Integrated Operations SIG: Distributed Temperature Survey Data Transfer Standard Paul Maton (POSC)

Slides:



Advertisements
Similar presentations
ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Advertisements

SPE WITSML: Technology to Business (T2B) for the Oilfield J
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Priority Project Update PSSD-CIO Joint Council Meeting Lac Carling, May 28, 2003 Service Delivery to Business and Mapping.
Chapter9 Introduction to Information Technology Turban, Rainer and Potter John Wiley & Sons, Inc. Copyright 2005.
Iterative development and The Unified process
EU Vigilance New Manufacturer Incident Report Form Piloting arrangements.
In collaboration with Building XML for Daily Drilling Report Arnt Vegard Espeland October 2006.
1 General Well Message Operations Report Real Time Wellbore Wellbore Geometry Risk Directional Drilling Systems Tubular / Bit Record BHA Run Fluids Systems.
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Joint Business Plan Madhurjya K. Dutta 1mk_dutta Sept 2010.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
Speaker Introduction John Shields Software Projects Manager, Baker Hughes, Aberdeen 30 years working for Baker Hughes 30 years working for Baker Hughes.
Web Development Process Description
Geophysics Special Interest Group (SIG) Paul Maton, Sillimanite Consultants & Energistics Western Europe Region & SIG Meeting Stavanger, Norway 17 June,
Copyright © 2004 TietoEnator Corporation Production Reporting - at the NCS and beyond POSC SIG meeting Aberdeen, 20th of June 2006 Oddvar Nesse, TietoEnator.
1 Global Unique Well Identifier (GUWI) Initiative Progress Report POSC SIG, Aberdeen, 4 April 2005 Authoring Team: John AdamsConocoPhillips Alan DonigerPOSC.
VALERIE MATHIEU PAPER NO. 13 Presented By Jared Norrell Service strategies within the manufacturing sector: Benefits, costs and partnership.
POSC Regional SIG Seminar New Delhi, January 14, 2005.
PLANNING RSTWG Review of Planning Concept of Operations & Requirements Tasks.
PSCIOC XML Subcommittee Status Update — September 27, 2004 Dave Wallace (Chair) Corporate Chief Technology Officer Management Board Secretariat Ontario.
PRODML Overview – Energistics Seminar
Epiphany Partners Corporation HealthTechNet ClerePath TM Solution July 21, 2006.
1 CommonLine and the Common Record: The Building of Convergence Kim Shiflette, USA Funds Bob King, Citibank Student Loans Session 34.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
Copyright © 2004 by The Web Services Interoperability Organization (WS-I). All Rights Reserved 1 Interoperability: Ensuring the Success of Web Services.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
WITSML an update Calgary Workshop April Introduction Vision Reflection Motivation Achievements Activities Plans Expectations Alignment.
LAS To WITSML Conversion Utility Presented at POSC Regional SIG meeting Stavanger, June 2006 by POSC & Satyam Computer Services Ltd.
© Copyright 2005 POSC WITSML™ SIG Meetings and Public Seminar Alan Doniger, POSC May 10-12, 2005.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Integrated Operations SIG: Distributed Temperature Survey Data Transfer Standard Paul Maton (POSC) POSC SIG Seminar, Delhi, India.
Real time data in Statoil
1 Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services.
eSciDoc Community Model Draft eSciDoc Community Model Overview 1.Introduction 2.Requirements on the Community Model 3.Organizational.
Shell Exploration & Production Shell - POSC Activities 2005.
Energistics Asia South Region Meeting: (Drilling) WITSML SIG Update New Delhi, IndiaAlan Doniger 14 January 2007Chief Technology Officer Le M▲ridien New.
© LogicaCMG All rights reserved Distributed Temperature Sensing Database Stephen Vear Shell Global Solutions / LogicaCMG.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services /
S&I PUBLIC HEALTH REPORTING INITIATIVE: DEVELOPING OF A TEAMING APPROACH S&I Public Health Reporting Initiative Nikolay Lipskiy, MD, DrPH, Co-Lead September,
WellPath Progress Report: Re-spudded and drilling ahead John Turvill and Paul Maton WITSML SIG, Houston TX, 9 – 11 May 2006 POSC Regional SIG, Stavanger,
Welcome to the WITSML Public Seminar and Vendor Exhibition Paris, France 16 May 2007 Sponsored by Total.
1 WITSML™ SIG Meetings and Public Seminar & Exhibition Alan Doniger Chief Technology Officer POSC Aberdeen, Scotland 19 September 2006.
WITSML™ Drilling Standards Pemex 21 August 2008 Ciudad de México Alan Doniger, Energistics.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005.
Integrated Operations SIG: Distributed Temperature Survey Data Transfer Standard: Update Houston 12 May 2006 Paul Maton and John Bobbitt (POSC)
eSciDoc Community Model Draft eSciDoc Community Model Overview 1.Introduction 2.Requirements on the Community Model 3.Organizational.
WITSML SIG Area of Interest –the definition, movement, and storage of drilling data, information, and knowledge, especially the “right time” seamless flow.
Summary of HEP SW workshop Ian Bird MB 15 th April 2014.
Association of Enterprise Architects International Committee on Enterprise Architecture Standards Jan 23, Collaborative Expedition Workshop #57aeajournal.org.
DSS SIG Area of Interest –the definition, movement, and storage of E&P data, information, and knowledge. –This group is essentially a cross-vendor, cross-product.
1 Options Clearing Corporation Encore Data Distribution Services April 22, 2004.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
DSS SIG Area of Interest –the definition, movement, and storage of E&P data, information, and knowledge. –This group is essentially a cross-vendor, cross-product.
1 SAIC XMSF Update XMSF Workshop & MOVES Open House 4-5 August 2003 Katherine L. Morse, Ph.D., David L. Drake, Ryan.
© Copyright 2006 POSC Integrated Operations (Production) SIG Meeting Alan Doniger, POSC May 12, 2006 Houston, Texas.
TCIP Fare Collection Rob Ayers Prepared for Talking Technology and Transportation (T3) State-of-the-State Update on U.S. Fare Collection Standards December.
Why do we audit? PSCI Audits are designed to assess a supplier's performance against the PSCI Principles as well as against international standards and.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
HR Open Standards Consortium Overview
CIIMS Proposal for TOP-003 Approach
Well Identification Industry Meeting
Transitioning into Prime Pilot Phase & Implementation Phase
Context Methodology SC
Implementing UK Housing Data Standards
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Integrated Operations SIG: Distributed Temperature Survey Data Transfer Standard Paul Maton (POSC)

