Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
PoA Challenges & Opportunities
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
Transparency and promotion of the CDM
SDM Strategy SDM Joint Coordination Workshop
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
JI Governance – review of JI Guidelines
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
The CDM Policy Dialogue Margaret Mukahanana-Sangarwe Member, High-level Panel on the CDM Policy Dialogue FIRST SDM JOINT COORDINATION WORKSHOP Bonn, Germany,
UNFCCC secretariat, SDM Ronald Twesigye, Fellow A Case Study on The Uganda Municipal Solid Waste Compost Program The Seventh CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
UNFCCC secretariat Enhanced Interactions and Direct Communication – Policy matters First SDM Joint Coordination Workshop Bonn, Germany, March 2012.
Wrap-up session for Module 2.1 (Additionality) Presenters: UNFCCC secretariat, MP member, PD Forum, and TÜV SÜD 1 st Sustainable Development Mechanisms.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Motoharu Yamazaki, Programme Officer, Process Management Unit REVISION OF VALIDATION AND.
Validation and verification report templates
Presentation title 1st Sustainable Development Mechanisms Joint Coordination Workshop Module 2.4 Materiality Bonn, Germany, 24–25 March 2012 Marsha Cheddi.
UNFCCC secretariat, SDM Verónica García, Team Lead of Entity Assessment ASSESSMENT TEAMS 7 th CDM Joint Coordination Workshop Bonn, Germany March 12, 2011.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
CCS – OVERVIEW OF THE MODALITIES AND PROCEDURES AND THEIR IMPLEMENTATION SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Dhirendra KUMAR UNFCCC Secretariat, Sustainable Development Mechansims Programme New Registration and Issuance Procedures 7 th CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
UNFCCC secretariat, SDM Olof Bystrom, Programme Officer Module 1.4 JI Project Cycle - Status of Implementation 1st SDM Joint Coordination Workshop Bonn,
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Ms. Daniela Stoycheva Chair of the JISC COP/MOP 2, Nairobi 14 November 2006 JI Track 2 procedure and its role in JI Track 2 projects UNFCCC Side Event.
An Introduction to the: Carbon Markets & Investors Association Promoting efficient market solutions to combat climate change A project developer’s.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
1st Sustainable Development Mechanisms Joint Coordination Workshop The Implementation of the VVS and the PCP - the DOEs' perspective DOE/AE Forum | Werner.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
Module Calibration regarding accreditation assessment requirements Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs)
Roster of experts of the clean development mechanism (CDM) 11 June 2003 Mikhail Vartanian & Kay Merce CDM / Cooperative Mechanisms.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Activities on regional distribution of Clean Development Mechanism (CDM) Projects With reference to LDCs.
UNFCCC secretariat, SDM Rocío N. Correia, Associate Programme Officer Efforts undertaken to deliver the expected work Singapore, 28. October 2010.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Clean Development Mechanism
JISC – work accomplished and challenges ahead
Enhanced Interaction and Direct Communication
Work Accomplished by JISC
Presentation transcript:

Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta Accreditation Panel - Methodologies Expert - RIT First SDM Joint Coordination Workshop Bonn, March 2012

Aim “to calibrate the understanding of the new requirements under the new package of documents, i.e. post registration changes and other cross cutting issues; and to discuss the role of each stakeholder during their implementation (PP, DOE, RIT member, secretariat). We kindly request you to speak for 10 minutes on the implementation of the new package of documents (PCP, VVS and PS), from the RITs' perspective. As the new package of documents is not applicable yet, we are looking for a presentation on what it is foreseen with regard to the upcoming implementation of the documents, taking into account your experience as an RIT member.” (2/9)

Objectives CDM Project Cycle Procedure (v. 01.0, EB65, November 2011, annex 32) 4. The objectives of the Clean development mechanism project cycle procedure are to: (a)Improve the consistency and clarity in processing by the Board and the UNFCCC secretariat (hereinafter referred to as the secretariat) of the submissions of documents relating to the registration of a proposed CDM project activity or PoA and issuance of CERs; (b)Enhance the overall efficiency and integrity of the CDM. (3/9)

Objectives CDM Project Standard (v. 01.0, EB65, annex 5) 5. The objectives of the Clean development mechanism project standard are to: (a)Enhance consistency and clarity of requirements applicable to any type of CDM project activities and CDM programmes of activities (PoA), and facilitate and promote a clear and common understanding by all parties involved in the CDM; (b)Improve the quality of project design documents (PDDs), PoA design documents (PoADDs), component project activity (CPA) design documents (CPA-DDs) and monitoring reports prepared by project participants and submitted in the CDM project cycle; (c)Enhance the overall efficiency and integrity in the CDM. (4/9)

Objectives CDM Validation and Verification Standard (v. 02.0, EB65, annex 4) 4. The objectives of the Clean development mechanism validation and verification standard are to: (a)Enhance consistency and clarity of minimum requirements for all types of CDM validation and verification activities; (b)Improve the quality and consistency in the preparation, execution, and the reporting of validation and verification activities; (c)Enhance the overall efficiency and integrity in the CDM. (5/9)

Implementation Plan for the Clean Development Mechanism PS, VVS and PCP (version 01.0, EB65, annen 6) as one of the main purposes of developing these new documents was to consolidate existing provisions into fewer documents. For example, many existing regulatory documents will be cancelled… 8. (a) The necessary time for PPs and designated operational entities (DOEs) to adjust their systems to follow the new standards and procedures, considering that the PS, VVS and PCP are mainly a consolidation of existing provisions, with only some new provisions; Appendix 1: Number of documents to be revised, 22 Appendix 1: Number of documents to be developed, 6 Appendix 1: Number of documents to be revised, 40 (6/9)

Timelines PDD/MR publication under the old rules up to 1.May.2012 Registration and issuance requests under the old rules up to 1.Oct.2012 (7/9)

Conclusion? “…what it is foreseen with regard to the upcoming implementation of the documents, taking into account your experience as an RIT member.” My answer: LESS IS MORE (8/9)

Conclusion? Andrea del Sarto, 1855, by Robert Browning ( …Who strive - you don't know how the others strive To paint a little thing like that you smeared Carelessly passing with your robes afloat,- Yet do much less, so much less, Someone says, (I know his name, no matter) - so much less! Well, less is more, Lucrezia… The phrase is also often associated with Ludwig Mies Van Der Rohe ( ), one of the founders of modern architecture and a proponent of simplicity of style. But what does the RIT member means with “less is more”? The floor is open. (9/9)