ALCPG software: status and future plans LCWS UT Arlington October 23, 2012 Norman Graf (for the sim/reco group)

Slides:



Advertisements
Similar presentations
LCFI physics studies meeting, 28 th June 05 Sonja Hillertp. 1 Report from ILC simulation workshop, DESY June Aim of workshop: preparation for Snowmass;
Advertisements

1 Benchmarking the SiD Tim Barklow SLAC Sep 27, 2005.
Simulating SiD for the LOI Norman Graf (SLAC) SiD Phone Meeting July 30, 2008.
Slic A Geant4-based detector simulation package Norman Graf, Jeremy McCormick SLAC October 15, 2009.
Lcsim A Java-based Reconstruction package for Particle Physics Tony Johnson on behalf of Norman Graf SLAC Scientific Computing Workshop June
Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
Computing plans for the post DBD phase Akiya Miyamoto KEK ILD Session ECFA May 2013.
SiD Software Status. Framework Overview Pythia, WHIZARD, etc. Pythia, WHIZARD, etc. SLIC Tracking, PFA, etc. LCSim StdHep LCIO Events JAS3 (or any AIDA.
Simulating the Silicon Detector August 16, 2005 Norman Graf SLAC.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ALCPG Software Status: Simulation & Reconstruction Norman Graf (for the sim/reco team) LCWS 2010, Beijing March 27, 2010.
HCAL and PFA Studies Ray Cowan Peter Fisher ALCPG 2009 University of New Mexico October 2, 2009.
ALCPG Simulation Status and Plans ECFA LC Workshop, Durham Sep. 2, 2004 Norman Graf (SLAC)
ALCPG Simulation Status and Plans ACFA LC Workshop, Taipei Nov. 10, 2004 Norman Graf (SLAC)
ALCPG Software Tools Jeremy McCormick, SLAC LCWS 2012, UT Arlington October 23, 2012.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
1 Tracking Reconstruction Norman A. Graf SLAC July 19, 2006.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
Org.lcsim Reconstruction and Analysis framework for ILC Detectors Tony Johnson SLAC July 2006.
Implementing a dual readout calorimeter in SLIC and testing Geant4 Physics Hans Wenzel Fermilab Friday, 2 nd October 2009 ALCPG 2009.
SiD Tracking Simulation: Status and Plans Richard Partridge for the SiD Tracking Group Vancouver Linear Collider Workshop July 19-22, 2006.
David N. Brown Lawrence Berkeley National Lab Representing the BaBar Collaboration The BaBar Mini  BaBar  BaBar’s Data Formats  Design of the Mini 
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Simulation and Reconstruction: ALCPG Framework & Toolkit Norman Graf (for the ALCPG Simulation & Reconstruction Team) ILC Software and Tools Workshop May.
Lcsim: Simulation and Reconstruction ACFA ILC Meeting Daegu, Korea April 24, 2012 Norman Graf (for the sim/reco group)
Summary of Simulation and Reconstruction Shaomin CHEN (Tsinghua University)  Framework and toolkit  Application in ILC detector design Jupiter/Satellites,
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
ALCPG Software Framework Overview & Updates Jeremy McCormick, SLAC SiD Group ALCPG 2009.
Sim/Recon DBD Editors Report Norman Graf (SLAC) Jan Strube (CERN) SiD Workshop SLAC, August 22, 2012.
Norman Graf (SLAC) Software Software KILC12, Daegu, Korea.
Some Thoughts about Hits, Geometry etc Rob Kutschke, Hans Wenzel Fermilab March 13, 2007.
ILC DBD Common simulation and software tools Akiya Miyamoto KEK ILC PAC 14 December 2012 at KEK.
SiD performance for the DBD Jan Strube CERN. Overview Software Preparation (CERN, SLAC) Machine Environment (CERN, SLAC) Tracking Performance (C. Grefe)
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
SiD Simulation & Reconstruction Norman Graf (for the sim/reco team) LCWS 2010, Beijing March 28, 2010.
Software tools and Computing Akiya Miyamoto KEK 29-September-2006 At FJPPL meeting.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Lcsim software: status and future plans ECFA-LC DESY May 28, 2013 Norman Graf (for the sim/reco group)
25 Oct 2007Jeremy McCormick, ALCPG MC1 ALCPG Monte Carlo Framework.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD PFA Meeting 27 August Status report on SiD global parameters study and PFA activities at MIT Ray Cowan Peter Fisher 27 August 2009.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
Calorimeter Simulation Infrastructure Norman Graf Arlington ‘03.
Benchmarking Production Jan Strube (CERN) for the SiD Production team.
SiD LOI Benchmark Simulation and Reconstruction Norman Graf (SLAC) LCWA09, Albuquerque September 30, 2009.
Mark Thomson University of Cambridge High Granularity Particle Flow Calorimetry.
Linear Colliders in the HSF Jan Strube (PNNL) 1. Introduction Large Data rates (comparable to Belle-II) ~ 18 PB / year raw data at nominal running at.
Slic A Geant4-based detector simulation package Jeremy McCormick, Norman Graf, Ron Cassell, Tony Johnson SLAC June 8, 2006.
SiD Tracking in the LOI and Future Plans Richard Partridge SLAC ALCPG 2009.
Lcsim Status for Muon Collider Physics and Detector Studies Norman Graf (SLAC) MAP 2012 Winter Meeting SLAC, March 8, 2012.
Lcsim software: status and future plans ECFA-LC DESY May 30, 2013 Norman Graf (for the sim/reco group)
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
Intelligent Norman Graf (SLAC) (for the ALCPG Simulation & Reconstruction WG) Muon Collider Simulation Technical Meeting October 5, 2010 DesignDetector.
Status of the ALCPG simulation & reconstruction Norman Graf (SLAC) TILC09, Tsukuba April 19, 2009.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Data Model: LCIO to LCIO2.0 Norman Graf (SLAC) ILC-CLIC Software, CERN May 28, 2009.
Optimizing SiD for the LOI: Simulation and Reconstruction Norman Graf (for the ALCPG Simulation & Reconstruction Team) October 9, 2007.
Track Reconstruction: the ftf and trf toolkits Norman Graf (SLAC) Common Software Working Meeting CERN, January 31, 2013.
SiD: Simulation and Reconstruction
Final CALICE OsC meeting: Status and summary of project
Norman Graf SiD Workshop, Eugene November 15, 2010
slicPandora: slic + pandoraPFANew
Markus Frank CERN/LHCb CHEP2013, Amsterdam, October 14th–18th 2013
lcsim: Physics & Detector Simulations
ILD Optimisation: towards 2012 University of Cambridge
Linear Collider Simulation Tools
Linear Collider Simulation Tools
Presentation transcript:

