Chapter 7: Stochastic Inventory Model Proportional Cost Models: x: initial inventory, y: inventory position (on hand + on order-backorder),  : random.

Slides:



Advertisements
Similar presentations
ISEN 315 Spring 2011 Dr. Gary Gaukler. Inventory Control Deterministic inventory control Stochastic inventory control MRP / Lot sizing / JIT Supply chain.
Advertisements

Inventory Control Models
ISEN 315 Spring 2011 Dr. Gary Gaukler. Lot Size Reorder Point Systems Assumptions –Inventory levels are reviewed continuously (the level of on-hand inventory.
1 K  Convexity and The Optimality of the (s, S) Policy.
Markov Decision Processes (MDPs) read Ch utility-based agents –goals encoded in utility function U(s), or U:S  effects of actions encoded in.
Module C6 Other EOQ Type Models.
Chapter 5 Finance Application (i) Simple Cash Balance Problem (ii) Optimal Equity Financing of a corporation (iii) Stochastic Application Cash Balance.
Chapter 5 Inventory Control Subject to Uncertain Demand
6 | 1 Copyright © Cengage Learning. All rights reserved. Independent Demand Inventory Materials Management OPS 370.
Q. 9 – 3 D G A C E Start Finish B F.
Inventory Control Chapter 17 2.
Inventory Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 17 Inventory Control 2.
DOM 511 Inventory Control 2.
1 Chapter 15 Inventory Control  Inventory System Defined  Inventory Costs  Independent vs. Dependent Demand  Basic Fixed-Order Quantity Models  Basic.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Inventory Control – IV Multiperiod Probabilistic Demand:
Inventory Control IME 451, Lecture 3.
1 Supply Chain Management: Issues and Models Inventory Management (stochastic model) Prof. Dr. Jinxing Xie Department of Mathematical Sciences Tsinghua.
Operations Management
1 Outline  single-period stochastic demand without fixed ordering cost  base-stock policy  minimal expected cost  maximal expected profit  (s, S)
© 2015 McGraw-Hill Education. All rights reserved. Chapter 18 Inventory Theory.
1 Outline  multi-period stochastic demand  base-stock policy  convexity.
In this handout Stochastic Dynamic Programming
Chapter 19 Probabilistic Dynamic Programming
Inventory Control Inventory: A stock of materials kept for future sale or use.
1 Material Management Class Note # 3-A ( In review ) ~ Inventory control, analysis, and management ~ Prof. Yuan-Shyi Peter Chiu Feb
Operations Management Inventory Management Chapter 12 - Part 2
1 ANALYSIS OF INVENTORY MODEL Notes 2 of 2 By: Prof. Y.P. Chiu 2011 / 09 / 01.
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
1 ANALYSIS OF INVENTORY MODEL Notes 1 of 2 By: Prof. Y.P. Chiu 2011 / 09 / 01.
Analysis of Supply Contracts with Total Minimum Commitment Yehuda Bassok and Ravi Anupindi presented by Zeynep YILDIZ.
Chapter 5 Inventory Control Subject to Uncertain Demand
Chapter 6 APPLICATIONS TO PRODUCTION AND INVENTORY Hwang, Fan, Erickson (1967) Hendricks et al (1971) Bensoussan et al (1974) Thompson-Sethi (1980) Stochastic.
Chapter 13 Stochastic Optimal Control The state of the system is represented by a controlled stochastic process. Section 13.2 formulates a stochastic optimal.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
INVENTORY SYSTEMS. Assume periodic review, i.i.d. random demands, constant (possibly non-zero) lead times and full backlogging. When to order? How much.
1 Inventory (Chapter 16) What is Inventory? How Inventory works: two ways of ordering based on three elements Inventory models (to p2) (to p3) (to p4)
Stochastic Inventory Theory Professor Stephen R. Lawrence Leeds School of Business University of Colorado Boulder, CO
ISEN 315 Spring 2011 Dr. Gary Gaukler. Review: Prototype LP Problem Desk manufacturer Regular and rolltop desks, made of wood Regular: 20 sqft pine, 16.
Graduate Program in Business Information Systems Inventory Decisions with Certain Factors Aslı Sencer.
Operations Management
ECES 741: Stochastic Decision & Control Processes – Chapter 1: The DP Algorithm 1 Chapter 1: The DP Algorithm To do:  sequential decision-making  state.
CHAPTER 12 Inventory Control.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
5-1 ISE 315 – Production Planning, Design and Control Chapter 5 – Inventory Control Subject to Unknown Demand McGraw-Hill/Irwin Copyright © 2005 by The.
1 Inventory Control with Stochastic Demand. 2  Week 1Introduction to Production Planning and Inventory Control  Week 2Inventory Control – Deterministic.
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
Chapter 12 : Inventory Management Outline  The Importance of Inventory  Functions of Inventory  Types of Inventory.
ECES 741: Stochastic Decision & Control Processes – Chapter 1: The DP Algorithm 31 Alternative System Description If all w k are given initially as Then,
Example A company purchases air filters at a rate of 800 per year $10 to place an order Unit cost is $25 per filter Inventory carry cost is $2/unit per.
Managing Inventory Of Items with Replacement Warranty Vidyadhar Kulkarni * Joint Work with Wei Huang **, Jayashankar Swaminathan * * University of North.
4 COORDINATED REPLENISHMENTS cyclic schedules powers-of-two policies.
Supply Contracts with Total Minimum Commitments Multi-Product Case Zeynep YILDIZ.
© Wallace J. Hopp, Mark L. Spearman, 1996, EOQ Assumptions 1. Instantaneous production. 2. Immediate delivery. 3.
1 Managing Flow Variability: Safety Inventory Operations Management Session 23: Newsvendor Model.
OPTIMAL POLICIES FOR A MULTI- ECHELON INVENTORY PROBLEM ANDREW J. CLARK AND HERBERT SCARF October 1959 Presented By İsmail Koca.
© The McGraw-Hill Companies, Inc., Chapter 14 Inventory Control.
© The McGraw-Hill Companies, Inc., Inventory Control.
1 Resource-Constrained Multiple Product System & Stochastic Inventory Model Prof. Yuan-Shyi Peter Chiu Feb Material Management Class Note #4.
Chapter 17 Inventory Control
Dynamic Lot Size Models
SIMULATION EXAMPLES INVENTORY SYSTEMS.
EOQ Model 2/26/2016.
Linear Systems November 28, 2016.
Optimal Level of Product Availability Chapter 13 of Chopra
The Economic Order Quantity
SIMULATION EXAMPLES INVENTORY SYSTEMS.
Operations Research Lecture 12.
EOQ Inventory Management
Solving a System of Linear Equations
Presentation transcript:

