Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.

Slides:



Advertisements
Similar presentations
Project management software is a term covering many types of software, including scheduling, cost control and budget management, resource allocation,
Advertisements

Facilitated by Joanne Fraser RiverSystems
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Systems Analysis and Design 9th Edition
3-1 Planning the Project. 3-2 If a Problem Occurs During a Project Is It Most Likely Due to: 4 A) Poor Execution 4 B Poor Planning.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
MEM 612 Project Management Chapter 3 Planning the Project.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Chapter 5: Project Scope Management
OPERATIONS MANAGEMENT for MBAs Fourth Edition
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Gantt Charts Trisha Cummings. The History Henry Laurence Gantt's legacy to management is the Gantt chart. Henry Laurence Gantt ( ) was a mechanical.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Project Management Lecture 5+6 MS Saba Sahar.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Work breakdown structure
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Year 11 Info Tech Project Management Overview. Project management overview identifying tasks, resources, people and time scheduling tasks, resources,
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
What’s a Project? AD642. Copyright 2011 John Wiley & Sons, Inc. Why the Emphasis on Project Management? 2 ❑ Many tasks do not fit neatly into business-as-usual.
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Lecture 11A.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Geog 469 GIS Workshop Project Management.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Request for Proposal (RFP)
Statement of the Work SOW By: Wilmer Arellano FIU Summer 2007 (Updated)
By Wilmer Arellano Fall 2009
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Statement of the Work SOW
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 3 Managing the Information Systems Project
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
SOW / Open Workbench By Wilmer Arellano Fall 2010.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Team-Based Development ISYS321 Managing the Information Systems Project.
SOW / Open Workbench By Wilmer Arellano Fall 2010 Wilmer Arellano © 2010.
WBS Work Breakdown Structure © Unitec New Zealand.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
SOW / Open Workbench By Wilmer Arellano Fall 2008.
WEEK 3 Project Planning.
The Project Management Process Groups
Information Technology Project Management, Seventh Edition.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
By Wilmer Arellano Spring 2010
Request for Proposal (RFP)
Project Management Process Groups
Chapter 3 Managing the Information Systems Project
Project management Learning Unit 5.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Modern Systems Analysis and Design Third Edition
By Wilmer Arellano Fall 2010
By Wilmer Arellano Summer 2013
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007

Overview  Strategy Plan of Action Statement of Work (SOW) Work Breakdown Structure (WBS) Project Milestones Results Evaluation

References Some Excerpts from the book:  Karl T Ulrich and Steven D. Eppinger. (2004). Product Design and Development. Third Edition. Mc Graw Hill, Irwin. ISBN-13: Some Excerpts from the book  “Engineering Design, a Project Based Introduction”, second edition by Clive I. Dym and Patrick Little. John Wiley and Sons, Inc. ISBN us/assistance/HA aspx#Step%201

Project management Project development involves many people completing many different tasks. Project management is the activity of planning and coordinating resources and tasks to achieve these goals.

Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle. Certain areas that need to be addressed are as follows:  Scope of Work, Describes the work to be done in detail and specifies the hardware and software involved and the exact nature of the work to be done.  Location of Work, Describes where the work is to be performed. Specifies location of hardware and software and where people will meet to perform the work.  Period of Performance, This specifies the allowable time for projects, such as start and finish times.  Deliverables Schedule, This part list the specific deliverables, describing what and when it is due.  Who is responsible for what.

Work Breakdown Structure (WBS) The WBS is the hierarchical list of the project's phases, tasks and milestones  Phase: A group of related tasks that completes a major step in a project.  Task: An activity that has a beginning and an end. Project plans are made up of tasks.  Milestone: A reference point marking a major event in a project and used to monitor the project's progress. Scope: The combination of all project goals and tasks, and the work required to accomplish them.  The scope translates into the timeline and budget. Budget: The estimated cost of a project. us/assistance/HA aspx#Step%201

Work Breakdown Structure (WBS) The WBS may describe:  the activities of the project or Activities speak to the work involved in the project,  of its deliverables. Deliverables speak to end results. If activities, then the WBS is expressed by sentences commencing with verbs, but if deliverables, then the entries are expresses as nouns. We will base our WBS on deliverables. Please make that clear in your WBS

Work Breakdown Structure (WBS) The 100% rule  The rule applies at all levels within the hierarchy: the sum of the work at the “child” level must equal 100% of the work represented by the “parent” and the WBS should not include any work that falls outside the actual scope of the project, that is, it cannot include more than 100% of the work  The best way to adhere to the 100% Rule is to define WBS elements in terms of outcomes or results. The Practice Standard for Work Breakdown Structures (Second Edition), published by the Project Management Institute (PMI)Project Management Institute k_breakdown_structure

Work Breakdown Structure (WBS) This is what we want Deliverables based WBS tructure

Possible Research (Missing Percentages)

Understanding and Representing Tasks The tasks are represented by boxes, and the information (data) dependencies among the tasks are represented by arrows. We refer to this representation as  information-processing view or a  data-driven perspective of product

Documenting (WBS) You need to describe the phases Phase 1.1-Antenna Design  Objective: To produce a 50 Ohm input impedance antenna with a power handling capability of 100 Watts with minimum cost and a minimum power gain of 3 dB  Approach: Two method will be used and compared to select the more economical design. Method 1 will consist of the recently acquired Antenna Design Software and method 2 will be based on newly published formulas by A. Jones [4]  Expected Results: A fully functional transmit antenna with accompanying literature and mounting hardware. This phase will consist of the following tasks:  Antenna Design  Antenna Construction  Antenna Testing Remember this is a deliverable based description

Documenting (WBS) We don’t require it in this course but in real projects a full descriptions of the tasks is required. Subtask 2c-Technology Research  Objective: The criteria from subtask 2b will be used to evaluate the technologies, but it is necessary to understand each technology properly in order to properly evaluate it. Research will thus be done to attempt to understand each of the technologies in the group’s list.  Approach: Resources such as the internet, library, university faculty, and anything else available to the group will be used to obtain as much information on each technology as possible.  Expected Results: A complete understanding of all the available technologies by each member of the group should result from the research done during this subtask. This is the right approach. In our case it could make the proposal to long. If that is the case, instead of describing Objective, approach and expected results for the tasks, do it for the phases and list the tasks involved. Remember this is a deliverable based description

Project Timeline/ Sequential Tasks Tasks are sequential when they are dependent on the output of another task. These because the dependencies impose a sequential order in which the tasks must be completed. We do not necessarily mean that the later task cannot be started before the earlier one has been completed

Project Timeline/ Parallel task Two tasks are parallel when they are both dependent on the same task but are independent of each other.

Project Timeline/ Coupled tasks Coupled tasks are mutually dependent; each task requires the result of the other tasks in order to be completed. Coupled tasks either must be executed  simultaneously with continual exchanges of information or  must he carried out in an iterative fashion.

Gantt Charts The traditional tool for representing the timing of tasks is the Gantt chart. The filled-in portion of each bar represents the fraction of the task that is complete. The vertical line shows the current date, so we can observe directly that task D is behind schedule, while task E is ahead of schedule.

Gantt Charts (Open Workbench)

Milestones Examples:  Prototype Implementation.  Testing.  Documentation.  Demonstration. Each Milestone should be explained with a sentence or two

BUDGET (Task Cost)

BUDGET

Review Strategy  Plan of Action  Statement of Work (SOW)  Work Breakdown Structure (WBS)  Project Milestones  Results Evaluation

Software Primavera Open Workbench MS Project

& & Q uestions A nswers