A Hard Chrome Alternatives for Hydraulic Components Program established to assist Oklahoma City Air Logistics Center Airborne Accessories Directorate Avionics.

Slides:



Advertisements
Similar presentations
Use of Rubber Gloves & Protectors for Underground Cable Splicing
Advertisements

Simulating Ground Support Capability for NASAs Reusable Launch Vehicle Program Kathryn E. Caggiano Peter L. Jackson John A. Muckstadt Cornell University.
ERP LN Service Depot RMAs and Repairs Presented by: Strategic Systems Group, Inc.
HCAT Propeller Hub Chrome Plate Replacement Program
Non-Line of Sight Hard Chrome Alternatives Project April 2001 Joe Kolek AFRL/MLQL (937)
FINAL REVIEW Landing Gear JTP Wear Test Analyses J.D. Schell GE Aircraft Engines HCAT Toronto Meeting Crowne Plaza Hotel August 28-30, 2001.
Lesson 31 Main Engine Repair (II).  1. Crankpin bearing overhaul  2. Fuel pump removal & re-installation  3. Cylinder head removal/replacement  4.
Aerospace Use Of Hexavalent Chromium And Soluble Nickel In Relation To REACh 7th October 2009 From a combined Goodrich and Rolls-Royce review of the implications.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Draft JTP for Hydraulic & Pneumatic Actuators National Technical Systems / Elwin Jang / December 2000.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
File Name & Location 12/05/2015, Page 1 STATUS OF F/A - 18 E/F NLG RIG TESTING.
A Hard Chrome Alternatives for Hydraulic Components Program established to assist United States Air Force Airborne Accessories Directorate Avionics and.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
HCAT PROGRESS REPORT FEBRUARY 2002 GOODRICH LANDING GEAR HCAT STATUS CONDUCTING THREE FULL SCALE TESTS: 1. Fatigue of entire MLG - Dash-8 Series
Cost/Benefit Analysis Conducted at Landing Gear Repair Facility Analysis conducted by Concurrent Technologies Corporation using Environmental Cost Accounting.
Navy Landing Gear Perspective Tribaloy-Treated F/A-18C/D
ADB 1560 Air Disc Brake This training session will review common problems in the field and general maintenance procedures.
Welcome to Engineering Design, At UMD-MIE we say: “Student teams use design and analysis methods learned in previous courses to develop, design or improve.
OC-ALC Chrome Plate Reduction 20 FEB 2002 OKLAHOMA CITY AIR LOGISTICS CENTER Johnny Tsiao OC-ALC/LPARR (405) I n t e.
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
Brake Systems.
Introduction to Hydraulics ClassAct SRS enabled. In this presentation you will: identify the fundamental parts of a hydraulic system and safety issues.
Welcome to Engineering Design What is engineering design, really? Function to form Design process Phases of design Product realization process Roles for.
Project Status as of 1 April 2003
David Warne Independent Manufacturing Consultant.
1 CHROMIUM PLATING REPLACEMENT AT SIKORSKY AIRCRAFT ROBERT GUILLEMETTE JOHN BARTALOTTA MATERIALS AND PROCESSES ENGINEERING APRIL 26, 2001.
POLLUTION PREVENTION SUB-IPT HCAT MEETING April 01 Long Beach, CA HARD CHROME PLATING ALTERNATIVES Mary Gilman Boeing C-17 Pollution Prevention Project.
Gas Turbine Engine Project Materials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs.
The Maintenance and Engineering Organization
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING August 2001 Toronto,
What is the most Important system on your vehicle?
From Research Prototype to Production
Jeff Moorman Hydraulic Systems and Flight Control Actuators (301) Navy Rod Seal Testing Project Status as of 1 Sept 2002 Results from Rod Seal.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING 1-2 April 2003 San Diego,
Keith Legg Test Status Overview HCAT Program Review NASA, Florida Dec 13,14, 2000.
Revised Draft JTP for Hydraulic & Pneumatic Actuators National Technical Systems / Elwin Jang / April, 2001.
ORENDA AEROSPACE CORPORATION PROGRESS REVIEW MEETING THE CANADIAN HARD CHROME ALTERNATIVES TEAM (HCAT) JOINT PROGRAM HVOF PROCESS DEVELOPMENT, EVALUATION.
Welcome to Engineering Design What is engineering design, really? Function to form Design process Phases of design Product realization process Roles for.
Obsolescence Impact on Configuration Management
Keith Legg Overview of fatigue/spalling tests HCAT Program Review Long Beach April 2001.
A Hard Chrome Alternatives for Hydraulic Components Program established to assist Oklahoma City Air Logistics Center Airborne Accessories Directorate Avionics.
Hard Chrome Replacement NADEP Jacksonville February, 2002 Michael Linn Materials Engineering.
CLASSROOM MANUAL l CHAPTER 4 –page 74. BEARINGS, BUSHINGS, THRUST WASHERS l When a component slides over or rotates around another part, the surfaces.
Keith Legg Clean Dry-Coating Technology for ID Chrome Replacement SERDP Project # 1151 HCAT Program Review Long Beach April 2001.
Original ATE brake calipers and remanufactured calipers Thermal stability and maximum decelerating power.
Automatic Transmission Ch 39 3 spd, 4 spd OD, 5, & 6 spd automatic. 4L60E - 4T60E.
Gas Turbine Engine Project Materials Joint Test Protocol Document Principally Prepared By Jerry Schell GE Aircraft Engines Additional Input From GTE OEMs.
HVOF CONCERNS Ogden Air Logistics Center. HVOF CONCERNS HVOF CONCERNS Hill AFB concerns 0Thick Coatings 0Spalling 0Corrosion 0Spraying Parameters Sensitivity.
Developed By Jared Storrs Masters Project Engineering Technology and Education Dept. Utah State University Materials and Processes Intro to Manufacturing.
Working Drawings Stephen W. Crown Ph.D.. Working Drawings A final set of drawings providing all the details and information needed to manufacture and.
A mess… “ Analyse the concept Airborne Capability and investigate to what degree such a capability can enhance operational and tactical levels of armed.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING September 2002 Toronto,
Chapter 7 Maintenance and Engineering Organization
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Chapter 6: Hydraulic Cylinders and Cylinder Cushioning
CHALLENGER DISASTER : CASE STUDY – TO BE
Brake System Fundamentals
ASSEMBLY AND DETAIL DRAWING
Hydraulic Cylinders Suppliers in UAE
Engineering Design Process
Engine Removal, Disassembly, Inspection, and In-Chassis Repairs
“V” MACHINE PROBLEMS & SOLUTIONS
Engineering Design Process
Chapter 7 Maintenance and Engineering Organization
Modern Automotive Technology PowerPoint for by Russell Krick
F-16 Production Non-Cr6+ Implementation
DOE Review of the LCLS Project October 2006
Esselarme - Smithline Reinforced Composites FZ-LLC
Presentation transcript:

