EPS Budapest August 20021 The Challenge of Going Global Ian Corbett European Southern Observatory.

Slides:



Advertisements
Similar presentations
NSF Experience with Management of Research Infrastructure
Advertisements

FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Europe and Education School Education COMENIUS. The School Education Action of the European Community’s Programme “Socrates” on Education 2 nd phase:
Presentation at WebEx Meeting June 15,  Context  Challenge  Anticipated Outcomes  Framework  Timeline & Guidance  Comment and Questions.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
DOING BUSINESS IN THE MIDDLE EAST STRATEGIES, CHALLENGES AND RISKS OPPORTUNITIES.
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
THE NATIONAL FOREST PROGRAMME FACILITY
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Particle Physics, Nuclear Physics and Particle Astrophysics meeting October 2010 John Womersley Director, Science Programmes, STFC.
Managing an established facility: Scenarios for group work Kimmo Koski 26 October 2011.
Office of Science U.S. Department of Energy SLAC Users Organization Meeting July 6, 2004 Dr. Robin Staffin, Associate Director Office of High Energy Physics.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU 9 TH P UBLIC P ROCUREMENT K NOWLEDGE E XCHANGE P LATFORM,
Issues in international collaboration in large astronomical projects Richard Schilizzi Chair, IAU Working Group on Future Large Scale Facilities.
A Communication Strategy for the FCC study James Gillies, Head of Communications, CERN EuroCirCol kick-off meeting, 2 June 2015.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
AAAC Meeting: October 12, 2005 ALMA Update: October 2004-October 2005 Bob Dickman ALMA Staff Associate Division of Astronomical Sciences.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Governance of the International Linear Collider Brian Foster (Oxford & GDE) ICHEP Paris 24/7/10.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
Intersectoral Collaboration An Initiative: Promoting collaboration among the three sectors of the social work profession.
CERN Enrico CHIAVERI Head, Human Resources Department 22 June 2009.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
A Communication Strategy for the FCC study James Gillies, Head of Communication, CERN FCC week 2015, 25 March 2015.
Message from ACFA Chair C.Zhang IHEP CCAST ILC Accelerator Workshop and First Asian ILC R&D Seminar under JSPS Core University November 5, 2007.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
KICS – is there scope for Southampton researchers? Niki Price, Research & Innovation Services 20th November 2013.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
The European Strategy Group (ESG) The remit of the ESG is to establish a proposal for an Update of the medium and long- term European Strategy for Particle.
1 ASTRONET Coordinating strategic planning for European Astronomy.
Promotion of an ICT dialogue between Europe and Latin America Horizon 2020 Dr. Margaretha Mazura, EMF Project Angels Webinar, 13 December 2012.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Devolution in Greater Manchester October 2015 Alex Gardiner, New Economy.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
Organisation for Economic Co-operation and Development Global Science Forum Large-Scale International Scientific Cooperation: A View from OECD - Drivers:
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
ALMA Town Meeting Introduction K. Y. Lo Director of NRAO.
Opening CERN to non-European States (aka as ‘geographical enlargement’) Rüdiger Voss CERN International Relations Office FPRIB, SINP Kolkata| April 16-18,
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
Advisory Forum, July 2005 Outcome of the first retreat of ECDC Management Team (EXC) 4-5 July 2005 Krägga Herrgård Zsuzsanna Jakab Director ECDC.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
CERN Education and Communication (ETT/EC) James Gillies 4 April 2003.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
International Collaboration for Data Preservation and Long Term Analysis in High Energy Physics RECODE - Final Workshop - January.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
WP1 - Consortium coordination and management
EIROforum is a partnership between eight of Europe’s largest intergovernmental scientific organisations Previously.
Ways to industry participation in CLIC 24th October, 2017
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
SOCIAL DIALOGUE WITHIN EUPAN
ASTRONET Coordinating strategic planning for European Astronomy
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

EPS Budapest August The Challenge of Going Global Ian Corbett European Southern Observatory

EPS Budapest August Science is a global activity Science is a global activity The Web and now the Grid are accelerating this process The Web and now the Grid are accelerating this process Global communication is taken for granted Global communication is taken for granted The facilities required are becoming larger, more complex, with particle physics in the lead The facilities required are becoming larger, more complex, with particle physics in the lead But other fields are following not far behind But other fields are following not far behind

