NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.

Slides:



Advertisements
Similar presentations
Reliability in the International Arena Alberta Perspective
Advertisements

1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Standards Development and Approval Process Steve Rueckert Director of Standards Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
NERC Orientation Joint Guidance Committee WECC Leadership
Reliability Provisions of EPAct of 2005 & FERC’s Final Rule
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Adherence with Regional Criteria WECC Reliability Policy Issues Committee Meeting February 19, 2009 Michelle Mizumori Director of Market Operations Interface.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
Final Thoughts on NAESB & NERC Participation EPSA Regulatory Affairs Conference October 25, 2006.
Compliance Application Notice Process Update and Discussion with NERC MRC.
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
Nuclear Power Plant “Bright-Line” NERC:. Tim Roxey and Jim Hughes NRC:
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
FDA shall issue a certification for those FDA licensed establishments applying for amendment during the validity of their Licenses to Operate. This certification.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
NERC as the ERO Craig Lawrence Manager of Organization Registration, Certification, and Compliance Monitoring.
NERC Compliance Program Overview FRCC 2007 Compliance Workshop April 4 and 11, 2007.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Mark E. Hegerle Deputy Director, Reliability Office of Energy Markets & Reliability Federal Energy Regulatory Commission EUCI: Disaster Management and.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Overview of WECC and Regulatory Structure
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Date Meeting Title (optional) Enforcement and Sanctions Presenter Name Presenter Title (Optional)
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
Transmission Owners and Operators Forum NERC Stakeholders Meeting 8/1/06 Ad-Hoc T. O. O. Forum Group.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
The Electric Reliability Organization NERC’s Proposal for a Strong and Effective ERO FRCC System Operator Seminar Spring 2006.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Updated ERO Enterprise Guide for Internal Controls
NERC Entity Registration and Certification in the ERCOT Region
Welcome to the GADSTF Meeting
MAC Board Effectiveness Survey
Background (history, process to date) Status of CANs
GMD Data Request NERC Rules of Procedure Section 1600
Workshop Session 1: Overview
The Electric Reliability Organization: Getting from here to there.
Mandatory Reliability Standards
Workshop Session 1: Overview
Nuclear Power Plant “Bright-Line” NERC:. Tim Roxey and Jim Hughes NRC:
MAC Board Effectiveness Survey
Document Categorization Policy
Standards Development Process
Presentation transcript:

NERC Data Collection & Coordination

Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained in FERC’s rules. Volume 18 C.F.R. Section 39.2(d) states: “Each user, owner or operator of the Bulk-Power System within the United States (other than Alaska and Hawaii) shall provide the Commission, the Electric Reliability Organization and the applicable Regional Entity such information as is necessary to implement section 215 of the Federal Power Act as determined by the Commission and set out in the Rules of Procedure of the Electric Reliability Organization and each applicable Regional Entity.” 1

Rules of Procedure: Section 1600 Request Details  A complete data request includes: a description of the data or information to be requested, how the data or information will be used, and how the availability of the data or information is necessary for NERC to meet its obligations under applicable laws and agreements a description of how the data or information will be collected and validated a description of the entities (by functional class and jurisdiction) that will be required to provide the data or information (“reporting entities”) the schedule or due date for the data or information a description of any restrictions on disseminating the data or information (e.g., “confidential,” “critical energy infrastructure information,” “aggregating” or “identity masking”) an estimate of the relative burden imposed on the reporting entities to accommodate the data or information request 2

NERC Approval Committees Acting Subgroup Rules of Procedure: Section 1600 Procedure Draft Data Request Submit Data Request to DCS Submit Data Request to PC Not Approved Submit Data Request FERC Comment Period File Data Request (21 Days) Public Comment Period Post Data Request (45 Days) Collect, Respond, & Post Comments Finalize Data Request NERC Board of Trustees Submit Final Data Request Data Rule In Effect Affected Parties Appeal (30 Days) Approved Not Approved No Appeal 3

Rules of Procedure: Section 1600 Limitations  NERC Registered Entities  Subject to FERC Rules Data Request does not carry the same penalties to non-U.S. entities. However, all NERC Registered Entities, regardless of their country of origin, must comply with the NERC Rules of Procedure, and as such, are required to comply with Section

What If a GO Doesn’t Comply?  Possible NERC actions: From Rule 1603: “Owners, operators, and users of the bulk power system registered on the NERC Compliance Registry shall comply with authorized requests for data and information.” The data request must identify which functional categories are required to comply with the request. In this case, it presumably would be Generation Owners. 5

What If a GO Doesn’t Comply?  Possible NERC actions: NERC will audit the GADS data submittals through logical evaluations of the data reported and that previously reported by the entity. Reconciliation findings will be reviewed with the reporting entity. 6

What If a GO Doesn’t Comply?  Possible NERC actions: NERC may resort to a referral to FERC for only United States entities, not Canadian entities. NERC will make use of the mechanisms it has available for both U.S. and Canadian entities (notices, letters to CEO, requests to trade associations for assistance, peer pressure) to gain compliance with the NERC Rules. A failure to comply with NERC Rules could also be grounds for suspension or disqualification from membership in NERC. Whether or not NERC chooses to use that mechanism will likely depend on the facts and circumstances of the case. NERC cannot impose penalties for a failure to comply with a data request. 7

What If a GO Doesn’t Comply?  Possible FERC actions: All members of NERC (US and Canadian) are bound by their membership agreement with NERC to follow NERC’s Reliability Standards and Rules of Procedure, including section Under section 215 of the Federal Power Act, FERC has jurisdiction over all users, owners, and operators of the bulk power system within the United States. FERC could treat a failure by a U.S. entity to comply with an approved data request as a violation of a rule adopted under the Federal Power Act using its enforcement mechanisms in Part III of the FPA. 8

What If a GO Doesn’t Comply?  What about Canada? Canadian provinces who have signed agreements stating they recognize NERC’s ERO status, will be compliant with the NERC approved standards and Rules of Procedure issued by the NERC Board. The obligation arises for the Canadian utilities if they are members of NERC. For example, if Canadian Utility “A” is a member of NERC, then it must go by the Rules of Procedure, standards, etc. If Canadian Utility “X” is not a NERC member but its providence recognizes NERC as their ERO, then Utility “X” is not under obligation to follow the rules. 9

Questions?