IEC Technical Guidance Training

Slides:



Advertisements
Similar presentations
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
My AmeriCorps AmeriCorps and VISTA Programs Create and Manage an eGrants Account Presentation developed for the Corporation for National and Community.
Slide 1 FastFacts Feature Presentation September 7, 2010 We are using audio during this session, so please dial in to our conference line… Phone number:
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
National Thousands Block Number Pooling Services NANC Meeting November 5, 2003.
1 Regulation. 2 Organisational separation 3 Functional Separation.
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Foreign Air Operator Validation & Surveillance
This program is co-sponsored by NJDEP-SRP and the LSRPA
IEC C ASE S TUDY PRESENTED BY: Mark D. Fisher, CHMM, LSRP Principal – The ELM Group, Inc.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Grants 3.0 Departmental Administrator Review January 22, 2014.
Understanding Site Remediation in New Jersey Understanding Site Remediation in New Jersey NJDEP/Air & Waste Management Association Regulatory Update Conference.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Site Safety Plans PFN ME 35B.
3/31/2017 SITE REMEDIATION PROGRAM Assistant Commissioner
Land Remediation Section – Environmental Management Branch Update on Contaminated Sites Changing Legislation John E.H. Ward Land Remediation Section Ministry.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Promotion and Tenure Workshop 1. Evaluation Procedure There is only one evaluation procedure leading to recommendations regarding promotion, tenure and.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Office of Operations 2010 Fall Conference State Agency Compliance with Prompt Contracting Regulation Dan Agosto, John Moriarty & Patricia ODonnell.
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
AEMCPAGE Relaunch 1 June 2009.
Hazardous Waste Section
Federal Tort Claims Act (FTCA) Free Clinics Program Technical Assistance Call Department of Health and Human Services Health Resources and Services Administration.
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
2 |SharePoint Saturday New York City
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
VOORBLAD.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
David Edmunds Environmental Program Specialist Drinking Water Program Department Of Environmental Conservation Drinking Water Watch.
Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental.
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
1 Progress of Sandia’s Environmental Restoration Operations John R. Cochran Environmental Restoration Operations Project Manager Sandia National Laboratories.
Legal Trends – Part II © 2012 Fox Rothschild Atlantic Builders Convention Legal Trends – Part II Environmental Law Site Remediation Reform Act (SRRA) and.
Presentation transcript:

IEC Technical Guidance Training Andrew Sites, Mark Fisher, John Boyer September 2011 1

What are we going to cover? Overview of IEC Concept IEC Regulatory Process IEC Resources Vapor Intrusion Overview Case Studies IEC Program Status 2 2

IEC Concept Overview Andrew Sites, NJDEP 3

IEC Guidance Committee Members Christopher Dailey, GEI Consultants Jeffrey Farrell, PS&S Mark Fisher, The ELM Group, Inc., LSRPA Bob Gallagher, DEP Martin Hilfinger, Cumberland Gulf Kathleen Murray, TERMS Environmental Rocky Richards, DEP Dan Stecchini, Groundwater & Environmental Services Andrew Sites, DEP – Co-chairperson Bruce Venner, DEP – Co-chairperson 4 4

What is an IEC? Contaminant source in the environment Contaminant migration pathway Impacted receptor 5 5

Three types of IECs Potable wells Vapor intrusion Direct contact 6 6

IEC Trigger Levels Potable Water > Groundwater Remediation Standards Vapor Intrusion > Rapid Action Levels Direct Contact > Acute Health Effect Levels 7 7

Basic IEC Concept Delineate IEC problem Remediate IEC problem Remove source causing IEC problem 8 8

What is the IEC Process? Every IEC gets a Case Manager Expedited time frames for rapid response New cases go to IEC group Case Managers on existing cases will handle IECs LSRP/consultant must work with Case Manager Most work based on verbal approvals with email confirmation 9 9

IEC Guidance Written for basic types of IEC conditions and sensitive receptors Includes both rule and guidance: shall & should Frequent communications and information sharing with case manager is vital Time extensions can be requested 10 10

Rules and Guidance Technical Rules (shall) Guidance (should) Must comply with requirements of the rules Guidance (should) Follow guidance but can use professional judgment with adequate justification 11 11