Overview Introduction Summary of the technology Early applications, emerging requirements of DTS in E&P Business drivers for DTS in E&P SIG formation and activities Current status and plans

DTS proprietary data format Well/Wellbore Backscatter to Temperature converter Near-real Time Data Server / RTU / … Vendor Datastore Vendor Applications Proprietary Datastore Proprietary Applications Partner(s) Wellsite Operations Centre and/or Offices DTSML standard data format Overview: DTS Data Diagram Vendor Datastore Vendor Applications Proprietary Datastore Proprietary Applications Operator Wellhead Optical fiber carrying transmitted and backscattered light DTSML Server Laser DTS Box SupplierOpen Standard Client

Backscatter spectrum Stokes component Temperature independent Raman bands Wavelength Intensity Brillouin bands Rayleigh component equal to incident wavelength Anti-Stokes component Strongly temperature dependent Temperature = f(( I +/ I -) +…) I-I- I+

Why establish a standard? Manufacturers Enabler for greater industry use of DTS Possible applicability in other industries Service companies Avoids the requirement for customization for each client Enabler for greater industry use of DTS Operators Access to data from different service companies Earlier availability of DTS data

June ‘04 Proposal Collaborative design and development of DTS data transmission and exchange standard between DTS manufactures and suppliers and operators Leverage WITSML architecture, infrastructure (API) and process (SIG) Evolution and maintenance of public domain standard through POSC Applications and storage of information are out of scope

Deliverables Definition of data content requirements Standard vocabulary and thesaurus of vendor specific terminology to standard Analysis of the usability of the candidate technologies (XML, WITSML, OPC) Revision of the draft XML implementation proposed by BP –based on WITSML, will include schema, stylesheet, sample DTS data, and documentation

DTS Group formation BP sponsor Richmond meeting (March ’04) –Attendees: BP, Shell, Baker Hughes, Halliburton, POSC, Polarmetrix, Schlumberger, Sensornet, Wood Group POSC publish project proposal (June ‘04) Participation established (Sept ’04) –Active: BP, Shell, Halliburton, Schlumberger, Sensornet –Funding (17) and monitoring (3): POSC members of IntOPS SIG