ALCPG software: status and future plans LCWS UT Arlington October 23, 2012 Norman Graf (for the sim/reco group)

The DBD and beyond ILC DBD has been the primary focus of our group –Will hear a number of talks presenting the status of our DBD efforts –A lot of work done by a small number of dedicated individuals who deserve a lot of credit. Have also been supporting the needs of HPS –real data requirements mostly orthogonal to MC challenge, but will be useful for upcoming Ecal TB Gearing up to support Snowmass 2013 efforts Looking forward to common software development 2

DBD Deliverables Results expected for inclusion in DBD –Full simulation of realistic detector design including support structures. –Overlay of correct admixture of expected beam- related backgrounds. –Full tracker hit digitization and ab initio track finding and fitting. –Digital RPC signal simulation, including cross-talk, noise & inefficiencies. –Full reconstruction using slicPandora & LCFIVertex (LCFIPlus if available) 3 

The Grid SiD is making full use of Grid via ILCDirac. LCG and OSG ILC VOs merged Identifying OSG resources and making good use of them has been a challenge. –very idiosyncratic –large, steep and site-dependent learning curve But when it works it works very well. See talk by Jan Strube. 4

Snowmass The APS DPF will host a meeting in Minneapolis in the late spring of next year (SnowMiss). The ALCPG sim/reco group will be providing support for physics and detector studies to be conducted leading up to and during the ~one week workshop. To facilitate studies by new groups and individuals we need to make things as easy as possible to generate or access detector designs and MC events. Will use the DBD experience as a guide, but will need to further optimize, automate and robustify processes.

Snowmass Will start by thoroughly documenting DBD and related event samples and provide easy access. Can’t expect everyone to have Grid credentials or belong to the correct VO. Will provide access to DBD and related event samples via ftp from SLAC nfs disks. Hope that benchmark analysis code is released, forming an example for analysis workflow. Would also help ILC community in our next TLA. Will work with physics groups to make sure event samples, when generated, have common characteristics (e.g. parton evolution)

Snowmass Will need to document standard MC event generation and make sure it is robust. Resurrecting and improving fastMC code and functionality Documenting procedures for defining and characterizing new detectors. Identifying resources to be used for this exercise

and beyond… Techniques developed for ILC and CLiC can also be used for Muon Collider studies. Some additions to slic and GeomConverter specific to MuC –e.g. tapered endcap calorimeters Background overlay and timing cut functionality developed and tested at CLiC directly applicable. Will support MuC studies leading up to and at the Snowmass 2013 meeting. 8

and further beyond… Software workshop at CERN identified issues of common concern to the LC community. General consensus to work towards a common simulation application Work closely with other efforts (e.g. AIDA WP2) Activity to begin in earnest after DBD production. 9

Other users HPS experiment at Jlab has adopted the lcsim software for its simulation and reconstruction. Test run took place earlier this year. Real data places different requirements on both the simulation and reconstruction software. –Conditions database improved –Full 3D field map being implemented –Runge-Kutta stepper implemented –Alignment code being implemented –… 10

Simulating the HPS ECal Crystal array geometry and readout is supported in the compact format. Silicon tracker modules individually definable and positionable. 11

12 Wired Event Display

mesh2gdml Convert STL facets directly to G4TriangularFacet and create G4TessellatedSolid. Assign material at creation time, e.g. > java StlToGdml model.stl model.gdml Aluminum Can either create world volume from bounding box to use standalone, or leave as individual volume to aggregate or incorporate into a common world volume later. Work in progress on GUI to aid translation process, allowing user to select volume and: –Delete unwanted volumes –Assign material by name (prone to mistake, e.g. Aluminum vs Aluminium) from drop-down list (predefined, e.g. NIST or G4_*) from material editor –Create hierarchy and place volumes into it. –Associate sensitive detectors? … 13

CAD-imported elements. 14 Current workflow only supports tesselated volumes. Wireframe showing tesselation Increase in geometry size Increase in CPU time.

Summary Large amount of work done to complete the DBD. –Benefitted enormously from the CLiC CDR effort Reconstruction of high energy and high background events Automation of Grid submission of jobs –Still some work to be completed. Next milestone is Snowmass2013 Code also being used by HPS, focus on real data Looking forward to working towards achieving the goals set forth at the CERN common software meeting. –Need to plan the next software working meeting 15