Russian Power Sector Reform: New Market opportunities for Russia.
Dr. Ion LUNGU AFEER President. DRIVERS FOR INVESTMENTS Demand; Fuel availability; Market signals; Production costs; Energy mix; Environmental concerns;
1 IFIEC Energy Forum 22 November 2011 Electricity.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
RAO UES of Russia: Investment Stage of the Reform 9th Russian Economic Forum London Anatoly Chubais Chairman of the Management Board RAO “UES.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
1 RAO UES Anatoly Chubais, CEO EEI International Utility Conference London, March 11, 2008 Power Sector Liberalization and Climate Change: The Russian.
RAO UES of Russia: Towards Economy Of Growth Through Reform Of Energy Sector Presented by A. B. Chubais Chairman of the Board, RAO UES of Russia Brunswick.
LENENERGO GENERAL OUTLOOK Transmission lines by voltage less than 220 kV 97% 330 kV 1% 220 kV 2% The largest power company in the North-West Russia.
Russian power sector reform Presentation by Anatoly Chubais, Chief Executive Officer, RAO UES of Russia 19 June 2001Moscow.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» October 2001Moscow.
VYACHESLAV SINYUGIN Deputy CEO Unified Energy Systems of Russia 15 November 2002 Boston.
Conference “RAO “UES of Russia” is an Open Company. On the Threshold of the Reform” 11 December,2001 Moscow Vice-Chairman of the Management Board, RAO.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Power Sector Reform in Russia: Results and Steps Forward Y.A. Udalcov, Board Member, Head of the Reform Management Centre JSC “Unified Energy System of.
PRESENTATION FOR INVESTORS Unified Energy System of Russia.
RAO UES Reform: Investments, Market, Structural Transformation UBS Conference Moscow September 13, 2006.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
Carbon Finance and Corporate Strategy Vladimir Litvak, Head, New Power Projects, SUEK Moscow April 28, 2008.
Regulation on long-term capacity market
1 Anatoly Chubais Chief Executive Officer RAO UES of Russia Verbund-Conference – ENERGY Fuschl, Austria The Future of the Power Industry:
BB&T Capital Markets 10 th Annual Commercial & Industrial Investor Conference March 23, 2016.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
RUSSIAN DOMESTIC GAS MARKET Dr. Tatiana Mitrova 21 June, th Annual IAEE International Conference Bergen, Norway 420 West 118 th Street, New York.
1 Regulatory Participation & Communication Workshop October 26-27, 2005, Hotel Rus, Kiev, Ukraine Nikolay Minkov Chairman, Energy & Utilities Committee,
ELECTRICITY MARKET IN BULGARIA an attempt for realistic point of view Lubos Pavlas Regional manager of CEZ for Bulgaria Sofia,
GEORGIAN ELECTRICITY MARKET OPERATOR
CONSUMER ISSUE: Factoring consumer concerns into the public interest
in the Russian Federation
Overview on Renewable energy in Bulgaria
Power Industry Reform: expansion of investment opportunities
Long-term Capacity Market
Chief Executive Officer RAO “UES of Russia”
Presentation transcript:

Power Industry Reform: expansion of investment opportunities London,October 12-13, 2005 Russia: going global Russian Trade and Investment Conference Vasily Zubakin, Board Member, OAO RAO «UES of Russia»

1 Table of Contents  Share of OAO RAO “UES of Russia” price dynamics  UES is undervalued  Structure of Russian Power Sector in 2008: Target sector model  Power Market Development  New Value Challenges: bringing new companies to the stock market  Investment opportunities

2 Share of OAO RAO “UES of Russia” price dynamics 21.40% (1)Приведен к цене акций РАО «ЕЭС» на начало периода % US cents (1) 18.7% 2

3 Reasons: UES is undervalued EV/Installed capacity, $/kW Enel Endesa Cemig RAO UES $/kW E.On CEZ Electrobras Complicated reform model Uncertainty regarding terms and rules for liberalization and operation of wholesale power market Uncertainty regarding government’s intentions to reduce control over generating assets Long period of anticipation of the launch of target companies on stock market

4 MonopoliesCompetitive Power Generation Target Power Sector Model Private shareholders Government FGC (Transmission) <25% >75% Other generating companies Independent Regional Energos Nuclear power generating company Hydro GenCo (1) Wholesale GenCos (6) Territorial GenCos (14) 51-60%<48% 75-85% 49-40% 25-15% >52% System operator <25% >75%>75% IDC (Distribution) (4) <48% >52% Competitive market FGC – Federal Grid Company IDC – Interregional Distribution Company > 49% Supply companies

5 Будущая стоимость энергетических активов Overall value of target companies will grow Factors of growth: ОГК-1, 2, 4ОГК-3ОГК-5 ОГК-6 ОГК-7 ОГК ТГК МРСК ТГК-14 ТГК-1,13 ТГК-4,6 ТГК-2, 5,8 ТГК-7,10 ТГК-3 ТГК-9 МРСК 1,2,3, RTS STOCK EXCHANGE Gradual liberalization of power market Effective management, cost- cutting, key performance indicators, motivation Boost of liquidity: listing on market, listing of ADRs and other derivatives on international markets. Effective IR. High standards of corporate governance

6 Investment opportunities (1) Required Capacity – Optimistic Scenario (2) Required Capacity – Pessimistic Scenario (3) Available Capacity TPP NPP HPP gW Required vs. Available Capacity in Russia Investments needs of electric power industry Before 2015 investments necessary for new construction, modernization and maintenance of existing assets amount to 48 – 65 billion US dollars: up to 20 billion dollars to modernize and increase the operating life of the existing assets 28 – 44 billion US dollars to commission new capacities

7 The goal is to attract investments into new capacities construction to cover the forecasted power deficit before the competitive power market starts functioning Investment guarantee mechanism Government identifies the area of the deficit Investor selection is competitive Requirements – Exclusively new modern equipment – Standards for efficiency, flexibility, environmental safety Investor’s compensation for technology reserve included in to the tariffs of System Operator – Central Dispatch Administration Consumer starts paying only after the object is commissioned Protection mechanism is effective for 10 years. Two-stage mechanism of investment repayment: –Construction investment repayment through payment for capacity reserve formation services –Payment for power generated at a price not higher than the set tariff The investor it is obliged to give after the conclusion of the contract financial guarantees for the period of construction and operation Investor’s obligations upon the agreement conclusion: –Financial guarantees for the period of construction and operation –Availability of all the power in the market Participation of the investor in the market –Adjustable contracts -only payment for electric power –do not participate in free bilateral contracts –do not participate on the market of capacity –participate in the market of system services in accordance with general practice Investments Power tariffs Ministries and agencies Guaranteed payments (investments repayment) System Operator Investors Customers Generation Bidding procedure Trade System Administrator Payment for electric power Federal Tariff Service Capacity Payments The organization of competitions Payment for electric power

Thank you for your attention