DTS Group Activities Kick-off Teleconference 21 Sept –Reviewed scope, raised issues (IP, data content, flexibility, XML or OPC?, etc.) Workgroup at Shell, London, 12 Oct –Reviewed and refined requirements, scope, issues from 21 Sept, received submissions from Halliburton and Shell On-going work by POSC staff –Documenting and analysing requirements –Revising XML schemas

Resources BP / Baker initial DTS schema Shell DTS Primer Service company publications and data WITSML specifications – particularly alignment with WITSML 1.3

Issues - 1 XML and/or OPC? –DTS Group reviewing status of OPC move from DCOM to XML –Proceeding with DTSML development leveraging BP/BHI and WITSML assets Reuse of WITSML assets –Leverage data objects such as Well, Wellbore and many components Flexibility and Extensibility –DTS is a young and evolving technology –Standard must not constrain innovation

Issues - 2 Bandwidth constraints –Between wellhead / control center / office –Any of three levels of bandwidth are common: Low: 9600 baud RTU connection Low to medium: 64kB to 100MB High: in the order of GBytes/sec –Need to design for minimal verbosity of XML messages Data transmission functionalities –Batch and near real-time data access –DTS system and fiber calibration and quality components –Deferred, but future implementations may use WITSML Server capabilities

Requirements - 1 System installation data –Well and wellbore contextual data –Fiber and ‘DTS box’ contextual data –Permanent and temporary installations –Various fiber installation patterns –Interchange of equipment Calibration of DTS system and data to wellbore –Determining position of DTS measurements along fiber and in wellbore –Calibrations used to convert Stokes/Anti-Stokes intensity ratio to temperature and apply other corrections OTDR (Optical Time Domain Reflectometry): –self-checking fiber and system functionality

Requirements – 2 DTS data types –Stokes, anti-Stokes, OTDR, raw Temperature, calibrated Temperature –Routine ability to select all or some of the above Flexible DTS Message Content –Enable selection of calibration, context and temperature types for particular purposes –Need to satisfy transfers between wellsite to office, office to wellsite, and office to office

(DTS) Fiber configuration patterns Single straight fiber Single straight fiber plus independent sensor Partially returned fiber or ‘J’ Fully returned fiber or ‘U’ Wellhead level

Outline DTS Message Data Model dtsMessage uidMessage, dTim, …. dtsBox mfr, serial#, dTim… dtsCalibration(s) Attributes OTDR 0..n*[ I rayleigh ] fiber mfr, serial#, … fiberInWellbore length, mD, dTim… wellbore nameWellbore, … well nameWell, field… temperatures dTim, Stokes, antiStokes, tRaw, tCal

Current Plan Complete development and review of first iteration on schemas by end-April Incorporate further BP work and feedback from first iteration. Complete second iteration on schemas and SIG review by mid-May Industry comment period through mid-June Publish standard at end of June ‘05

Conclusions Business case exists for DTS data transfer standard: with benefits to Operators, Service Companies and DTS system manufacturers Clear, focussed objectives and community of interest established Requirements, Issues and Resources collected, analysed, draft schemas and documentation in preparation. Publication of standard anticipated in June ’05, within 9-months from Kick-off. Further participation is invited in reviews and subsequent implementation pilot(s)

More information from Paul Maton Tel:

Context Initiation BP hosted meeting in March 2004, Richmond –Proposed a new DTS data standard –Sought support from service and oil companies –Scope proposed as data transfer only –Recommendation to pursue through POSC POSC SIG meetings (June 04 Stavanger, Houston) –Presented project proposal

Agenda Context Overview of DTS Proposal Benefits - why establish a standard Deliverables Resources Next Steps

Potential Resources Funding –POSC IntegratedOperations SIG SIG funding needed for requirements and facilitation Optionally from existing SIG members who elect to support DTS Additionally from members who join SIG to support DTS –Supplementary sponsorship POSC internal resources for XML Schema work Additional cash to cover any shortfall Expertise –Operators, Oil Service companies, DTS system manufacturers, POSC

Next steps Interested Parties obtain and consider proposal Responses due by 9 July 2004 Work starts after SIG approval (POSC) Contacts –David Archer –Paul Maton