Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.

Slides:



Advertisements
Similar presentations
1 Project Nexus Modelling costs and benefits Andrew Wallace, Cesar Coelho Ofgem Project Nexus IA Subgroup 25 July 2012.
Advertisements

Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Nexus Workgroup CSEP Transition Topic June
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Environmental Standing Group. 2 Background  Ofgem issued an open letter on 15 th April 2008 to consider issues associated with carbon assessment for.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
High Level Features of UK-Link Replacement 22nd November 2006.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Industry Dialogue on xoserve Services 14 th September 2007.
Connected System Exit Points Options for strategic regime change Chris Warner.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
IGT and Shipper Workgroup meeting 28 th February 2011.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Modification Proposal 0283 Update
Datalogger / DMV Modification Proposals - Summary
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Chris Kramer, Energy Futures Group
Incentives 26 September 2018.
Connected System Exit Points Administration Options
CSEPs Reconciliation Proposals
Consideration of issues raised by UNC Modification Proposal 0244
Connected System Exit Points Administration Options
MOD 258A Demand Estimation Sample Point – Shipper Report.
Datalogger / DMV Modification Proposals - Summary
Proposed Changes to UNC Section O
Consideration of issues raised by UNC Modification Proposal 0244
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
DN Interruption Phase II
UNC Modification Performance Assurance Framework Incentive Regime
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
RG 175 – Encouraging Participation in the Elective Daily Metered Regime – Tactical Solution. (Indicative Costs) Joel Martin – 26 June 2008.
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007

2 Background UNC Modification 088 (Total) Scope for all I&C customers to participate (>2,500 therms) AMR based daily forecasting and settlement regime Create a new category of site, Hybrid DM(AMR) Modification rejected because: Insufficient information relating mainly to: Meter Read frequency not based on the true capability of AMR Shipper obligations too light Uncertain take-up relative to cost

3 Potential Solution? – Tweak the current regime Ofgem conclusions from UNC 088 “No conclusive information has been provided with regard to the savings customers could make as a result of being a DM(AMR) site in comparison to being a DM site. In addition analysis has not been undertaken to understand the extent to which the costs and the perceived complexity of becoming an elective DM site can and do create a barrier to customers electing to be Daily Read. Furthermore, there has been no analysis of whether there are alternative ways of addressing the complexity and cost of the DM regime”.

4 Industry Review Proposal 175 – Encouraging participation in the elective DM regime” Gaz de France ESS Encourage wide industry participation via initial review group rather than a firm proposal Objective is to deliver a cost effective and workable regime Deliver benefits for customers Cost savings for multi-site and single site Daily/Real-time information provision to enhance awareness and enable energy efficiency Offer new and enhanced products and services Enable more accurate billing from suppliers Reduce reconciliation risk for shippers Tie in daily forecast and settlement regime Shippers have commercial incentive to forecast accurately and eliminate forecast error

5 Commercial incentives for shippers Reduce reconciliation risk for shippers Transporter demand forecast error consistent 3% average Risk is forward contract price v’s System Average Price Risk can be eliminated by a joined up DM regime

6 Barriers to Participation Cost of Being Daily Metered £800 pa Technical Barrier – aged meters with no pulsed output 50-60% of portfolio Penalty charges – Capacity related ratchet charges Onerous operational process and obligations NDM Band Meter count (total) Elective DM % Elective DM Bands , % Bands ,8701, % Total 436,874 1,3430.3%

7 Efficient change Changes should be economic for suppliers and customers and should be achieved through Best use of existing systems and processes Using reliable technology that meets supplier and customer expectations Enabling suppliers to act as their own (or sub-contract) Daily Metered provider Ensure obligations and commercial incentives are appropriately placed and weighted

8 Jigsaw What are Berr/Ofgem policy objectives? What is the timetable for reform? How does our proposed approach fit with Berr/Ofgem policy objectives? Policy Objective Customer Requirement Commercial Drivers Technical Solution Industry solution must encompass

9 Proposed Workplan (Meetings 1-3) Meeting 1 – Establish terms of reference for the group Understand background to the proposal Meeting 2 – Identify potential models for change Assess relative benefits (pro’s and cons) Meeting 3 – Agree best model for development Development plan

10 Questions and contact details Any Questions? or