Regulatory and Mandatory Time Frames All regulatory time frames in Technical Rules N.J.A.C 7:26E-1.14 Start date for regulatory time frames was 11/2009 for existing IECs and date of discovery for new IECs All mandatory time frames are in the ARRCS rule N.J.A.C. 7:26C-3.3 The start date for mandatory time frame provisions was March 1, 2010 (existing sites) All mandatory time frames are 2 years from the date of discovery of the IEC Time frame extension can be requested 12 12

How to get an extension of regulatory time frame? Submit a Remediation Time Frame Extension Request form to the Case Manager or Bureau of Initial Notice 30 days before due date Provide rational for extension and new schedule If approved - You will not receive a response If disapproved - A rejection letter will be sent Note: An extension of a regulatory time frame must not result in exceedance of a mandatory time frame 13 13

How to get an extension of mandatory time frame? Submit a Remediation Time Frame Extension Request form to the case manager or Bureau of Initial Notice 60 days before due date Provide rational for extension New schedule to complete work Department will provide a written response 14 14

Role of LSRP/RP & IEC Case Manager Address IEC by following rules and guidance IEC Case Manager Oversight: Direct Billing to RP Answer questions Evaluate time extension requests Evaluate deviation from guidance Document progress or lack of progress Initiate enforcement Noncompliance: use public funds 15 15

Non-Compliance with Rules Case will be referred for enforcement DEP will use public funds for addressing receptors and conducting receptor delineation Refer LSRP to Licensing Board Enforcement against the responsible party $20,000 base penalty per violation 16 16

Significant Changes Current Technical Rules: February 2011 IEC Information Submittal 5 days extended to 14 days Regulatory: Source Control & Report 270 days extended to 1 year Mandatory: Source Control & Report 1 year extended to 2 years 17 17

Significant Vapor Intrusion Rule Changes Interim Response Action (VI ONLY) 5 days extended to 14 days Trigger for VI IEC Indoor air screening levels (IASL) changed to exceeding the Rapid Action Levels (RAL) Vapor Concern (VC) Case category created trigger level > IASL and <RAL 18 18

IEC Regulatory Process Mark Fisher, The ELM Group, Inc. 19

Regulatory time frames 3 Categories of Regulatory time frames Potable & Direct Contact Vapor Intrusion Vapor Concern 20 20

IEC Regulatory Time Frames: Potable and Direct Contact Immediately 5 days 14 days 60 days 120 days 1 year Call the Hotline and case manager Interim Response Action IEC Information submittal Engineered System Response Receptor Delineation Engineered System Response Action Report Source Control Report* 21 * Also has 2 year mandatory time frame 21

IEC Regulatory Time Frames: Vapor Intrusion Immediately 14 days 60 days 120 days 1 year Call the Hotline and case manager Conduct Interim Response Action & submit IEC information and form Engineered System Response Action & Receptor Delineation Engineered System Response Action Report Source Control Report * 22 * Also has 2 year mandatory time frame 22

Receptor Evaluation Report Timeline with IEC – Potable water May 1 Well Search 90 days March 1, 2011 Initial Receptor Evaluation* June 1 Collect Potable Sample 120 days March 1, 2012 Mandatory time frame Get analytical data March 1 Receptor Evaluation Timeline Known ground water contamination 1 year source control 2 year Mandatory time frame Data > std 120 day req. 5 day req. 14 day req. 60 day req. IEC requirements 23 23

Differences between VI and Potable Water/Direct Contact VI: Both Interim Response Action and IEC Information Submittal due in 14 days Potable Water/Direct Contact: Interim response action due 5 days IEC Information Submittal due 14 days All other time frames are similar 24 24

Day 1 – Immediate Requirements Notify the HOTLINE Must refer to case as an “IEC Case” 1 (877) WARN DEP Notify case manager for assigned cases Notify HOTLINE for unknown source IEC 25 25

5 Day Requirements for Potable Water and Direct Contact IEC Complete interim response action Interim Response Action Examples Bottled water (potable IEC) Fencing (direct contact IEC) Notify property owner, Twp., Health Dept 26 26

14 Day Requirements - Potable & Direct Contact Only Information Submittal IEC Response Action Form IEC Spreadsheet Map of site and IEC condition All analytical results with full data deliverables Submit paper copy & Email to Bureau Initial Notice and Case Assignment IEC Case manager assigned 27 27