EPS Budapest August Particle Physics has a ‘Road Map’ which extends for 20+ years Particle Physics has a ‘Road Map’ which extends for 20+ years This foresees major new facilities starting with the electron-positron LINEAR COLLIDER This foresees major new facilities starting with the electron-positron LINEAR COLLIDER Which should be build ‘as soon as possible’ so that it complements the CERN LHC (operational 2007) Which should be build ‘as soon as possible’ so that it complements the CERN LHC (operational 2007) The likely cost is comparable to that of the LHC and hence of other major facilities in physics The likely cost is comparable to that of the LHC and hence of other major facilities in physics

EPS Budapest August Previous accelerators were ‘regional’ or ‘national’ Previous accelerators were ‘regional’ or ‘national’ The detectors were ‘international’ The detectors were ‘international’ As was the science As was the science Examples: LEP, Tevatron, PEP-2, … Examples: LEP, Tevatron, PEP-2, … LHC machine marked a change: regional but with very major contributions from rest of world LHC machine marked a change: regional but with very major contributions from rest of world Next machine likely to take a further step and be planned and built as a global collaboration Next machine likely to take a further step and be planned and built as a global collaboration

EPS Budapest August What are the issues? What are the issues? and and How could we proceed? How could we proceed?

EPS Budapest August OECD GSF HEP Consultative Group Final Report June 2002

EPS Budapest August HEP Consultative Group formed to: Exchange views between government delegations on future direction of HEP Exchange views between government delegations on future direction of HEP Examine rationale behind programme priorities and strategies Examine rationale behind programme priorities and strategies Discuss generic issues Discuss generic issues Identify and examine organisational and managerial issues Identify and examine organisational and managerial issues All from point of view of governments or funding agencies

EPS Budapest August Participants in Group A wide representation of interested bodies is essential for true consultation. OECD member nominees OECD member nominees Non-OECD member delegates Non-OECD member delegates Representatives of scientific communities Representatives of scientific communities There were four meetings marked by free & open discussion with full participation by all present.

EPS Budapest August Input from communities was invaluable in enabling Group to understand significance of ‘Standard Model’ & its limitations Input from communities was invaluable in enabling Group to understand significance of ‘Standard Model’ & its limitations Group was impressed by range and depth of studies by world-wide HEP communities, and care with which the arguments were marshalled Group was impressed by range and depth of studies by world-wide HEP communities, and care with which the arguments were marshalled Group was impressed by consensus on the way forward Group was impressed by consensus on the way forward And found the arguments compelling And found the arguments compelling

EPS Budapest August “The Consultative Group concurs with the world-wide consensus of the scientific community that a high- energy electron-positron linear collider should be the next facility.”

EPS Budapest August “There should be a significant period of concurrent running of the LHC and the LC, requiring the LC to start operating before Given the long lead times for decision-making and for construction, the process of consultation among interested countries should begin at a suitably- chosen time in the near future.”

EPS Budapest August “To ensure the long-term vitality of particle physics as described by the Road Map, a diverse accelerator R&D programme should be maintained. Innovative accelerator concepts should be explored well before they may be needed, since the lead times for large, complex new projects span decades, and the unpredictable course of discovery in physics may shift the currently foreseen priorities of the facilities on the Road Map.”

EPS Budapest August Given the consensus on what is needed, and the strength of the arguments behind that consensus, what needs to be addressed? The Group looked at a range of areas where more governmental and intergovernmental work is needed The Group looked at a range of areas where more governmental and intergovernmental work is needed –Legal –Financial –Managerial –Oversight, reporting, accountability

EPS Budapest August Legal New legal entity or built on existing entity or entities? New legal entity or built on existing entity or entities? Owned by Host State or Shareholder company? Owned by Host State or Shareholder company? Intergovernmental or interagency agreement(s)? Intergovernmental or interagency agreement(s)? Voting rights? Voting rights? Own or lease site? Own or lease site? Employ staff or staff seconded? Employ staff or staff seconded? Receive funds and place contracts, or co- ordinate ‘in-kind’ contributions? Receive funds and place contracts, or co- ordinate ‘in-kind’ contributions? Ownership (and liabilities)? Ownership (and liabilities)? Guarantees (‘lender of last resort’)? Guarantees (‘lender of last resort’)?