A Hard Chrome Alternatives for Hydraulic Components Program established to assist Oklahoma City Air Logistics Center Airborne Accessories Directorate Avionics and Accessories Division (OC-ALC/LII) in development and implementation of replacement repair and overhaul procedures for hydraulic actuators across multiple weapon systems.

A Hard Chrome Alternatives for Hydraulic Components Phase 1 - TO and Drawing Review, Database Development, Test Requirement Development –124 Air Force Technical Orders Reviewed 100% complete –729 Engineering Drawings Reviewed 60.4% complete –276 Chrome plated parts and 195 potentially chrome plated parts have been identified.

A Hard Chrome Alternatives for Hydraulic Components Phase 2 - Material, Rig, and Flight Testing –Flight Control Actuators 87 distinct part numbers Revised estimate: 8-10 will require delta-qualification Candidate items selected

A Hard Chrome Alternatives for Hydraulic Components Phase 2 - Material, Rig, and Flight Testing –Utility Actuators 73 distinct part numbers Revised estimate: 10 will require delta-qualification 1 candidate items selected –Snubbers 12 distinct part numbers Estimate 3 will require delta-qualification

A Hard Chrome Alternatives for Hydraulic Components Phase 2 - Material, Rig, and Flight Testing –C-130 Rudder Booster Assembly Rudder booster actuator manufactured by Kaiser Fluid Technologies. Qualified by Lockheed Martin. Delta-Qualification will be performed by Kaiser Fluid Technologies.

A Hard Chrome Alternatives for Hydraulic Components

A Phase 2 - Material, Rig, and Flight Testing –C-130 Rudder Booster Assembly 4 chrome plated surfaces. –Piston rod »3 sections, with piston heads separating them –Piston head (2 piston heads on the unit) »Not part of the piston rod –Trunnion OD »Mates with an aluminum-bronze bushing –Trunnion ID »Not wearing part

A Hard Chrome Alternatives for Hydraulic Components

A Phase 2 - Material, Rig, and Flight Testing, rod coating surface finish and seal selection –Existing seals are elastomeric T-seals contacting chrome plated rod –Various testing to date shows: Elastomeric seals do not wear as well against ground HVOF coated surfaces as they do against chrome. Elastomeric seals do not wear as well as teflon capped seals against HFOV coated surfaces. Additional Greene Tweed testing indicates that superfinishing of the coated rod surfaces reduces elastomeric seal life during endurance tests.

A Hard Chrome Alternatives for Hydraulic Components Phase 2 - Material, Rig, and Flight Testing, rod coating surface finish and seal selection –Options under consideration: Electroplated Chrome with AGT seals (baseline) HVOF WC-CoCr with AGT seals HVOF WC-CoCr with new Greene Tweed seals HVOF WC-CoCr with new Shamban seals

A Hard Chrome Alternatives for Hydraulic Components Phase 2 - Material, Rig, and Flight Testing –C-130 Rudder Booster Assembly HVOF coatings superfinished - Ra: 2-4 Chrome ground - Ra: 8-16

A Hard Chrome Alternatives for Hydraulic Components Phase 3 - Data Evaluation –Results of Testing will be evaluated and a solution finalized.

A Hard Chrome Alternatives for Hydraulic Components Phase 4 - Implementation –The solution developed during evaluation will be implemented.

A Hard Chrome Alternatives for Hydraulic Components Lessons learned –Some parts may NOT be suitable for HVOF. Other coatings may be required coatings. Piston heads Trunnion ID

A Hard Chrome Alternatives for Hydraulic Components Lessons learned –There is more to this than HVOF. Surface finishing Application process Seal choices