14 Day Requirements - VI Only Complete interim response action Notify property owner, Twp., Local Health Dept., & Dept. Health and Senior Services Vent, seal cracks and sumps IEC Information Submittal IEC Response Action Form IEC Spreadsheet Map of site and IEC condition All analytical results with full lab data deliverables Submit paper copy & Email to Bureau of Case Assignment and Initial Notice (BCAIN) IEC Case Manager will be assigned 28 28

60 Day Requirements - All IECs Identify additional receptors (potable wells and structures) Conduct sampling Comply with notification requirements Complete Engineered System Response Action POET or waterline connection Sub-slab ventilation Verbal communication with IEC Case Manager is ongoing 29 29

120 Day Requirements - All IECs Submit IEC Engineered System Response Action Report: IEC Response Action Form Receptor delineation & receptor control description IEC Spreadsheet with all IEC related data IEC Map GIS compatible map submission 30 30

1 Year Requirements - All IECs Complete delineation of IEC source Initiate source control Submit IEC Source Control Report IEC Response Action Form IEC Spreadsheet with all data Map of IEC area GIS compatible map submission Monitoring & Maintenance Plan 31 31

Vapor Concern - Regulatory Time Frames 14 days: Submit VC Response Action form 60 days: Submit Mitigation Plan 120 days: Implement Mitigation Plan 180 days: Submit Mitigation Response Action Report 32 32

Vapor Concern Interim Vapor Concern Technical Guidance New Vapor Intrusion Guidance will replace VC Tech. Guidance VC cases will have a case manager VC Response Action Form 33 33

VC and IEC Differences IEC: Exceeds Rapid Action Levels (RAL) VC: Exceeds IASL and <RAL No call to DEP Hotline No time frame for Receptor Delineation No time frame for Source Control Must submit a Mitigation Plan Both IEC & VC have Case Managers 34 34

IEC Case Component Completed IEC case closed out in DEP Database – no letter IEC case manager’s involvement ceases Continue monitoring and maintenance (M&M) Submit future M&M reports to BCAIN not IEC case manager M&M plan incorporated into RAO permit 35 35

Questions? (followed by 10-min Break)

IEC Resources Andrew Sites, NJDEP 37

IEC Resources SRRA Guidance Library SRRA Forms Library Spreadsheet Sample Maps Sample letters to property owners Quick Reference Guide Contact List for Questions on LSRP 38 38

39 39

SRP Guidance Library IEC Technical Guidance Document VC Technical Guidance Document Vapor Intrusion Guidance Document IEC spreadsheets GAC POET Specifications 40 40

Site Remediation Reform Act Guidance Library 41 41

SRP Forms Library IEC Response Action Form VC Response Action Form Potable Well/Indoor Air Sampling Notification Form Full Laboratory Data Deliverable Form IEC spreadsheets Remediation Time Frame Extension Request 42 42

Site Remediation Reform Act (SRRA) Forms 43 43

IEC Spreadsheets Potable well Vapor Intrusion/Vapor Concern Direct Contact 44 44

45

46

47

48

49

50

51

52

Sample Maps Sample of IEC Map Maps depicting receptor delineation process Maps showing Currently Known Extent (CKE) map delineation process 53 53

IEC Map Sample 54 54

55 55

Receptor Delineation Sample Maps 56 56

57 57

58 58

59 59

60 60

61 61

62 62

Currently Known Extent Area Mapping Example 63 63

64 64

65 65

Template Notification Letters Vapor Intrusion Letters Potable Water Letters www.state.nj.us/dep/srp/guidance/vaporintrusion/templates 66 66

67 67

68 68

69 69

Quick Reference Guides www. state. nj Quick Reference Guides www.state.nj.us/dep/srp/srra/training/#quickrefs 70 70

Contact List for Questions on LSRP www. state. nj Contact List for Questions on LSRP www.state.nj.us/dep/srp/srra/srra_contacts 71 71

Benefits of using IEC Tools Simplifies and standardizes reporting process Promotes consistency between cases Allows for easier electronic submissions Allows for real-time decisions between LSRP and case manager 72 72