EPS Budapest August Financial Cash or kind or both (‘common fund’)? Cash or kind or both (‘common fund’)? Budget control Budget control Contingency Contingency Accountability Accountability Currency fluctuations Currency fluctuations Contracts and procurement rules Contracts and procurement rules Liability Liability Insurance Insurance Payroll issues Payroll issues

EPS Budapest August Managerial Centralised structure – Director & Key Personnel Centralised structure – Director & Key Personnel Reporting to what? Reporting to what? Controlling what? Controlling what? With what authority? With what authority? Employment of staff? Employment of staff? Administrative support? Administrative support?

EPS Budapest August SHAREHOLDERS: Governments and/or Agencies and/or Institutes BOARD of DIRECTORS DIRECTOR and Key Project Personnel AGENCIES/LABS CONTRACTORS

EPS Budapest August How to decide the technology and the site, given the competing possibilities? Two (simplified) generic routes: a) Regions or countries compete – each with own technology – for local funding; first to reach critical level seeks partners, or a) Community decides on ‘best’ technology, seeks local funding for participation; governments or agencies ultimately decide outcome.

EPS Budapest August Examples - with variations – of both exist in various fields of science Examples - with variations – of both exist in various fields of science Group agreed that the underlying dynamics of both had a part to play Group agreed that the underlying dynamics of both had a part to play But ultimately it was for governments to decide how to address the question But ultimately it was for governments to decide how to address the question

EPS Budapest August The current process to establish the ITER fusion project and the ALMA radio telescope array may provide valuable insights on how to proceed with a global high-energy physics facility, both with respect to the negotiating phase, and the subsequent facility construction, operation and management. The current process to establish the ITER fusion project and the ALMA radio telescope array may provide valuable insights on how to proceed with a global high-energy physics facility, both with respect to the negotiating phase, and the subsequent facility construction, operation and management.

EPS Budapest August ALMA An example but not necessarily a solution. An example but not necessarily a solution. Two main collaborators: North America (USA & Canada) and Europe (ESO & Spain) Two main collaborators: North America (USA & Canada) and Europe (ESO & Spain) Large radio telescope (64 12m Ø antennas) in remote area of Chile Large radio telescope (64 12m Ø antennas) in remote area of Chile Bilateral ‘in-kind’ project, cost ~ 600M euros Bilateral ‘in-kind’ project, cost ~ 600M euros With central managerial control through one Joint ALMA Office With central managerial control through one Joint ALMA Office Initial (to 2004) location of JAO not critical Initial (to 2004) location of JAO not critical After 2004 project based in Chile After 2004 project based in Chile Host nation not contributing to cost Host nation not contributing to cost Japan may join later with major enhancements Japan may join later with major enhancements

EPS Budapest August ALMA SHAREHOLDERS: NSF, NRC, ESO ALMA BOARD DIRECTOR and Key Project Personnel NRAO US & Canadian Labs. ESO European Labs. CONTRACTORS

EPS Budapest August LINEAR COLLIDER SHAREHOLDERS LC BOARD DIRECTOR and Key Project Personnel Host Laboratory or New Entity? Americas American Labs. Europe European Labs. CONTRACTORS Asia Asian Labs. CONTRACTORS

EPS Budapest August FINAL QUOTATION FROM GSF HEP REPORT Preparing and negotiating a formal agreement (or a series of agreements) for the design, construction and operation of a facility on the scale of a linear collider is very time-consuming. … several years may have to be devoted to consultations and negotiations that are the responsibility of governments. ….. Therefore, it is important to allow sufficient time for inter-governmental consultations, well before any financial, manpower, timeline, or other commitments are made. Preparing and negotiating a formal agreement (or a series of agreements) for the design, construction and operation of a facility on the scale of a linear collider is very time-consuming. … several years may have to be devoted to consultations and negotiations that are the responsibility of governments. ….. Therefore, it is important to allow sufficient time for inter-governmental consultations, well before any financial, manpower, timeline, or other commitments are made.

EPS Budapest August WHAT NEXT? Community has established “International Steering Group for the Promotion of Linear Colliders” Community has established “International Steering Group for the Promotion of Linear Colliders” ICFA will discuss the main issues from community and scientific point of view at ICFA Seminar on "Future Perspectives in High Energy Physics” October CERN ICFA will discuss the main issues from community and scientific point of view at ICFA Seminar on "Future Perspectives in High Energy Physics” October CERN OECD GSF will evaluate follow-up to Consultative Group OECD GSF will evaluate follow-up to Consultative Group