Chapter 7: Stochastic Inventory Model Proportional Cost Models: x: initial inventory, y: inventory position (on hand + on order-backorder),  : random demand,  (  ),  (  ), (y-  ) + : ending inventory position, N.B.L, (y-  ) : ending inventory position, B.L,  =1/(1+r) : discount factor, ordering cost : c(y-x), holding cost : h (y-  ) + penalty cost : p(  -y) + salvage cost : -  s(y-  ) +

Minimum cost f(x) satisfies: L(y) convex, L’(  ) < -c (otherwise never order) L′ eventually becomes positive

Example c=$1, h=1¢ per month,  =0.99, p=$2(NBL), p=$0.25(BL), s=50 ¢, c+h-  s=51.5 ¢, NBL: p-c = 100 ¢, BL: p-c(1-  )=24 ¢,

Set up cost K L(x) if we order nothing K+c(S-x)+L(S) if we order upto S If we order, L’(S)+c=0. Use the cheaper of alternatives L(x) and K+ c(S-x)+L(S) Sx cost L(x) K K sSx L(x)+cx c s K+c(S-x)+L(S)

Two-bin or (s,S) policy order S-x if x ≤ s order nothing if x > s Multiperiod models Infinite Horizon (f 1000 & f 1001 cannot be different)

Taking derivative of {} If f convex, find S the base stock level, then for x ≤ S We see from (11) that f’(x)=-c for x ≤ S. (12)

Proportional costs: So that

Example 4:

Example 5:

Intuition: The current period would be a separate one period if we know what the next period would be willing to pay for our leftover inventory. Assuming we are not “overstocked”, every unit leftover will mean the next period will order one less, thus saving c. So the next period should be willing to pay c per unit in salvage for one leftover inventory.

Multiperiod models: No Setup Cost Begin with two periods Demand D 1, D 2, i.i.d Density:  (  ) L(y) = expected one period holding+ shortage penalty cost; strictly convex with linear cost and  (  ) >0, c purchase cost /unit c 1 (x 1 ) optimal cost with 1 period to go; c+L’(S 1 )=0 while S 1 is the optimal base stock level.

Example: c=10, h=10, p=15 the demand density is Solution:

Multi-Period Dynamic Inventory Model with no Setup Cost C n (x n ): n periods to go,  : discount factor. DP equations:

Multi-Period Dynamic Inventory Model with Setup Cost

Multi-Period Dynamic Inventory Model with Lead Times Lead time: