NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.

Slides:



Advertisements
Similar presentations
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
Advertisements

NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Real Time Mitigation During Exceptional Fuel Cost Events.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
ERCOT RMR Basics Ino González Supervisor, S&B Market Analysis.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
Resource Cost Working Group October 7, 2015 WMS Update.
Resource Cost Working Group December 2, 2015 WMS Update.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
M2:Shortened RTM Settlement Timeline Vanessa Spells CWG/MCWG Meeting April 24, 2013.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1 Cutover Daily Call 10:30 AM November 23, :30.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Settlement Update Austin Rosel ERCOT February 27, 2017.
Exceptional Fuel Costs in LMP
Resource Cost Working Group
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Resource Cost Working Group
Presentation transcript:

NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013

QSGR Settlement

QSGR: Decision on ME & Fuel Adder NPRR485 allowed for all resources to submit for verification actual fuel purchases to be included as a “fuel adder” to the MOC; however, this language was grey boxed until system implementation. NPRR485 changed the “Variable O&M” for QSGRs to include a minimum energy component and the “fuel adder” based on verified fuel by resource. Because ERCOT manually updates the MOC for the QSGR, the stakeholders decided ERCOT should include the “fuel adder” for QSGR. ERCOT requests a decision from stakeholders: What should be included in the MOC for the QSGR that is online with base points and receives a manual Override from the ERCOT operator to hold to an output level for reliability? Option 1: IHR + O&M (like non QSGR resources) Option 2: IHR + O&M + Min energy + fuel adder (proposed)

QSGR: Decision on Override NPRR511 proposed that QSGR under ERCOT operator control be compensated under with the variable O&M removed. The stakeholders approved this at PRS In reviewing ERCOT Operator desk procedures it was discovered that if the Operator needs a QSGR that is not receiving base points to come online for solving a contingency or voltage support, they are Overriding LDL to a level greater than or equal to LSL. ERCOT requests a decision from stakeholders: How should ERCOT compensate the QSGR that is not online with base points and is needed online at LSL by the ERCOT operator for reliability? Option 1: Manual Override (Emergency Energy payment) Option 2: Deploy Non-Spin (not Emergency Energy payment) Option 3: RUC VDI (RUC)

QSGR: Decision on Amortization The Verifiable Cost manual currently amortizes the Variable O&M into the QSGR IHR (MOC) each month based on the higher of Minimum online time per RARF; or, 2 hours; or, the average actual online time of the QSGR per 20 days in the month prior to the effective month. Proposed VC Manual change requests that the average actual online time be reduced by any hours that the QSGR has a manual override or is deployed for Non Spin. (This will increase the MOC) ERCOT requests a decision from stakeholders: Should ERCOT reduce the online hours used in the amortization of the variable O&M for any hours that the QSGR is online with a manual override or due to Non-Spin deployment? Option 1: No change continue with all online hours Option 2: Remove hours when online due to manual override and no base points Option 3: Remove hours when deployed for Non-spin Option 4: Remove hours for Option 2 & 3